City of McMechen, West Virginia, Stormwater Project - Section 219
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911WN26BA007
- Agency
-
ENDIST Pittsburgh
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- McMechen, WV 26040
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting bids for stormwater system installation and utility relocation in the City of McMechen, West Virginia, with bids due May 19, 2026. This is a 100% Small Business Set-Aside; the Small Business size standard is $45,000,000.
Place of performance is entirely on property of the City of McMechen. Work includes demolition and relocation of existing water, sewer, and gas lines; installation of new corrugated storm line with WVDOH Wingwall and Culverts; installation of a new HDPE sewer line with precast Manhole; and reconnection of all existing utilities and service lines. Construction waste will be disposed of at a landfill. Physical construction is proposed to take place between Spring 2026 and Fall 2026, with Period of Performance of 365 calendar days after written Notice to Proceed.
The award will be one Firm-Fixed Price contract. NAICS code is 237110, Water and Sewer Line and Related Structures Construction; PSC code is Y1NZ, Construction Of Other Utilities. Three bids were received on May 19: MW Solutions, LLC at $1,275,250.00; Brannon Contracting & Maintenance Services, LLC at $1,940,314.00; and Kovlic Construction Company, Inc. at $2,796,375.00. The Independent Government Estimate was $3,200,118.93. All responsible bidders were encouraged to submit bids. Contract documentation and amendments are available through PIEE.
Notice text
2 versions
Update #2 · Latest ·
The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to install and upgrade the existing storm sewer system, along with relocating existing water, sewer and gas lines, in the City of McMechen. The major feature of the Project generally involves the following: Demolition and Relocation of existing water, sewer and gas lines. Installation of new corrugated storm line with WVDOH Wingwall and Culverts. Installation of a new HDPE sewer line with precast Manhole. Reconnection of all existing utilities and service lines to existing sewer, water and gas customers. The work is to be performed entirely on property of the City of McMechen. Project physical construction is proposed to take place in the period between Spring 2026 and Fall 2026. This would allow the Contractor to perform all necessary work. Disposal of construction waste material will be disposed of at a landfill. The NAICS Code is 237110 ? Water and Sewer Line and Related Structures Construction, and the Small Business Size Standard is $45,000,000.00. This procurement is 100% Small Business Set Aside. Any resultant award will be for one (1) Firm-Fixed Price (FFP) Contract. All responsible Bidders are encouraged to submit a Bid. The Period of Performance (POP) is 365 Calendar Days after written Notice to Proceed (NTP). NOTE: To obtain the documents for this Project, please click the First Hyperlink in SAM.gov under Links. All documentation and any applicable Amendments will be made available for view/download in PIEE. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.
Update #1 ·
The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to install and upgrade the existing storm sewer system, along with relocating existing water, sewer and gas lines, in the City of McMechen. The major feature of the Project generally involves the following: Demolition and Relocation of existing water, sewer and gas lines. Installation of new corrugated storm line with WVDOH Wingwall and Culverts. Installation of a new HDPE sewer line with precast Manhole. Reconnection of all existing utilities and service lines to existing sewer, water and gas customers. The work is to be performed entirely on property of the City of McMechen. Project physical construction is proposed to take place in the period between Spring 2026 and Fall 2026. This would allow the Contractor to perform all necessary work. Disposal of construction waste material will be disposed of at a landfill. The NAICS Code is 237110 ? Water and Sewer Line and Related Structures Construction, and the Small Business Size Standard is $45,000,000.00. This procurement is 100% Small Business Set Aside. Any resultant award will be for one (1) Firm-Fixed Price (FFP) Contract. All responsible Bidders are encouraged to submit a Bid. The Period of Performance (POP) is 365 Calendar Days after written Notice to Proceed (NTP). NOTE: To obtain the documents for this Project, please click the First Hyperlink in SAM.gov under Links. All documentation and any applicable Amendments will be made available for view/download in PIEE. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.
4/15/2026 Site Visit held, Sign-in Sheet uploaded.
Files
| File | Type | Posted |
|---|---|---|
| Bid Results.pdf | ||
| Bid Opening Sign In Sheet.pdf | ||
| Site Visit Sing-in Sheet.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| City of McMechen, West Virginia, Stormwater Project - Section 219 | Award Notice | |
| This notice | Solicitation | |
| City of McMechen Stormwater Project - Section 219 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Pittsburgh facility 079 MEP parking lot erosion control | ENDIST Philadelphia | No set-aside | |
| Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside | |
| JBMHH Stormwater Management Facility Maintenance and Repair Services | MICC Fort Sam Houston | No set-aside | |
| Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades | Franchise Acquisition Servies | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity