CA FTNP YOSE 15(2) Glacier Point Road
Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 6982AF21B000032
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for roadway resurfacing, restoration, and rehabilitation work along approximately 15.7 miles of Glacier Point Road within Yosemite National Park in California. The Department of Transportation Federal Highway Administration seeks to procure these services to improve the roadway and address issues like drainage and retaining walls. Evaluation will consider timely project completion while minimizing disruptions to park visitors. The anticipated solicitation advertisement date is late September 2021, with construction planned from April 2021 through October 2023.
There is no set-aside designated for this procurement. The work is estimated to cost between $25-40 million and will involve approximately 46,000 tons of asphalt, 74,000 linear feet of concrete curb, and other items like culvert replacement and riprap installation. All work must be conducted sensitively within the natural park settings. This pre-solicitation notice provides advance notice that the requirement will be competed openly and widely to qualified contractors once the solicitation is released.
Notice text
2 versions
Update #2 · Latest ·
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
CA FTNP YOSE 15(2) Glacier Point Road Project Description:
This project consists of roadway resurfacing, restoration, and rehabilitation of approximately 10.6 miles of Glacier Point Road from Badger Pass (Milepost (MP) 5.1) to the Glacier Point Parking Area (MP 15.7) and pavement preservation of approximately 5.1 miles of Glacier Point Road from Chiniquapin (MP 0.0) to Badger Pass (MP 5.1) within Yosemite National Park, in Mariposa County, California. Work also includes construction of 2 retaining walls, subgrade stabilization, rehabilitation/reconstruction of multiple parking areas including Sentinel Dome Trailhead, Washburn Point and Glacier Point, and drainage improvements, including culvert cleaning, lining and replacement. The terrain is mountainous with the elevation for the work ranging between 6,400 and 7,600 feet.
The estimated price range is between $25,000,000 and $40,000,000. The anticipated advertisement date is late September 2021 with construction anticipated from April 2021 to October 2023.
Estimated principle work items include:
46,000 tons of asphalt concrete pavement, gyratory mix,
74,000 linear feet of concrete curb,
17,000 tons of aggregate base,
18.2 miles of full depth reclamation,
17,000 square yards of asphalt paved ditch,
40 each stone masonry headwalls,
900 cubic yards of riprap,
800 linear feet of lining pipe culverts, and
1,200 linear feet of metal pipe culverts.
All of the work is occurring in natural resource sensitive areas. Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction.
This will be solicited as a full and open competition.
Update #1 ·
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
CA FTNP YOSE 15(2) Glacier Point Road Project Description:
This project consists of roadway resurfacing, restoration, and rehabilitation of approximately 10.6 miles of Glacier Point Road from Badger Pass (Milepost (MP) 5.1) to the Glacier Point Parking Area (MP 15.7) and pavement preservation of approximately 5.1 miles of Glacier Point Road from Chiniquapin (MP 0.0) to Badger Pass (MP 5.1) within Yosemite National Park, in Mariposa County, California. Work also includes construction of 2 retaining walls, subgrade stabilization, rehabilitation/reconstruction of multiple parking areas including Sentinel Dome Trailhead, Washburn Point and Glacier Point, and drainage improvements, including culvert cleaning, lining and replacement. The terrain is mountainous with the elevation for the work ranging between 6,400 and 7,600 feet.
The estimated price range is between $25,000,000 and $40,000,000. The anticipated advertisement date is late September 2021 with construction anticipated from April 2021 to October 2023.
Estimated principle work items include:
46,000 tons of asphalt concrete pavement, gyratory mix,
74,000 linear feet of concrete curb,
17,000 tons of aggregate base,
18.2 miles of full depth reclamation,
17,000 square yards of asphalt paved ditch,
40 each stone masonry headwalls,
900 cubic yards of riprap,
800 linear feet of lining pipe culverts, and
1,200 linear feet of metal pipe culverts.
All of the work is occurring in natural resource sensitive areas. Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction.
This will be solicited as a full and open competition.
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA FTNP YOSE 15(2) Glacier Point Road | Solicitation | |
| CA FTNP YOSE 15(2) Glacier Point Road | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity