Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida-Industry Day
Closed Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912EP22Z0028
- Agency
-
ENDIST Jacksonville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KB Construction Of Canals
- Place of performance
- Miami, Florida, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Special Notice from the Department of the Army Corps of Engineers Engineering District Jacksonville announces an Industry Day for the Central Everglades Planning Project (CEPP) South Contract 1 in Miami-Dade County, Florida. The CEPP involves installing new gated flood control culverts on the L-67A levee, degrading existing spoil piles along the L-67A canal and moving the material to the construction site, and constructing earthen plugs within an existing agricultural ditch while degrading spoil piles and partially backfilling portions of the ditch.
Interested parties must contact the identified points of contact by June 21, 2022 to receive the WebEx presentation link for the June 22 Industry Day and provide their company information for attendance tracking purposes. The objective of the Industry Day is to inform contractors about the opportunity to bid on the CEPP South Contract 1 project located in a rural area of Miami-Dade County with challenging environmental and site conditions. Draft plans and specifications will be provided, and all business types may qualify provided they meet the stated deadlines and requirements.
Notice text
4 versions
Update #4 · Latest ·
Update: 6/23/2022
Purpose: Posting of the Industry Day Presentation slides, and Vendor attendence sheet on 22 June 2022. (Industry Day for Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill.)
_____________________________________________________________________________________________________
Update: 6/21/2022
Industry Day Presentation, 22 June 2022 at 1:00pm Eastern time.
Webex Meeting:
Purpose: .Industry Day for Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill
https://usace1.webex.com/meet/james.t.tracy
Webex Audio
US Toll Free: +1-844-800-2712
US Toll +1-669-234-1177
Attendee Access Code: 199 227 9920
__________________________________________________________________________________________________
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill,
Miami-Dade County, Florida
INDUSTRY DAY
DATE: Wednesday, 22 June 2022
TIME: 1:00pm Local Time
LOCATION: WebEx Presentation (a link will be posted via amendment prior to the presentation). All interested parties must contact Mr. Dewayne Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil no later than the 21st of June 2022 by 2:00pm local time. The link to access the industry day presentation will be posted via SAM.gov prior to 22 June 2022. Failure to contact Mr. Sparks & Mr. Tracy on the above dates may result in your inability to attend the Industry Day for the Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill. All interested Offerors are required to access SAM.gov for future updates.
DESCRIPTION OF PROJECT: The work will be performed in a rural area of Dade County, Florida. The entrance to the project site is on the north side of US-41 (Tamiami Trial) and approximately 12 miles west of the intersection with US-27. The Scope of Work for this project includes the following three (3) items, (A) Install the proposed L-67A levee structures; S-631, S-632, and S-633 detailed as new gated flood control culverts, with 5.5-ft. x 5.5-ft. manual vertical slide gates, two (2) sets of stop logs, each with total design capacity of 500 cubic feet per second (cfs) to convey water from WCA 3A to WCA 3B; (B) Degrade 15 existing spoil piles located along the west side of the L-67A canal and move the material onto the project construction site; and (C) Construct earthen plugs within the existing east-west agricultural ditch, degrade existing spoil piles along the north side of the ditch, and partially backfill portions of the ditch.
Location of Project
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida.
Specific Project Challenges
The work will be performed in a rural area of Dade County, Florida with limited access along a narrow existing levee embankment. The work is along the existing L-67A levee and within the surrounding Everglades Swamp lands. The lands outside the footprint of the levee are prone to flooding at all times of the year and the ground conditions are very soft and wet during all times of the year. Some of the work is located in or along existing canals which will require barges for access. The work will also require processing of on-site materials to produce embankment fill materials meeting the project specifications. It is anticipated that the work within and along the agricultural ditch will require the use of amphibious equipment and the use of hydraulic pump operations to move materials for the proposed ditch plugs.
The contractor must be able to provide as-builts of the finished work acceptable to the Government.
Environmental Conditions
The contractor is required to remain within the construction limits in order to minimize impacts to wetlands.
Plans and Specifications
Abbreviated draft plans and summary of work specifications of this project may be provided via amendment prior to the presentation.
ADDITIONAL INFORMATION REQUIRED:
Provide an email to Mr. Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil to include the information listed below:
- Company Name
- Point of Contact
- Company Address
- Phone Number
- Email Address
- Duns Number
- Cage Code
- Offeror shall identify their size classification and Small Business Size:
_ Large Business
_ Small Business
_Small Disadvantage Business
_ 8(a) Small Business
_ HUBZone
_ SDVOSB
_WOSB
Your email subject line should be addressed as “Industry Day Request – (Company Name) - Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida in order to ensure all requests are handled in a timely manner. The required information is due to Mr. Sparks & Mr. Tracy no later than 21 June 2022 at 2:00pm local time.
Update #3 ·
Update: 6/21/2022
Industry Day Presentation, 22 June 2022 at 1:00pm Eastern time.
Webex Meeting:
Purpose: .Industry Day for Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill
https://usace1.webex.com/meet/james.t.tracy
Webex Audio
US Toll Free: +1-844-800-2712
US Toll +1-669-234-1177
Attendee Access Code: 199 227 9920
__________________________________________________________________________________________________
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill,
Miami-Dade County, Florida
INDUSTRY DAY
DATE: Wednesday, 22 June 2022
TIME: 1:00pm Local Time
LOCATION: WebEx Presentation (a link will be posted via amendment prior to the presentation). All interested parties must contact Mr. Dewayne Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil no later than the 21st of June 2022 by 2:00pm local time. The link to access the industry day presentation will be posted via SAM.gov prior to 22 June 2022. Failure to contact Mr. Sparks & Mr. Tracy on the above dates may result in your inability to attend the Industry Day for the Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill. All interested Offerors are required to access SAM.gov for future updates.
DESCRIPTION OF PROJECT: The work will be performed in a rural area of Dade County, Florida. The entrance to the project site is on the north side of US-41 (Tamiami Trial) and approximately 12 miles west of the intersection with US-27. The Scope of Work for this project includes the following three (3) items, (A) Install the proposed L-67A levee structures; S-631, S-632, and S-633 detailed as new gated flood control culverts, with 5.5-ft. x 5.5-ft. manual vertical slide gates, two (2) sets of stop logs, each with total design capacity of 500 cubic feet per second (cfs) to convey water from WCA 3A to WCA 3B; (B) Degrade 15 existing spoil piles located along the west side of the L-67A canal and move the material onto the project construction site; and (C) Construct earthen plugs within the existing east-west agricultural ditch, degrade existing spoil piles along the north side of the ditch, and partially backfill portions of the ditch.
Location of Project
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida.
Specific Project Challenges
The work will be performed in a rural area of Dade County, Florida with limited access along a narrow existing levee embankment. The work is along the existing L-67A levee and within the surrounding Everglades Swamp lands. The lands outside the footprint of the levee are prone to flooding at all times of the year and the ground conditions are very soft and wet during all times of the year. Some of the work is located in or along existing canals which will require barges for access. The work will also require processing of on-site materials to produce embankment fill materials meeting the project specifications. It is anticipated that the work within and along the agricultural ditch will require the use of amphibious equipment and the use of hydraulic pump operations to move materials for the proposed ditch plugs.
The contractor must be able to provide as-builts of the finished work acceptable to the Government.
Environmental Conditions
The contractor is required to remain within the construction limits in order to minimize impacts to wetlands.
Plans and Specifications
Abbreviated draft plans and summary of work specifications of this project may be provided via amendment prior to the presentation.
ADDITIONAL INFORMATION REQUIRED:
Provide an email to Mr. Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil to include the information listed below:
- Company Name
- Point of Contact
- Company Address
- Phone Number
- Email Address
- Duns Number
- Cage Code
- Offeror shall identify their size classification and Small Business Size:
_ Large Business
_ Small Business
_Small Disadvantage Business
_ 8(a) Small Business
_ HUBZone
_ SDVOSB
_WOSB
Your email subject line should be addressed as “Industry Day Request – (Company Name) - Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida in order to ensure all requests are handled in a timely manner. The required information is due to Mr. Sparks & Mr. Tracy no later than 21 June 2022 at 2:00pm local time.
Update #2 ·
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill,
Miami-Dade County, Florida
INDUSTRY DAY
DATE: Wednesday, 22 June 2022
TIME: 1:00pm Local Time
LOCATION: WebEx Presentation (a link will be posted via amendment prior to the presentation). All interested parties must contact Mr. Dewayne Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil no later than the 21st of June 2022 by 2:00pm local time. The link to access the industry day presentation will be posted via SAM.gov prior to 22 June 2022. Failure to contact Mr. Sparks & Mr. Tracy on the above dates may result in your inability to attend the Industry Day for the Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill. All interested Offerors are required to access SAM.gov for future updates.
DESCRIPTION OF PROJECT: The work will be performed in a rural area of Dade County, Florida. The entrance to the project site is on the north side of US-41 (Tamiami Trial) and approximately 12 miles west of the intersection with US-27. The Scope of Work for this project includes the following three (3) items, (A) Install the proposed L-67A levee structures; S-631, S-632, and S-633 detailed as new gated flood control culverts, with 5.5-ft. x 5.5-ft. manual vertical slide gates, two (2) sets of stop logs, each with total design capacity of 500 cubic feet per second (cfs) to convey water from WCA 3A to WCA 3B; (B) Degrade 15 existing spoil piles located along the west side of the L-67A canal and move the material onto the project construction site; and (C) Construct earthen plugs within the existing east-west agricultural ditch, degrade existing spoil piles along the north side of the ditch, and partially backfill portions of the ditch.
Location of Project
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida.
Specific Project Challenges
The work will be performed in a rural area of Dade County, Florida with limited access along a narrow existing levee embankment. The work is along the existing L-67A levee and within the surrounding Everglades Swamp lands. The lands outside the footprint of the levee are prone to flooding at all times of the year and the ground conditions are very soft and wet during all times of the year. Some of the work is located in or along existing canals which will require barges for access. The work will also require processing of on-site materials to produce embankment fill materials meeting the project specifications. It is anticipated that the work within and along the agricultural ditch will require the use of amphibious equipment and the use of hydraulic pump operations to move materials for the proposed ditch plugs.
The contractor must be able to provide as-builts of the finished work acceptable to the Government.
Environmental Conditions
The contractor is required to remain within the construction limits in order to minimize impacts to wetlands.
Plans and Specifications
Abbreviated draft plans and summary of work specifications of this project may be provided via amendment prior to the presentation.
ADDITIONAL INFORMATION REQUIRED:
Provide an email to Mr. Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil to include the information listed below:
- Company Name
- Point of Contact
- Company Address
- Phone Number
- Email Address
- Duns Number
- Cage Code
- Offeror shall identify their size classification and Small Business Size:
_ Large Business
_ Small Business
_Small Disadvantage Business
_ 8(a) Small Business
_ HUBZone
_ SDVOSB
_WOSB
Your email subject line should be addressed as “Industry Day Request – (Company Name) - Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida in order to ensure all requests are handled in a timely manner. The required information is due to Mr. Sparks & Mr. Tracy no later than 21 June 2022 at 2:00pm local time.
Update #1 ·
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill,
Miami-Dade County, Florida
INDUSTRY DAY
DATE: Wednesday, 22 January 2022
TIME: 1:00pm Local Time
LOCATION: WebEx Presentation (a link will be posted via amendment prior to the presentation). All interested parties must contact Mr. Dewayne Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil no later than the 21st of June 2022 by 2:00pm local time. The link to access the industry day presentation will be posted via SAM.gov prior to 22 June 2022. Failure to contact Mr. Sparks & Mr. Tracy on the above dates may result in your inability to attend the Industry Day for the Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill. All interested Offerors are required to access SAM.gov for future updates.
DESCRIPTION OF PROJECT: The work will be performed in a rural area of Dade County, Florida. The entrance to the project site is on the north side of US-41 (Tamiami Trial) and approximately 12 miles west of the intersection with US-27. The Scope of Work for this project includes the following three (3) items, (A) Install the proposed L-67A levee structures; S-631, S-632, and S-633 detailed as new gated flood control culverts, with 5.5-ft. x 5.5-ft. manual vertical slide gates, two (2) sets of stop logs, each with total design capacity of 500 cubic feet per second (cfs) to convey water from WCA 3A to WCA 3B; (B) Degrade 15 existing spoil piles located along the west side of the L-67A canal and move the material onto the project construction site; and (C) Construct earthen plugs within the existing east-west agricultural ditch, degrade existing spoil piles along the north side of the ditch, and partially backfill portions of the ditch.
Location of Project
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida.
Specific Project Challenges
The work will be performed in a rural area of Dade County, Florida with limited access along a narrow existing levee embankment. The work is along the existing L-67A levee and within the surrounding Everglades Swamp lands. The lands outside the footprint of the levee are prone to flooding at all times of the year and the ground conditions are very soft and wet during all times of the year. Some of the work is located in or along existing canals which will require barges for access. The work will also require processing of on-site materials to produce embankment fill materials meeting the project specifications. It is anticipated that the work within and along the agricultural ditch will require the use of amphibious equipment and the use of hydraulic pump operations to move materials for the proposed ditch plugs.
The contractor must be able to provide as-builts of the finished work acceptable to the Government.
Environmental Conditions
The contractor is required to remain within the construction limits in order to minimize impacts to wetlands.
Plans and Specifications
Abbreviated draft plans and summary of work specifications of this project may be provided via amendment prior to the presentation.
ADDITIONAL INFORMATION REQUIRED:
Provide an email to Mr. Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil to include the information listed below:
- Company Name
- Point of Contact
- Company Address
- Phone Number
- Email Address
- Duns Number
- Cage Code
- Offeror shall identify their size classification and Small Business Size:
_ Large Business
_ Small Business
_Small Disadvantage Business
_ 8(a) Small Business
_ HUBZone
_ SDVOSB
_WOSB
Your email subject line should be addressed as “Industry Day Request – (Company Name) - Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida in order to ensure all requests are handled in a timely manner. The required information is due to Mr. Sparks & Mr. Tracy no later than 21 June 2022 at 2:00pm local time.
Files
| File | Type | Posted |
|---|---|---|
| A.02 Industry Day Vendor Roster - CNT -1.docx | DOCX document | |
| Draft Industry Day Presentation CNT-1a(r)_20220621_v6.pptx | PPTX presentation |
Notice history
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| St. Lucie South Jetty Repair Industry Day | ENDIST Jacksonville | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity