CJD Inverter Replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912DW24Q0011
Agency
ENDIST Seattle US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing
PSC
5999 Miscellaneous Electrical And Electronic Components
Place of performance
Bridgeport, Washington 98813, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks bids to supply eight 5kVA inverters to the Chief Joseph Dam project for the U.S. Army Corps of Engineers, Seattle District. Technical specifications require the inverters to meet detailed voltage, current, communications, efficiency, and performance parameters. Bids are due by January 24, 2024 with equipment delivery within 150 days of award.

The procurement is set aside for total small businesses. The single CLIN covers all eight inverters to be installed at Chief Joseph Dam in Bridgeport, Washington. No incumbent or budget is identified. Bidders must demonstrate capability to provide new inverters, manuals, drawings, and licensing to meet the solicitation requirements.

Notice text

 

                                                     Chief Joseph Dam RTU Inverter Replacement

MATERAILS REQUIRED: Materials will be inspected at the delivery point prior to acceptance. Contractor shall be responsible for maintaining the product’s condition as specified until the point of acceptance. Vendors shall supply the following items in the sizes and quantities specified to satisfy the requirements of this contract. New equipment only; no remanufactured or “gray market” items. All items must be covered by manufacturer’s warranty.

DELIVERY LOCATION:

US Army Corps of Engineers Chief Joseph Dam

Highway 17 and Pearl Hill Rd Bridgeport, WA 98813-1120

Note: All items shall be delivered FOB destination to Chief Joseph Dam within 150 days of contract award. No shipments are allowed other than normal business hours of Monday through Thursday 0700 – 1600, excluding federal holidays.

Contractor shall supply eight (8) inverters to the specification below. All eight inverters shall be identical in make and model to each other.

INVERTER SPECIFICATIONS:

5kVA Inverter DC Input:

Voltage: 125VDC Nominal

Low Voltage Cutoff: 105-110VDC High Voltage Cutoff: 140-150VDC DC Low Voltage Reset: 115VDC Current: 34-40A DC

AC Line Input:

Voltage: 105-135 VAC, 120VAC Nominal Frequency: 58.5 – 61.5 Hz, 60 Hz Nominal Current: 30-50A AC

Output:

Voltage: 120VAC Frequency: 60Hz

Current: 30-50A AC Maximum

Pad-lockable Circuit Breakers for both DC input and Bypass circuits. Cable Entry for the inverter shall be from the bottom.

PCB Conformal Coating Fungus and Moisture Proof Front Panel Display:

Display shows at a minimum Model Number, Serial Number, KVA, Voltage (DC, AC, Bypass), Amperage (DC, AC, Bypass), Hertz, Date and Time

Display has detailed indications showing critical information to the user, such as normal and abnormal conditions, faults, and troubleshooting information for the inverter.

Annunciation on the panel should contain the following (at a minimum): Bypass Source Failure

Bypass Supplying Load

Fan Failure – If manufacture recommends fan cooling. Inverter Failure

Low DC Voltage DC Breaker Open High DC Voltage

Ground Fault (with ability to disconnect if affecting plant ground fault detection) Overtemperature

Low AC Output Voltage High AC Output Voltage Fuse Blown

Overload Shutdown

Annunciation shall have a test alarm function.

Communications - Modbus TCP Humidity:

0 to 95% with no condensation

Inverters shall conform to UL 1778 and NEMA 250.

The inverters steady state output voltage regulation shall not change more than +/- 2 percent under any of the following conditions:

  1. 0-100 percent and 100-0 percent load change
  2. Minimum to maximum DC bus voltage

The harmonic distortion shall be less than 5 percent total harmonic distortion.

Overload Capability: The inverters shall, at a minimum, be capable of suppling loads up to 100 percent of the rated load continuously, 125 percent of the rated load for a minimum of 10 minutes without transfer to the bypass, 150 percent of the rated load for 1 minute without transfer to the bypass.

Over Temperature: Upon heat sink over temperature, the inverters shall automatically transfer the load to the bypass source. If the overtemperature occurs for more than 60 seconds, the DC/battery input breaker shall trip protecting the bridge from damage. Manual retransfer of the load onto the inverters shall be permitted only after the temperature returns to normal.

Cooling: The inverter shall be designed for ambient temperatures of 0 to 40 degrees Celsius, and forced air cooled if recommended by manufacture in those ambient temperatures.

Audible noise at 1.5 meters shall be less than 72 dBA

Each inverter efficiency shall be at least 85 percent at full load.

The inverters shall include a high-speed, static transfer switch. It shall provide an automatic transfer of the load to the bypass if any of the following conditions occur:

  1. The inverter bridge fails.
  2. The inverter overcurrent condition occurs.
  3. The inverter outputs an over/undervoltage +/- 10 percent for longer than 1 cycle.
  4. Low DC disconnect.
  5. The manual pushbutton is operated.

Inverters shall have a manual bypass switch.

    1. The manual bypass switch for each inverter shall be an integral part of the inverter that is a make-before-break switch used to bypass the inverter and static transfer switch for maintenance purposes.
    2. An indicator light shall be provided to indicate the following conditions (as a minimum):
      1. Bypass and normal source in-sync
      2. Bypass source available
      3. Normal source available
    3. There shall be a front cabinet accessible means for testing the indicating lights of each manual bypass switch.
    4. Each manual bypass switch shall have three (3) positions as follows:
      1. Normal – Load fed from inverter.
      2. Test – Load fed from bypass source through manual bypass switch.
      3. Bypass – Load fed from bypass source, completely isolating the manual bypass switch and the inverter.

Spare parts: At a minimum, provide two of each printed circuit board, spare fuses, spare fans, and provide spare consumables used for maintenance.

Footprint mounting shall not exceed 36” x 36”.

All software and licensing for inverters will be supplied.

Inverters will come with two complete sets of Operation and Maintenance Manuals as well as Drawings for troubleshooting.

Attachments

Files attached to this notice, newest first
File Type Posted
W912DW24Q0011 Request For Quote.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
CJD Inverter Replacement Award Award Notice
CJD Inverter Replacement This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity