Central everglades planning project (CEPP), south phase, contract 2A, S-356E pump station and S-334E spillway project, miami-dade county, florida
Closed Pre-Solicitation Posted
- Solicitation number
- W912EP24R0001
- Agency
-
ENDIST Jacksonville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KB Construction Of Canals
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Jacksonville is seeking proposals for the Central Everglades Planning Project (CEPP), South Phase, Contract 2A, S-356E Pump Station and S-334E Spillway Project in Miami-Dade County, Florida. The project includes the construction of a new levee system, pump station, and spillway structure along the L-29 Canal. Proposals will be evaluated based on technical merit, past performance, small business participation, and price, with an additional evaluation of the offeror's submission of a Project Labor Agreement. The anticipated magnitude of construction is between $100,000,000 and $250,000,000, and the period of performance is estimated at 2,548 calendar days after notice to proceed.
This is an unrestricted solicitation, and there is no set-aside designation. The Pre-solicitation Notice does not mention any potential incumbents or current contractors. Interested vendors must register as an interested vendor on the SAM.gov website to receive notifications of any changes to the solicitation, and they must be registered in the System for Award Management (SAM) to be eligible for award.
Notice text
3 versions
Update #3 · Latest ·
TITLE: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDADESCRIPTION OF WORK:As noted above, the CEPP South, Contract 2A, S-356E Pump Station and S-334E Spillway project is in western Miami-Dade County at the intersection of the L-29 Canal, the L-30 Canal, and the L-31N Borrow Canal. The structures will be constructed in the L- 29 Canal, adjacent Tamiami Trail (US-41), approximately 1/4 mile east of the existing S-334 Spillway and the temporary S-356 Pump Station. The project work includes excavation, dewatering, blasting, and construction for a new levee system, a new pump station structure, a new spillway structure, and a steel pile bulkhead wall. The overall site is approximately 20 acres, north of the site is Water Control Area 3 (WCA3). Specific major project components include the following items:1. A new levee system located along the northern side of the project site, approximately 1,600-feet long, with a crest width of 16.0 feet with 3H:1V side slopes.2. A new pump station structure has a total pumping capacity of 1,250 cubic feet per second (cfs) that consists of four (4) 250 cfs diesel motor driven pumps and two (2) 125 cfs electric motor driven pumps, superstructure, substructure, service bridge, and vehicle access ramps.3. A new spillway structure with a design capacity of 1,200 cfs with two (2) bays, vertical lift roller gate, and a service bridge.4. Both structures will have an anchored steel pile bulkhead wall located at the intake bay and discharge of the pump station5. The installation of rip rap slope protection along the canal banks and canal bottom of the L-29 canal. The estimated period of performance is 2548 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government.******Pre-proposal conference information will be provided on a later date.***PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the Government utilizing the Best Value Tradeoff Process. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price. A fourth non-price factor will be assessed by the Government: namely, the submission of a Project Labor Agreement. The anticipated magnitude of construction per DFARS 236.204 is between $100,000,000 and $250,000,000.THIS SOLICITATION IS UNRESTRICTED. This solicitation will issued on or about Thursday, 05 December 2024 with receipt of proposals on or about Thursday, 16 January 2025. Solicitation will be issued in electronic format only and will be posted on the Procurement Integrated Enterprise Environment (PIEE) website. The PIEE website can be found at https://piee.eb.mil/In order to receive notification of any amendments to the solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the sam.gov website. If you are not registered, the Government is not responsible with providing you with notification of any changes to the solicitation. You must be registered in the System for Award Management (SAM) in order to receive an award from the solicitation. The SAM website can be located at https://sam.gov.The Pre-proposal Conference information will be provided with the solicitation posting.
Update #2 ·
The purpose of this amendment is to upload Draft Plans and Specifications.TITLE: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDADESCRIPTION OF WORK:As noted above, the CEPP South, Contract 2A, S-356E Pump Station and S-334E Spillway project is in western Miami-Dade County at the intersection of the L-29 Canal, the L-30 Canal, and the L-31N Borrow Canal. The structures will be constructed in the L- 29 Canal, adjacent Tamiami Trail (US-41), approximately 1/4 mile east of the existing S-334 Spillway and the temporary S-356 Pump Station. The project work includes excavation, dewatering, blasting, and construction for a new levee system, a new pump station structure, a new spillway structure, and a steel pile bulkhead wall. The overall site is approximately 20 acres, north of the site is Water Control Area 3 (WCA3). Specific major project components include the following items:1. A new levee system located along the northern side of the project site, approximately 1,600-feet long, with a crest width of 16.0 feet with 3H:1V side slopes.2. A new pump station structure has a total pumping capacity of 1,250 cubic feet per second (cfs) that consists of four (4) 250 cfs diesel motor driven pumps and two (2) 125 cfs electric motor driven pumps, superstructure, substructure, service bridge, and vehicle access ramps.3. A new spillway structure with a design capacity of 1,200 cfs with two (2) bays, vertical lift roller gate, and a service bridge.4. Both structures will have an anchored steel pile bulkhead wall located at the intake bay and discharge of the pump station5. The installation of rip rap slope protection along the canal banks and canal bottom of the L-29 canal. The estimated period of performance is 2548 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government.******Pre-proposal conference information will be provided on a later date.***PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the Government utilizing the Best Value Tradeoff Process. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price. A fourth non-price factor will be assessed by the Government: namely, the submission of a Project Labor Agreement. The anticipated magnitude of construction per DFARS 236.204 is between $100,000,000 and $250,000,000.THIS SOLICITATION IS UNRESTRICTED. This solicitation will issued on or about Friday, 22 March 2024 with receipt of proposals on or about Monday, 06 May 2024. Solicitation will be issued in electronic format only and will be posted on the Procurement Integrated Enterprise Environment (PIEE) website. The PIEE website can be found at https://piee.eb.mil/In order to receive notification of any amendments to the solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the sam.gov website. If you are not registered, the Government is not responsible with providing you with notification of any changes to the solicitation. You must be registered in the System for Award Management (SAM) in order to receive an award from the solicitation. The SAM website can be located at https://sam.gov.The Pre-proposal Conference information will be provided with the solicitation posting.
Update #1 ·
TITLE: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDADESCRIPTION OF WORK:As noted above, the CEPP South, Contract 2A, S-356E Pump Station and S-334E Spillway project is in western Miami-Dade County at the intersection of the L-29 Canal, the L-30 Canal, and the L-31N Borrow Canal. The structures will be constructed in the L- 29 Canal, adjacent Tamiami Trail (US-41), approximately 1/4 mile east of the existing S-334 Spillway and the temporary S-356 Pump Station. The project work includes excavation, dewatering, blasting, and construction for a new levee system, a new pump station structure, a new spillway structure, and a steel pile bulkhead wall. The overall site is approximately 20 acres, north of the site is Water Control Area 3 (WCA3). Specific major project components include the following items:1. A new levee system located along the northern side of the project site, approximately 1,600-feet long, with a crest width of 16.0 feet with 3H:1V side slopes.2. A new pump station structure has a total pumping capacity of 1,250 cubic feet per second (cfs) that consists of four (4) 250 cfs diesel motor driven pumps and two (2) 125 cfs electric motor driven pumps, superstructure, substructure, service bridge, and vehicle access ramps.3. A new spillway structure with a design capacity of 1,200 cfs with two (2) bays, vertical lift roller gate, and a service bridge.4. Both structures will have an anchored steel pile bulkhead wall located at the intake bay and discharge of the pump station5. The installation of rip rap slope protection along the canal banks and canal bottom of the L-29 canal. The estimated period of performance is 2548 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government.******Pre-proposal conference information will be provided on a later date.***PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the Government utilizing the Best Value Tradeoff Process. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price. A fourth non-price factor will be assessed by the Government: namely, the submission of a Project Labor Agreement. The anticipated magnitude of construction per DFARS 236.204 is between $100,000,000 and $250,000,000.THIS SOLICITATION IS UNRESTRICTED. This solicitation will issued on or about Friday, 22 March 2024 with receipt of proposals on or about Monday, 06 May 2024. Solicitation will be issued in electronic format only and will be posted on the Procurement Integrated Enterprise Environment (PIEE) website. The PIEE website can be found at https://piee.eb.mil/In order to receive notification of any amendments to the solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the sam.gov website. If you are not registered, the Government is not responsible with providing you with notification of any changes to the solicitation. You must be registered in the System for Award Management (SAM) in order to receive an award from the solicitation. The SAM website can be located at https://sam.gov.The Pre-proposal Conference information will be provided with the solicitation posting.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Kissimmee River Restoration (KRR) Project, S-69 Weir Repair | ENDIST Jacksonville | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity