Camp Buckner Revitalization
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DS24R0015
- Agency
- ENDIST New York US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- West Point, New York 10996, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Army Corps of Engineers Engineering District New York seeks construction services for the revitalization of ten buildings at Camp Buckner in West Point, New York. The scope of work involves repairing and renovating existing facilities to address structural integrity, building envelope, life safety, and health concerns. Services include modernizing fire suppression, alarm and mass notification systems; installing HVAC, broadband internet and new plumbing fixtures; fully abating hazardous materials; and repairing utility infrastructure. Proposals are due by April 15, 2024 and will be evaluated using a two-phase design-build selection process, with the top five scoring Phase One proposals invited to Phase Two. The contract will be awarded as a firm-fixed-price to the offeror providing the best overall value based on technical and price factors.
This is a 100% small business set-aside with a NAICS code of 236220, Construction of Commercial and Institutional Buildings, and size standard of $39.5 million. The estimated project value is between $10-25 million to be performed over an unspecified timeline at Camp Buckner in West Point, New York. A two-phase proposal process will be used with Phase One proposals due by April 15, 2024 and Phase Two invitations extended to the top five scoring firms from Phase One.
Notice text
Camp Buckner was constructed in various stages since its earliest beginnings during World War II in 1943 with subsequent additions and expansions from the 1950s through the 1980s. The goal of this project is to repair selected existing Camp Buckner facilities and sites to address immediate or persistent structural integrity, building envelope, life, health, and safety concerns.
Ten buildings have been selected for the third phase of this revitalization. Selective improvements will introduce new systems, such as air conditioning and vapor barriers, into the existing facilities and will reconfigure the existing facilities to eliminate the root cause of long-term deleterious effects.
Fire Suppression, Fire Alarm, and mass notification systems will all be modernized, and HVAC and broadband internet will be installed in each barracks.
All plumbing systems will be repaired/adapted as required, with all new plumbing fixtures. All hazardous materials within the buildings, including mold, mildew, lead (Pb), and asbestos, will be completely abated. Interior and Exterior Lighting will be improved. Utility service lines and infrastructure will be repaired and upgraded as necessary.
Attachments
| File | Type | Posted |
|---|---|---|
| B.08.02 RFP W912DS24R0015 Phase 1.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Camp Buckner Revitalization | Award Notice | |
| Camp Buckner Revitalization | Solicitation | |
| Camp Buckner Revitalization | Special Notice | |
| Camp Buckner Revitalization | Pre-Solicitation | |
| Camp Buckner Revitalization | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity