Chief Joseph Dam (CJD) National Pollutant Discharge Elimination System (NPDES) Laboratory Services - Base plus 4 Option Years
Closed Pre-Solicitation Posted
- Solicitation number
- PANNWD26P00000029105
- Agency
-
ENDIST Seattle
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541380 Testing Laboratories and Services
- Place of performance
- Bridgeport, Washington, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Seattle District is conducting market research via a sources-sought notice to determine contractor interest and capability for NPDES laboratory analytical services supporting Chief Joseph Dam, with responses due August 14, 2026. This is not a commitment to award and will inform set-aside determination.
The Chief Joseph Dam Project, a hydroelectric facility on the Columbia River in Bridgeport, Washington, requires an accredited laboratory to analyze water samples for Oil and Grease compliance under an EPA-issued NPDES permit. The contractor must be laboratory-accredited through either the National Environmental Laboratory Accreditation Program (NELAP) or the Washington State Department of Ecology Environmental Laboratory Accreditation Program, and located within 200 road miles of Bridgeport.
The contract covers a base year (October 1, 2026 through September 30, 2027) plus four option years through September 30, 2031. The Corps anticipates submitting approximately 540 samples annually for analysis with a reporting level of 5.0 mg/L, with monthly sampling and delivery required within 10 business days of receipt in searchable PDF format with Level II QC data packages. The contractor supplies all sampling materials, pickup, and 2-day ground delivery Monday through Thursday, 6:30 a.m. to 4:30 p.m. PST, maintaining samples at 4°C.
NAICS 541380 applies (small business size standard: $16.5 million). The PSC is B533. Respondents should confirm capability, PWS/QASP compliance, small-business status, and provide SAM.gov registration details including UEI and Cage Code.
Notice text
THIS IS A SOURCES SOUGHT NOTICE.
This notice does not constitute a commitment by the government. Market research is being conducted to determine interest and capability of potential sources for this requirement. Information gathered from the market will be vital in the information and set aside status of the solicitation. Please note: All contractors doing business with the Federal government must be registered in the System for Award and Management database. This website is as follows: www.saw.gov.
The North American Industry Classification System (NAICS) Code is 541380 (Size Standard: $16.5M) and the PSC is
B533 - Special Studies/ Analysis Water Quality.
Please respond by the closing date if you can do the following:
1. Are you capable of satisfying this requirement?
2. Can your firm provide the supplies/ services in compliance with the specifications listed in the PWS/QASP?
3. Does your firm qualigy as a Small Business?
4. Is your company registered and active in the System for Award Management? If so, provide your UEI number and Cage Code.
SEE ATTACHED PWS and QASP for requirement detials. PROJECT OVERVIEW IS PROVIDED BELOW:
Overview:
The Chief Joseph Dam Project is a hydroelectric facility operated by the U.S. Army Corps of Engineers (USACE), Seattle District. The dam is located on the Columbia River at HWY 17 & Pearl Hill Rd, Bridgeport, WA 98813. The Corps has been issued a National Pollutant Discharge Elimination System (NPDES) permit from the U.S. Environmental Protection Agency (EPA) Region 10 for the Chief Joseph Dam Project. To ensure the protection of water quality and human health, this NPDES permit establishes limits on the types and amounts of pollutants that can be discharged from the Project and requires routine monitoring of discharge points. The Corps is seeking an accredited laboratory for analytical services to demonstrate compliance with the NPDES permit limits for Oil and Grease. Corps personnel will conduct all sampling and packaging, and schedule pickup of coolers for delivery of the samples to
the laboratory.
Laboratory Accreditation:
The laboratory shall be accredited in accordance with the National Environmental Laboratory Accreditation Program (NELAP) or have a current laboratory accreditation with the Washington State Department of Ecology Environmental Laboratory Accreditation Program for the analyte(s) required in the task(s). If the laboratory cannot conduct a specific analytical process, they may contract with another laboratory to perform the analysis. All contractors and subcontractors, if any, shall submit at least one of the above accreditations qualifications/certificates when submitting their quote per FAR 52.212-2 Evaluation – Commercial Items
OF IMPORTANT NOTE: The laboratory must be located within 200 road miles of Bridgeport, WA.
Work Performance Period
The base year and option years are shown below. Option years may be exercised at the Government’s discretion.
Base year: 01 October 2026 – 30 September 2027
Option year 1: 01 October 2027 – 30 September 2028
Option year 2: 01 October 2028 – 30 September 2029
Option year 3: 01 October 2029 – 30 September 2030
Option year 4: 01 October 2030 – 30 September 2031
SEE ATTACHED PWS and QASP for further specific details and criteria.
Files
| File | Type | Posted |
|---|---|---|
| A.02 PWS - CJD NPDES Water Sampling Service - 05August26.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| CHJ 480V _ SQ1_SQ3_ DSQ1_DSQ2_Rep | ENDIST Seattle | Total Small Business | |
| Waste Water Sample Testing Jacob Creek JCC Tennessee | Forest Service | No set-aside | |
| Groundwater Monitoring in Wabasha County, MN | ENDIST St Paul | Total Small Business | |
| TDA Isolated Phase Bus and Duct Inspection | ENDIST Portland | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity