Clear Creek Power Conduit Tunnel Lining Repair
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140R2024R0013
- Agency
-
Bureau of Reclamation
Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Reclamation intends to issue a Request for Proposal (RFP) for a firm fixed-price construction contract to repair the Clear Creek Power Conduit Tunnel Lining in Redding, California. The work includes removing and replacing damaged concrete lining, addressing weep holes, and controlling water. The objective is to extend the tunnel's service life to 75 years. The solicitation will be issued under FAR Part 15 procedures, with proposals due approximately on June 14, 2024. Interested parties should direct questions to Rosana Yousef Goarji via email.
This procurement is set aside for Total Small Business. The estimated project cost is between $5,000,000.00 and $10,000,000.00, and will require 100% performance and payment bonds. The applicable NAICS code is 237990 with a $45M size standard. No paper copies of the solicitation will be distributed, and prospective contractors must be actively registered in the SAM database to be eligible for award.
Notice text
The California Great Basin Region of the Bureau of Reclamation intends to issue a Request for Proposal (RFP) for a firm fixed-price construction contract for Clear Creek Power Conduit Tunnel Lining Repair. This procurement is set-aside for Total Small Business. Solicitation will be issued as a Request for Proposal (RFP) using FAR Part 15, contracting by Negotiation Procedures. The work to be performed is described below. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $45M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this project is between $5,000,000.00 and $10,000,000.00. This procurement will require 100% performance and payment bonds. The work is located at U.S. Bureau of Reclamation, Redding, California.
PRINCIPAL COMPONENTS OF WORK:
Principal features of work include removing existing damaged concrete lining; replacing damaged concrete lining; oversizing existing weep holes; drilling and installing new weep holes; plugging piezometer openings; backfilling gravel drain voids with grout; and control and removal of water.
The Project objective is to effect repairs that allow the tunnel to reach its 75-year service life by:
• repairing damage to the concrete tunnel lining, and
• prevent future damage from uplift forces by clearing existing weep holes and creating new weep holes where appropriate.
Solicitation 140R2024R0013 will be posted electronically via www.sam.gov on or about May 15, 2024. The date for receipt of proposals will be approximately June 14, 2024. The solicitation must be downloaded at the above website; no paper copy of this solicitation will be distributed.
Prospective contractors MUST be actively registered in the System for Award Management (SAM) database at http://www.sam.gov to be eligible for award.
Questions concerning this solicitation should be directed to Rosana Yousef Goarji via email at ryousefgoarji@usbr.gov.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Clear Creek Power Conduit Tunnel Lining Repair | Award Notice | |
| Clear Creek Tunnel Lining Repair | Solicitation | |
| This notice | Pre-Solicitation | |
| Clear Creek Tunnel Lining Repair | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| LB Lateral Water Line and Facilities Replacement for Wastewater System | — | No set-aside | |
| Brine pipeline access improvements | ENDIST Los Angeles | Total Small Business | |
| Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site | ENDIST Omaha | No set-aside | |
| Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Up | — | Service-Disabled Veteran-Owned Small Business | |
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA | ENDIST Sacramento | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity