Clear Creek Dam Fish Passage Facility, Yakima Project, Washington
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140R1024R0015
- Agency
-
Bureau of Reclamation
Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The Bureau of Reclamation, Columbia-Pacific Northwest Region, Columbia-Cascades Area Office has a need for construction services for the Clear Creek Dam Fish Passage Facility project located in Yakima, Washington. The work includes constructing a fish ladder, cofferdam, unwatering systems, earthwork, dam gate automation, electrical upgrades, and a new access road. The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction, with a small business size standard of $45.0 million in average annual receipts. The Rough Order of Magnitude (ROM) estimate for the project is between $15-20 million. The solicitation will be issued no sooner than 15 days from the notice date on SAM.gov and will close approximately 30 days after issuance.
Paragraph 2:
This procurement will be competed as a total small business set-aside. There is no information provided about any potential incumbents or current contractors. The solicitation documents will be available on SAM.gov, and interested small businesses must be registered in SAM.gov. The primary points of contact are the USBR Contract Specialist Drew McGuire and Contracting Officer Lance Fleming.
Notice text
Synopsis of Proposed Contract Action
Description
The Bureau of Reclamation, Columbia-Pacific Northwest Region, Columbia-Cascades Area Office has a need for construction services for Clear Creek Dam Fish Passage Facility. Work is located at Clear Creek Dam, approximately 45 miles east of Yakima, Washington, in Yakima County. Work is for Clear Creek Dam Fish Passage Facility construction.
Principal components of the work include:
¿ Mobilize to site and demobilize from site.
¿ Construct a fish ladder at Clear Creek Dam
¿ Design, construct, and remove a cofferdam.
¿ Install and maintain unwatering systems for removal and control of water within excavations during construction.
¿ Maintain minimum reservoir releases during construction.
¿ Install pump and piping.
¿ Place and compact zoned earthfill embankment materials within outlet works conduit excavation and new stability berm over outlet works conduit extension.
¿ Furnish and install dam gate automation with remote tie-in.
¿ Install site lighting and upgrade existing electrical system.
¿ Excavate electrical trenches and furnish and install new electrical conduit.
¿ Construct new access road.
¿ Install erosion control measures and complete restoration activities.
The North American Industry Classification System (NAICS) code associated with this project is 237990 Other Heavy and Civil Engineering Construction. The small business size standard applicable to this project is $45.0 million in gross annual receipts averaged over the previous three 1-year accounting periods. The Rough order of Magnitude (ROM) for this project is between $15,000,000.00 and $20,000,000.00. This procurement will be competed as a total small business set-aside. Proposals will be accepted from all responsive and responsible small business concerns.
An electronic copy of the solicitation will be issued no sooner than 15 days from the day after this notice at www.sam.gov, however, dates in this notice are subject to change. The solicitation will close approximately 30 days after its issuance. Any amendments applicable to the solicitation will be posted at the same site. To take advantage of business opportunities with the Bureau of Reclamation (BOR) and the Department of the Interior (DOI) you must register your entity must be registered in SAM.gov. For more information regarding registering in SAM, please visit https://sam.gov/content/entity-registration.
The primary Point of Contact for this requirement is USBR Contract Specialist, Drew McGuire, Email: DMcGuire@usbr.gov, or the Contracting Officer, Mr. Lance Fleming, Email: Lfleming@usbr.gov.
Files
| File | Type | Posted |
|---|---|---|
| Presolicitaiton_Synopsis_CCFP_4.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Clear Creek Dam Fish Passage Facility, Yakima Proj | Award Notice | |
| Clear Creek Dam Fish Passage Facility, Yakima Rive | Solicitation | |
| This notice | Pre-Solicitation | |
| Clear Creek Dam Fish Passage Facility, Yakima Project, Washington | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| LLA Navigation Lock Switchgear | ENDIST Walla Walla | Total Small Business | |
| Cableway crane refurbishment | Bureau of Reclamation | No set-aside | |
| YELL 338223 - Bridge Preservation | — | No set-aside | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| FY26 Clouter Creek Middle and Highway Cell Diking | ENDIST Charleston | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity