CO FLAP SH 5(1) Mount Blue Sky Highway
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF24B000009
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Evergreen, Colorado 80439, United States
- Points of contact
-
- Denise Martinez cflacquisitions@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation Federal Highway Administration is issuing a pre-solicitation notice for the CO FLAP SH 5(1) Mount Blue Sky Highway project. The project proposes to reconstruct 0.7 miles of Colorado State Highway 5 in Clear Creek County, Colorado, located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. Principal work items include 20,000 cubic yards of embankment construction, 2,000 tons of aggregate base, 2,000 tons of asphalt concrete pavement, 200 linear feet of metal pipe culverts, 4,000 square yards of salvaging/placing conserved topsoil, and 5 miles of pavement markings.
This opportunity is set aside for total small business. The anticipated cost range for the project is between $5,000,000 and $10,000,000. Construction is scheduled to start in July 2024 and finish in October 2025.
Notice text
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE
PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway
PROJECT DESCRIPTION:
The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH)
5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver
in the Arapaho and Roosevelt National Forest.
SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the
highest paved road in the United States. The project area is adjacent to Summit Lake Park located at
13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with
temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States
Forest Service and Denver Mountain Parks Lands.
The project area is distressed with major subgrade failures. The roadway was originally constructed
across a wetland complex causing disruption to both surface and subsurface water flow which has led to
degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have
caused major damage to the roadway including settlement, subgrade failure, and cracking.
The project scope includes roadway reconstruction with a pavement section supported upon an air
convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and
stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and
will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include
removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation
salvage and placement, sub excavation, aggregate subgrade, and asphalt paving.
PRINCIPAL WORK ITEMS:
- 20,000 cubic yards of embankment construction including rock embankment
- 2,000 tons of aggregate base
- 2,000 tons of asphalt concrete pavement
- 200 linear feet of metal pipe culverts
- 4000 square yards of salvaging/placing conserved topsoil
- 5 miles pavement markings, type b
ANTICIPATED SCHEDULE:
Advertise: May 2024
It is anticipated construction will start approximately July 2024 and finish approximately October
2025.
ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and
$10,000,000.
Attachments
| File | Type | Posted |
|---|---|---|
| Pre Solicitation - Mount Blue Sky Highway.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| CO FLAP SH 5(1) Mount Blue Sky Highway | Award Notice | |
| CO FLAP SH 5(1) Mount Blue Sky Highway | Solicitation | |
| CO FLAP SH 5(1) Mount Blue Sky Highway | Pre-Solicitation | |
| CO FLAP SH 5(1) Mount Evans Highway | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity