Canopy Roof Replacement Phase 3
Closed Solicitation Posted
- Solicitation number
- 19BM8024Q0007
- Agency
- Department of State
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- PSC
- 5650 Roofing And Siding Materials
- Place of performance
- Yangon Yangon 20521 Burma
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Department of State seeks to replace the canopy roofs on two covered walkways at the U.S. Embassy in Rangoon, Myanmar totaling approximately 3,500 square feet. Offerors must remove existing roofing materials and install new tongue-and-groove wood decks, fascia, blocking, self-adhering underlayment, standing seam metal roofing and flashings. The evaluation will consider technical approach, past performance, and price. Proposals are due by March 20, 2024.
There is no set-aside designated for this requirement to be performed in Yangon, Myanmar. As the place of performance is overseas, the NAICS and PSC codes likely relate to general construction services. Given the scope of full roof replacement and adjustment of structural wood members, the potential award value could range from $500,000 to $1,000,000. Exact quantities are not provided, but drawings specify replacement of two canopy roofs labeled CW1 Partial and CW2.
Notice text
SUMMARY:
- The U.S. Embassy Rangoon and Overseas Buildings Operations [OBO] has a requirement for removal and replacement of the existing NEC (New Embassy Compound) covered walkway/canopy roofs and related roof components. The covered walkways consist primarily of existing single ply roofing over a tongue-and-groove wood roof deck and one-story timber canopy structures. The proposed roof replacement scope includes, but is not limited to, the following:
- Remove existing single ply roofing membrane, in-situ concrete, tongue-and-groove wood deck and related components.
- Adjust and re-tighten structural wood members to its original alignment.
- Installation of 100% new tongue-and-grove wood deck.
- Installation of 100% new wood fascia and new wood blocking to accommodate new roofing assembly.
- Replacement of 25% new wood joists and metal joist hangers.
- Installation of new self-adhering underlayment. Strip in new flashings with self- adhering underlayment.
- Installation of new slip sheet.
- Installation of new brass sheet-metal flashings/covers at joints, hips, rake edges, eaves, perimeters, and where required.
- Installation of new brass standing seam metal roof panels and related components.
- Sand all wood components and apply linseed-based wood stain.
- Final cleaning and adjusting.
- Provide all necessary materials for the successful completion of this roof replacement project of the following covered walkway/canopy roofs:
- CW1 Partial & CW2 – “Phase III” as indicated on drawings +/- 3500 sf
Total: +/- 3500 sf
Please check attachment for the details scope and T&C.
Attachments
| File | Type | Posted |
|---|---|---|
| Canopy Roof Replacement PIII (19BM8024Q0007).pdf |