CA FLAP RED 2017(3) Sacramento Island Trail
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF21SS0008
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- CA 96002 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks to procure construction services for the Sacramento Island Trail project from the Department of Transportation Federal Highway Administration. Interested contractors must submit documentation by March 30th demonstrating status as a small business, HUBZone, 8(a), woman-owned, or service-disabled veteran-owned small business along with bonding and past project experience information. Construction is anticipated to take place between December 2021 and August 2022 for a recreational trail and parking area along the Sacramento River in Redding, California involving grading, drainage, paving, signing, and landscaping.
No set-aside is currently designated for this procurement but it may be set aside for small businesses or another socioeconomic program if a qualified contractor indicates interest by the deadline. The work involves approximately 3,500 tons of roadway aggregate, 2,000 cubic yards of embankment construction, 1,200 tons of asphalt pavement, and 220 linear feet of concrete curb. The estimated contract value ranges between $800,000 and $1.5 million.
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Jorey Deml) for receipt by close of business (2 p.m. local Denver time) on March 29, 2021:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility – DO NOT SEND COPIES OF YOUR SAM PROFILE;
(3) Letter from bonding agent stating your firm’s capability to bond for a single project of $1.5 million , and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value in which you performed (as the prime contractor) roadway construction work that included construction of a parking lot, asphalt paving, roadway aggregate, embankment, trail, and concrete curb. State whether your firm was the prime contract or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
PROJECT DETAILS: CA FLAP RED 2017(3) Sacramento Island Trail
The Sacramento Island Trail Project consists of constructing a new 0.86 mile long recreational trail and parking area in the Riverland Open Space in Redding, CA. The intent of the project is to improve access to the Sacramento River and the Bureau of Land Management Parcel west of the project area for fishing, hiking, biking and other recreational activities. The trail will be a 10-foot wide paved path with 2-foot gravel shoulders. The Parking Lot will be paved, contain 20 general purpose parking stalls, 2 ADA compliant stalls, and 5 spaces for large vehicles such as buses, motorhomes, or trucks with trailers. The primary work activities will consist of grading, drainage, paving, signing, striping, and landscaping. The project is located on land owned by the City of Redding. The project is accessed from Riverland Drive, which is a County owned and maintained road that serves as a frontage road to Interstate 5.
SIGNIFICANT QUANTITIES:
Line Item Unit Est. Quantity
Roadway Aggregate TON 3,500
Embankment Construction CY 2,000
Asphalt Concrete Pavement TONS 1,200
Concrete Curb,18” LNFT 220
Anticipated Schedule
The anticipated advertisement date is April/May 2021. Construction is anticipated from December 2021 to August 2022.
Funding
The estimated cost range is between $800,000 and $1.5 million.
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA FLAP RED 2017(3) Sacramento Island Trail | Award Notice | |
| CA FLAP RED 2017(3) Sacramento Island Trail | Solicitation | |
| CA FLAP RED 2017(3) Sacramento Island Trail | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| $465M SPK small business MATOC for DBB/DB construction | ENDIST Sacramento | Total Small Business | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity