Chief Joseph Dam Powerhouse Sump Pumps and Controls

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912DW24R0025
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Seattle District, is seeking to rehabilitate the Chief Joseph Dam Powerhouse drainage and unwatering sump, pumps, motors, and controls. The work includes replacement of piping and valves, installation of new pumps and controls, and incidental work such as replacement of a jib hoist and installation of a monorail hoist. The contract will be awarded using the Best Value Trade-off (BVTO) method, and the resulting contract will be a Fixed-Price Contract. The estimated cost range for this construction contract is between $5,000,000 and $10,000,000.

This opportunity is not set aside for any particular program. The work is to be performed at the Chief Joseph Dam Powerhouse, and the solicitation will be issued to interested contractors. The contract has a due date of October 15, 2024, and questions should be addressed prior to the solicitation's posting.

Notice text

OVERVIEW: The U.S. Army Corps of Engineers (USACE), Seattle District, requires rehabilitation of the Chief Joseph Dam Powerhouse drainage and unwatering sump, pumps, motors, and controls. The work includes replacement of piping and valves, installation of new pumps, controls and removal of the existing pumps and controls. Incidental work includes replacement of a jib hoist, installation of a monorail hoist, replacement of sump lighting, and improvements to the sump access, including removal of existing and installation of new ladders, platforms, and hatches. The following is a list of the major items of work included in the scope of work. The work includes but is not limited to the following modifications to the existing components and systems:General Work1. Mobilization and Demobilization2. Demolish Pumps and Piping3. Demolish Control Systems and Breakers4. Demolish platforms, ladders, hatches, concrete, and structural systems for the tailrace discharge valve, drainage sump access, unwatering sump access, pump discharge valve support catwalk, and dry sump discharge valve access. 5. Clean unwatering pipes and dispose of waste material.6. Clean sump and dispose of waste material.Mechanical Systems Work1. Design, fabrication, installation, and testing of three 75HP vertical turbine pump assemblies including motor, mounting, sole plate and grout pad, vacuum breaker, packing gland, column shafting, bowls, and impellers.2. Replace isolation and check valves, piping, and pipe connections in both the dry and wet sumps.3. Design, fabrication, installation and testing of submersible pump cross sump transfer system including rail mounting system. 4. Install monorail and hoist for supporting access and maintenance to the cross-sump transfer.5. Replace dry sump drainage system including piping and a submersible pump.6. Replace 16? flow control piping and supports in unwatering sump.7. Remove and replace jib hoist and associated equipment and systems to uprate capacity.Controls Work1. Supply, Installation and commissioning of comprehensive pump control systems including relays, terminal blocks, and circuit breakers, soft starters, ultrasonic level sensors, resistance temperature detectors, machine condition monitoring, and float switches for new pumps, equipment, and systems.Structural Work:1. Design, Fabricate, Install platforms, ladders, hatches, foundations, and structural systems. 2. Furnish all labor, equipment, and materials to design and provide seismic restraints for new systems and equipment. 3. Concrete coring for new pipes through existing sump walls.The magnitude of this construction contract cost is between $5,000,000 and $10,000,000. A Request for Proposal (RFP) will be issued to interested contractors using the Best Value Trade-off (BVTO) method for trade-offs between non-price factors and price. The resulting contract will be a Fixed-Price Contract, representing full payment for the clearly defined work. Please refer to attached solicitation for complete details.

Notice history

Notice Type Posted
Chief Joseph Dam Powerhouse Sump Pumps and Controls Award Award Notice
This notice Latest solicitation Solicitation
Pre-solicitation-Chief Joseph Dam Powerhouse Sump Pump and Controls Pre-Solicitation
Sources Sought -Chief Joseph Dam Powerhouse Sump Pump and Controls Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
LLA Fish Pump - Motor Rewind Pomeroy, Washington 99347, United States · NAICS 811310 ENDIST Walla Walla No set-aside
John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007) Near Rufus, Oregon 97050 · NAICS 238220 ENDIST Portland No set-aside
Navigation lock tainter valve (TV) repair, TV1 The Dalles Dam (Washington side), Lyle, WA 98635. 98635 · NAICS 237990 ENDIST Portland No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors