Cecil M. Harden Lake Control Tower Roof Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912QR24Q0106
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- PSC
- Z1KA Maintenance Of Dams
- Place of performance
- Rockville, Indiana 47872, United States
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The U.S. Army Corps of Engineers, Engineering District Louisville, is seeking a contractor to remove and replace the existing control tower roof at Cecil M. Harden Lake in Rockville, Indiana. The contractor will be responsible for all planning, administration, and inspection necessary to ensure the work is completed in accordance with the contract requirements and all applicable laws and regulations. This is a firm-fixed price construction contract, and the lowest priced quote will be awarded the project. The estimated construction cost is between $25,000 and $100,000. Prospective contractors must be registered in the System for Award Management and submit their proposals by August 19, 2024.
Paragraph 2:
This project is set aside 100% for small businesses under NAICS code 238160 for Roofing Contractors. The contractor must be National Roofing Contractors Association (NRCA) certified. Neither a performance bond nor a payment bond is required; only a payment bond or irrevocable letter of credit is needed. The work must be completed within 60 calendar days after receiving the notice to proceed. The place of performance is Rockville, Indiana 47872.
Notice text
2 versions
Update #2 · Latest ·
The contractor will furnish all personnel, equipment, supplies and materials necessary to remove and replace existing control tower roof at Cecil M. Harden Lake located at 3391 S Dam Rd., Rockville, Indiana 47872. The contractor’s work and responsibility will include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Contractor shall be National Roofing Contractors Association (NRCA) certified.
Estimated construction costs is betw een $25,000 and $100,000 per FAR 36.204.
One firm-fixed price construction contract will be awarded based on the lowest priced quote.
This project is set aside 100% for small business. NAICS 238160. Size Standard $19,000,000.00.
A SITE VISIT IS HIGHLY RECOMMENDED. See Special Instructions for more information.
Per FAR 52.228-13, Alternate Payment Protections, and FAR 28.102-1(b), only a Payment Bond or an Irrevocable Letter of Credit is required. A Performance Bond is not required.
All contractors must be registered in the System for Aw ard Management (www.SAM.gov) prior to award of a contract. Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Please begin the registration process immediately to avoid delay of the contract award should your firm be selected.
PLEASE NOTE: SAM is completely free of charge to registrants.
Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on “View FFP Contract Changes Playbook Here”.
**************************
Amendment 0001 was issued on 08 August 2024. Solicitation W912QR24Q0106 for Cecil M. Harden Lake is hereby amended as follows:
A) An additional site visit has been scheduled for 12 August 2024 at 11:00 AM ET.
B) The deadline for submitting all questions via ProjNet is hereby extended to 14 August 2024. The Government will answer all questions by 16 August 2024.
C) The offeror due date is hereby extended to 19 August 2024 at 02:00 PM ET.
D) All proposals must acknowledge all amendments to be an acceptable quote.
E) No other changes to the solicitation have been made with this amendment.
Update #1 ·
The contractor will furnish all personnel, equipment, supplies and materials necessary to remove and replace existing control tower roof at Cecil M. Harden Lake located at 3391 S Dam Rd., Rockville, Indiana 47872. The contractor’s work and responsibility will include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Contractor shall be National Roofing Contractors Association (NRCA) certified.
Estimated construction costs is betw een $25,000 and $100,000 per FAR 36.204.
One firm-fixed price construction contract will be awarded based on the lowest priced quote.
This project is set aside 100% for small business. NAICS 238160. Size Standard $19,000,000.00.
A SITE VISIT IS HIGHLY RECOMMENDED. See Special Instructions for more information.
Per FAR 52.228-13, Alternate Payment Protections, and FAR 28.102-1(b), only a Payment Bond or an Irrevocable Letter of Credit is required. A Performance Bond is not required.
All contractors must be registered in the System for Aw ard Management (www.SAM.gov) prior to award of a contract. Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Please begin the registration process immediately to avoid delay of the contract award should your firm be selected.
PLEASE NOTE: SAM is completely free of charge to registrants.
Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on “View FFP Contract Changes Playbook Here”.
Files
| File | Type | Posted |
|---|---|---|
| W912QR24Q0106-0001.pdf | ||
| W912QR24Q0106.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Cecil M. Harden Lake Control Tower Roof Replacement | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement | ENDIST Pittsburgh | Total Small Business | |
| GAOA Remove and Replace Roofing on Island Park Admin Site Housing Units | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity