CA FTFW MODO VARIOUS ROUTES Routes 010, 900, 901, 300

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF21SS0010
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
CA 96101 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks to determine interest from small businesses, including HUBZone, woman-owned, 8(a), and service-disabled veteran-owned small businesses, to set aside the forthcoming solicitation for pavement preservation, roadbed rehabilitation, and accessibility improvement work on multiple routes within the Modoc National Wildlife Refuge in California. Firms must submit statements of intention to bid as a prime contractor along with certifications, bonding information, and descriptions of relevant past projects by April 2, 2021 in order for the solicitation to be set aside.

The work includes 9,500 tons of roadway aggregate, 2.5 miles of roadbed reconditioning, 280 square yards of sidewalk construction, and 3,700 square yards of microsurfacing, to be completed between July 2021 and October 2021, with an estimated total cost between $1,000,000 to $1,400,000. The Department of Transportation Federal Highway Administration seeks this work with NAICS codes 237110, 237310, and an unspecified PSC code. No set-aside is currently designated and there is no mention of incumbents.

Notice text

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT  INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:  Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on April 2, 2020: 

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program.  In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration).  This information must be provided in order to determine eligibility – DO NOT SEND COPIES OF YOUR SAM PROFILE;

(3) Letter from bonding agent stating your firm’s capability to bond for a single project of $1.5 million, and your firm’s aggregate bonding capacity; and

(4) Provide a list of road construction projects of equal or greater value and scope to the CA FTFW MODO VARIOUS ROUTES Routes 010, 900, 901, 300 project in which you performed (as the prime contractor) include pavement preservation (patching, crack sealing, filling and micro surfacing), roadbed reconditioning, aggregate base course, accessible parking stalls, sidewalks and fencing.  State whether your firm was the prime contractor or subcontractor on the project.  DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.

The size of a small business firm includes all parents, subsidiaries, affiliates, etc.  Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.  All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/

A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs.  This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs.  A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.

PROJECT DETAILS: CA FTFW MODO VARIOUS ROUTES Routes 010, 900, 901, 300

The project is located in the Modoc National Wildlife Refuge (NWR), located in far northeastern California, just outside of the community of Alturas, CA in Modoc County. The project consists of pavement preservation work, gravel rehabilitation on multiple routes, and accessibility improvement at several locations within the refuge.   Construction improvements include pavement preservation (patching, crack sealing, filling and micro surfacing), roadbed reconditioning, aggregate base course, accessible parking stalls, sidewalks and fencing.

Significant quantities:

  • 9,500 TON            Roadway Aggregate, Method 2, Surface Course
  • 2.5 MILE              Roadway Reconditioning
  • 280 SQYD            Sidewalk, Concrete
  • 3,700 SQYD         Micro Surfacing, Type 2
  • 100 SQYD            Asphalt Concrete Pavement Patch, Type 2

The anticipated advertisement date is June 2020 with construction anticipated from July 2021 to October 2021.  Estimated total cost for the project is $1,000,000 - $1,400,000.

Notice history

Notice Type Posted
CA FTFW MODO VARIOUS ROUTES Routes 010, 900, 901, 300 Award Award Notice
CA FTFW MODO VARIOUS ROUTES Routes 010, 900, 901, 300 Latest solicitation Solicitation
CA FTFW MODO VARIOUS ROUTES Routes 010, 900, 901, 300 Pre-Solicitation
This notice Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors