CA NP YOSE 500(7) Valley-Wide Continuous Flow Intersections
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF23B000003
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Mariposa, California 95338, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for a construction project to modify roadway intersections, travel lanes, signage and striping in Yosemite Valley, California to promote continuous traffic flow. The Department of Transportation Federal Highway Administration seeks to improve traffic conditions for the approximately 6,000 to 7,000 daily visitor vehicles. Work will include 1,000 linear feet of stone curb, 4,500 linear feet of concrete curb, 500 square yards of concrete sidewalk and median paving, 200 tons of asphalt, 400 square yards of asphalt sidewalk, 400 tons of roadway aggregate, and 16 miles of pavement markings. The anticipated advertisement date is February 2023 with construction from April to August 2023.
There is no set-aside designated for this procurement. The estimated total cost ranges between $2,000,000 to $5,000,000. Deliverables include 1,000 linear feet of stone curb, 4,500 linear feet of concrete curb, 500 square yards of concrete sidewalk and median paving, 200 tons of asphalt concrete pavement, 400 square yards of asphalt sidewalk, 400 tons of roadway aggregate, 16 miles of pavement markings, waterborne, and 100 sign systems. This will be solicited as a full and open competition.
Notice text
This is not a solicitation and plans and specifications are not available.
PROJECT NUMBER: CA NP YOSE 500(7)
PROJECT NAME: VALLEY-WIDE CONTINUOUS FLOW INTERSECTIONS
PROJECT DETAILS:
This project includes modifying roadway intersections, travel lanes, and signage and striping to promote free-flowing conditions for visitor vehicles on Yosemite Valley roadways. This project implements the modifications piloted in the summers of 2021 and 2022 and includes work on Northside Drive, Southside Drive, Curry Village Drive, Happy Isles Loop Road and El Capitan Drive, and modification of two existing shuttle stops to accommodate resulting changes in circulation patterns and shuttle routes. Yosemite Valley daily traffic counts can reach 6,000 to 7,000 vehicles on weekends and holidays.
All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work.
Principle work items include:
1,000 linear feet of stone curb,
4,500 linear feet of concrete curb,
500 square yards of concrete sidewalk and median paving,
200 tons of asphalt concrete pavement, type 1,
400 square yards of asphalt sidewalk,
400 tons of roadway aggregate,
16 miles of pavement markings, waterborne, and;
100 each, sign systems
SCHEDULE:
The anticipated advertisement date for the project is February 2023 with construction anticipated from April to August 2023.
ESTIMATED COST RANGE:
Total estimated cost between $2,000,000 and $5,000,000
This will be solicited as a Full & Open competition.
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA NP YOSE 500(7) Valley-Wide Continuous Flow Intxn | Award Notice | |
| CA NP YOSE 500(7) Valley-Wide Continuous Flow Intxn | Solicitation | |
| CA NP YOSE 500(7) Valley-Wide Continuous Flow Intersections | Pre-Solicitation | |
| CA NP YOSE 500(7) Valley-Wide Continuous Flow Intersections | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity