Circuit card assemb
Closed Solicitation Posted
- Solicitation number
- N0010426QSC60
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 334412 Bare Printed Circuit Board Manufacturing
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Supply Systems Command is soliciting quotes for the repair of a Circuit Card Assembly (NIIN 017025021) through Request for Quotation N00104-26-Q-SC60. The solicitation seeks teardown, evaluation, repair, and/or modification services for one unit currently in "A" condition stock. Key contract requirements include compliance with Government Source Inspection (GSI), adherence to MIL-STD-2073 packaging standards, and mandatory cybersecurity compliance per NIST SP 800-171. The government's primary evaluation criterion is the contractor's ability to meet an 80-day repair turnaround time (RTAT) measured from asset receipt to government acceptance, with quotes required to include unit price, total price, and proposed RTAT. Quoters unable to meet the 80-day requirement must provide detailed capacity constraint information. The submission deadline is April 20, 2026, with the solicitation posted on April 14, 2026.
This solicitation carries no set-aside designation and does not identify any incumbent contractors. No specific award value or budget range is provided in the solicitation materials. The contract will be structured as a bilateral award requiring the contractor's written acceptance prior to execution, with all freight on a FOB Origin basis handled by the Navy through the Commercial Asset Visibility (CAV) system. An optional quantity of up to 100% of the base item is available for future orders. Price reductions of 1% per unit per month will apply for contractor delays exceeding the RTAT unless excusable delay is demonstrated. The place of performance will be the contractor's facility as reflected in the CAV system, with detailed reporting and transaction documentation required within five business days of asset receipt.
Notice text
SOLICITATION NOTES:
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor's written acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 80 days
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset
Visibility (CAV) Statement of Work.
Your quote should include the following information:
***************QUOTE AMOUNT AND RTAT ***************
Unit Price:__________
Total Price:__________
Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government's Required Repair Turnaround
Time (RTAT) or earlier, provide your company's capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to
accurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt. The Contractor must obtain final
inspection and acceptance by the Government for all assets within the RTATs
established in this contract.
*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
*Return Material Authorization # (RMA), if applicable:__________
*Delivery Vehicle (if Delivery Order requested) (if your company has a current
BOA/IDIQ, for example) :__________________
***************TESTING AND EVALUATION IF BEYOND REPAIR***************
* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR, the contracting officer will negotiate a
reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
* The T&E fee (if asset is determined BR/BER) was determined/computed based
on:______________________________________.
***************AWARDEE INFO & PERFORMANCE LOCATION***************
Awardee CAGE: __________
*Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________
* Facility/Subcontractor CAGE (where the asset should be shipped), if not same
as ""awardee CAGE"":__________
*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
*New unit price:__________
*New unit delivery lead-time:__________
The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity
of supplies called for in the Schedule at the unit price specified. The
Contracting Officer may exercise the option by written notice to the
Contractor within the number of days in FAR 52.217-6 herein. Delivery of the
added items shall continue at the same rate as the like items called for under
the contract, unless the parties otherwise agree.
IMPORTANT NOTE: Any asset for which the contractor does not meet the required
RTAT will incur a price reduction per unit/per month the contractor is late -
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If a price reduction is required due to unexcusable
contractor delay, the Contracting Officer will implement the aforementioned
price reduction via a ""reconciliation modification"" at the end of the
contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet
required RTATs, including but not limited to the Government's right to
terminate for default.
In reference to the above important note, the contractor provides the
following price reduction amount per unit per month the contractor does not
meet the RTAT: 1% of unit price, per unit, per month.
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: BRETT.A.DEPALMA.CIV@US.NAVY.MIL
Files
| File | Type | Posted |
|---|---|---|
| 3.01_RFQ_N0010426QSC60_25296-0046.PDF |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Circuit card assy | Naval Supply Systems Command | No set-aside | |
| Circuit card assemb | Naval Supply Systems Command | No set-aside | |
| Circuit card assemb | Naval Supply Systems Command | No set-aside | |
| Circuit card assemb, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Circuit card assemb | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity