CBRN Canteen Cap Award
Awarded Limited / Sole Source Justification Posted
- Solicitation number
- SPE1C120P0432
- Agency
- Clothing and Textiles Troop Support, Department of Defense
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- SPE1C120P0432 Federal contract award
- NAICS code
- 315990 Apparel Accessories and Other Apparel Manufacturing
- PSC
- 1195 Miscellaneous Nuclear Ordnance
- Place of performance
- Cadillac MI 49601 USA
Notice details come from SAM.gov. Updated .
Notice text
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
FOR THE Chemical Biological Radioactive Nuclear (CBRN) Canteen Cap
UNDER THE AUTHORITY OF 41 U.S.C. 1903
1. Defense Logistics Agency (DLA) Troop Support, Clothing and Textiles Supply Chain, is the
contracting activity.
2. The action being approved is the ability to solicit for DLA requirements on another than
full and open competition basis.
3. Following are the quantities and estimated price to meet requirements for the :
National Stock Number (NSN), Quantity, and Estimated Unit Price:
8465‐01‐529‐9800 33,000 each $
Estimated dollar value of the proposed award: $ each
4. The statutory authority permitting other than full and open competition for this action is
41 United States Code (U.S.C.) 1903 special emergency procurement authority as
implemented by FAR 13.5. The CBRN Canteen Cap is deemed to be available only from
the original source for this follow‐on contract for the production of this highly
specialized component and it is likely that award to any other source would result in (A)
Substantial duplication of cost to the Government that is not expected to be recovered
through competition; or (B) Unacceptable delays in fulfilling the agency’s requirements.
5. A sole‐source fixed quantity contract to Avon Protection Systems, Inc. (APS) is necessary
to procure the CBRN Canteen Cap. The Canteen Cap was developed with the M50,
M51, M53, and M53A1 masks as systems to provide protection against exposure to
CBRN agents. At the subsystem level, each of the required components such as the
CBRN Canteen Cap provide a critical function to the mask system. If a single component
does not meet the required capabilities, a mask system failure could occur and lead to
serious injury or death.
APS is the sole producer of the M50, M51, M53, and M53A1 chemical biological mask
systems and a majority of the system components, to include the CBRN Canteen Cap.
These masks provide CBRN protection and only masks produced by APS meet the
Government’s requirements. These masks are separate items from the CBRN suits and
or other equipment. The Government only has limited data rights to the contractor
drawings. APS has not shown interest in selling the full detailed Technical Data Package
(TDP) for each mask system to the Government. On 27 November 2019, the Contract
Specialist emailed APS requesting to purchase the M50, M51, M53, and M53A1 detailed
TDPs. APS replied they are not interested in selling the TDP in an email dated 16
December 2019.
2
The Government currently only has limited top level drawings, system performance
specifications, Quality Assurance Provisions (QAPs), and Special Packing Instructions
(SPl) that may be used to procure these mask systems and components; however, this
collection of documents are insufficient for competition because they lack the necessary
technical details. These missing technical details include interface dimensions, material
requirements, and component level verification requirements. Without these missing
technical details, the Government cannot guarantee the systems will function as
required by the Warfighter.
In 2000, the Government competed the M50, M51, and M53 systems for a development
contract. The Government selected the APS's prototype as having the best potential to
meet the Government's performance requirements. Extensive testing was conducted at
the system level to determine the masks’ protection capability. This testing included the
following: chemical agent testing, protection factor testing, field operational testing,
and testing of interoperability with other systems.
The Government’s effort to develop a competitive TDP for the JSGPM mask systems and
spare components would result in significant duplication of cost, approximately $, which
will not be recovered through competition by the Government. Table 2 below outlines
the cost to reverse engineer the items:
Table 1 ‐ Estimated Cost
Any effort to procure the components and systems on this contract competitively while
ensuring the parts meet critical requirements, would require either the purchase of the detailed
TDP from APS or conducting a reverse engineering effort.
Since APS is not willing to sell the rights to their TDP, reverse engineering these components
and systems would require the following steps:
Step 1 – Reverse Engineering/Design. During this stage, it is required to conduct research and
development efforts such as identify materials, design prototype molds, produce prototype
materials, perform internal conformance testing, and conduct an analysis of alternatives. Upon
reaching the appropriate technology readiness level the Government would need to invest in
production molds, verify production process repeatability, and prepare for component testing
and evaluation in accordance with the performance specifications identified in Step 1. This step
results in costs of approximately $.
Step Cost ($M)
1. Reverse Engineering/Design $
2. Government Technical Data Update $
3. Component Test and Evaluation $
4. System Test and Evaluation $
TOTAL $
3
Step 2 – Government Technical Data Update. The current Government technical data is not
adequate for a competitive procurement. Each component and system level performance
specification will need to be updated to include the appropriate performance requirements
necessary to support competitive procurement and ensure Warfighter safety. This step also
includes identifying lessons learned from previous failure mechanisms. The effort to update
Government technical data will cost approximately $.
Step 3 – Component Test and Evaluation. Upon completing research and development efforts
the Government would be required to validate the design using the previously established
product and process configuration baseline. Production representative samples of the
components would be subjected to the testing described in the component level performance
specifications such as material properties, deterioration, and mean time between failure,
reliability, environmental, battlefield contaminants, and long term storage. This effort will cost
approximately $.
Step 4 – System Test and Evaluation. After successfully meeting all of the component level
performance requirements, the Government would be required to test the design solution in
the JSGPM mask systems. These tests would be defined by the system level performance
specifications and include environmental (salt fog, transportation, drop, vibration,
electromagnetic interference etc.), protection factor, Simulant Agent Resistance Test Manikin
(SMARTMAN), and long term storage testing. Agent testing alone would cost approximately.
As described in Table 1 above, awarding a competitive contract for the components and
systems would result in the duplication of costs of approximately $ that is not expected to be
recovered through competition.
Additionally, qualifying a new source would result in unacceptable delays in fulfilling the
Government’s requirements. Table 2 below outlines the timeframe to qualify an additional
source.
Table 2 ‐ Estimated Schedule
Step 1 – Reverse Engineering/Design. The reverse engineering/design phase for components
manufactured using soft rubbers requires multiple stages, including the development of
Step Schedule (Months)
1. Reverse Engineering/Design 48 – 60
2. Government Technical Data Update 18
3. Component Test and Evaluation 18
4. System Test and Evaluation 24
TOTAL 108 – 120
4
material formulations, mold design and fabrication, and process design. Based on these factors
a single component would take approximately 12 – 18 months for a contractor with expertise in
soft rubber design and manufacture. It is reasonable to assume that not all of the components
of a mask system can be designed simultaneously. Therefore, these systems would require a
combination of sequential, iterative, and parallel design processes to realize a complete system
design. Based on the number of unique parts and multi‐system compatibility requirements, it is
estimated that this initial design phase could take approximately 36 – 48 months. Maturation of
the assembly process necessary to produce these items is estimated to take an additional 12
months; this is especially important as mask leakage points are often the result of improper
assembly of components and result in system failures. For comparison, there have been
multiple 24 – 36 months Operating and Supply Cost Reduction (OSCR) efforts to reverse
engineer components contained in these mask systems that were unsuccessful. In summary,
the total duration for reverse engineering/design is estimated to take 48 – 60 months.
Step 2 – Government Technical Data Update. Current quality assurance provisions are based
solely on Avon‐owned drawings. Assuming every component is completely reverse engineered,
it is estimated that creating detailed drawings suitable for production and updating quality
assurance requirements to appropriately test and accept the new designs, would take
approximately 18 months. An alternative approach would be for the Government to convert
the current sole source requirements into competitive, performance‐based specifications. It is
estimated that this approach would take an equivalent amount of time as previously defined
for creating detailed drawings. It is important to note that all quality assurance requirements
must ensure backward compatibility with current mask systems.
Step 3 – Component Test and Evaluation. After successful component design, each component
must be evaluated in accordance with Government requirements using certified test
equipment. A typical First Article Test (FAT) of an individual component takes approximately 6 –
12 months, assuming no design changes are necessary. Agent testing must be completed at
certified Government laboratories. It is not unusual for the wait time for agent testing to be
several months and upwards of a year due to limited capacity. Considering the number of
components associated with these systems it is reasonable to expect a minimum of 18 months
for component testing.
Step 4 – System Test and Evaluation. FAT for similar systems has taken approximately 12 – 24
months, assuming no changes to the design. To reiterate, agent testing must be completed at
certified Government laboratories with limited capacity. System agent testing uses specific test
equipment known as SMARTMAN; there are only two Government laboratories approved for
SMARTMAN testing and the lead time is typically 9 – 12 months. Similar system FATs have been
historically difficult to pass. For example, the M52 Joint Service Chemical Environment
Survivability Mask (JSCESM) took approximately 5 years to meet system FAT requirements.
5
Assuming all testing is successful, a conservative estimate to complete FAT on the Joint Service
General Purpose Mask (JSGPM) systems is expected to take at least 24 months.
As described in Table 2 above, qualifying a new vendor would result in an unacceptable delay of
108 – 120 months. The delay would be caused by lengthy testing and approval from the
services and DLA of the new item. The urgent need for this item is due to back orders building
with purchases requisitions of over 33,000 units as of January 2020. In addition, this item
should have a safety level of six (6) months of stock. Furthermore, there is no guarantee that a
new source could produce items that meet the Government's requirements.
6. There is no plan to obtain competition for this contractual action on the prime contractor
level for the reasons stated above in section 5. Notices required by FAR 5.201 shall be
published, and any proposals received shall be considered.
7. There are no plans to increase competition for the CBRN Canteen Cap due to the
aforementioned unique nature of this sole source requirement. The Government does not own
or have rights to technical data adequate for competition.
The Government previously undertook OSCR efforts to reverse engineer the various
components, and create a competitive Technical Data Package (TDP). Attempts to reverse
engineer the items were not successful due to critical features that were difficult to define.
These critical features ensure proper system interface and function. The Government
suspended further efforts to reverse engineer the components due to the high risk of
manufacturing parts that fail to meet system requirements. The criticality of the items’
dimensions, material properties, and interface requirements cannot be overstated – if a single
component on this list does not meet the required capabilities, then a mask system failure
could occur and lead to serious injury or death.
8. A Sources Sought Notice was posted on Fed Biz Opps on March 18, 2020 for the fixed
quantity of the CBRN Canteen Cap identified within this document. The posting closed April 17,
2020; APS was the only contractor to respond.
In addition the Engineering Support Activity, CCDC Chemical Biological Center along with ACCDTA
conducted market research on August 2019 in accordance with FAR 10.002(b)(2) in
relation to the M50, M51, M53, and M53A1 mask systems regarding capabilities to meet
customer requirements. The market research included contacting knowledgeable individuals in
Government, DoD database searches in Product Data Management System (PDMS)/IHS
Haystack/Joint Acquisition Chemical Biological Radiological Nuclear Knowledge Systems
(JACKS), and reviewing online product literature of similar manufacturers. Results of the market
research indicates that other sources may have the capability to produce similar items,
however, the Government does not have sufficient technical data to ensure Government
6
requirements are met. Without accurate Government owned detailed technical data, validation
and acceptance of any parts would require extensive testing and verification, causing a serious
schedule delay and duplication of costs. A competitive procurement is not possible with the
current technical data.
9. The ESA has reported that to date, no other sources have written to express an interest.
10. In accordance with FAR 5.102(a)(6) when an acquisition contains brand name
specifications, the contracting officer shall include with the solicitation the justification or
documentation required by 6.302‐1(c), 13.106‐1(b), or 13.501, redacted as necessary in
accordance with FAR 6.305.
10. In accordance with DGPA 13.003‐P (2), Special Emergency Procurement Authority (SEPA)
the Simplified Acquisition Threshold (SAT) for purchases made within the United States is
$750,000.00 to facilitate the defense against or recovery from nuclear, biological, chemical or
radiological attack. An e‐mail dated January 28, 2020 from from DLA Troop Support Policy
Office confirms this increased SAT for a CBRN item. In accordance with FAR 13.501(a)(2)(i) and
the Contract Quality Management Plan (CQMP) dated August 2019, review and approvals for
Justification & Approvals below the SAT is at the Procurement Contracting Officer level.
11. As the Contracting Officer, I hereby certify that the justification is accurate and complete to
the best of my knowledge and belief will serve as approval. I hereby determine the anticipated
cost to the Government will be fair and reasonable base on price analysis, including favorable
comparison to previous award price and published commercial price list from APS.
___4‐20‐20_______ _____________________________
Date Jennifer Scarpello
Contracting Officer
Individual Equipment
7
13.501 Special documentation requirements.
(a) Sole source (including brand name) acquisitions. (1) Acquisitions conducted under
simplified acquisition procedures are exempt from the requirements in part 6. However,
contracting officers must—
(i) Conduct sole source acquisitions, as defined in 2.101, (including brand name) under this
subpart only if the need to do so is justified in writing and approved at the levels specified in
paragraph (a)(2) of this section;
(ii) Prepare sole source (including brand name) justifications using the format at 6.303‐2,
modified to reflect that the procedures in FAR subpart 13.5 were used in accordance with 41
U.S.C. 1901 or the authority of 41 U.S.C. 1903;
(iii) Make publicly available the justifications (excluding brand name) required by 6.305(a)
within 14 days after contract award or in the case of unusual and compelling urgency within
30 days after contract award, in accordance with 6.305 procedures at paragraphs (b), (d), (e),
and (f); and
(iv) Make publicly available brand name justifications with the solicitation, in accordance with
5.102(a)(6).
(2) Justifications and approvals are required under this subpart for sole‐source (including
brand‐name) acquisitions or portions of an acquisition requiring a brand‐name. If the
justification is to cover only the portion of the acquisition which is brand‐name, then it should
so state; the approval level requirements will then only apply to that portion.
(i) For a proposed contract exceeding $150,000, but not exceeding $700,000, the contracting
officer's certification that the justification is accurate and complete to the best of the
contracting officer's knowledge and belief will serve as approval, unless a higher approval
level is established in accordance with agency procedures.
Awarded contract SPE1C120P0432 to unknown vendor for unknown amount on 2020-05-05.
Attachments
| File | Type | Posted |
|---|---|---|
| JA CBRN Canteen Cap SAMVersion.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity