CA ERFO NP SEKI 2021-1(1) Generals Highway Wall Repairs

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF23B000022
Agency
Responses due
Not on record
Set-aside
Total Small Business

Opportunity facts

Place of performance
California, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This project includes emergency repairs to multiple sites along Generals Highway and Mineral King Road within Sequoia and Kings Canyon National Parks from wildfires in 2021. The scope of work involves reinforced shotcrete facing of eight mechanically stabilized earth walls, curb repairs at one location, and various guardrail repairs. The Federal Highway Administration will evaluate proposals based on technical approach and price to complete the repairs, with an estimated total cost range of $700,000 to $2,000,000.

This is a total small business set-aside. The principal work items involve over 2,000 square yards of reinforced shotcrete, 45 cubic yards of concrete, and replacement of various guardrail and terminal sections. Temporary traffic control will generally consist of single lane closures and coordination between multiple construction projects active in Sequoia and Kings Canyon National Parks during the anticipated construction season.

Notice text

PROJECT NUMBER:  CA ERFO NP SEKI 2021-1(1)

PROJECT NAME:  Generals Highway Wall Repairs

PROJECT DESCRIPTION:  This project includes emergency repairs to multiple sites on Generals Highway and Mineral King Road within Sequoia and King’s Canyon National Park from 2021 wildfires. The wildfires burned off wall facing, burned guardrail, caused burned trees to fall on/damage guardrail, and eroded embankment at a curb location.

SCOPE OF THE WORK:  The primary scope of work is reinforced shotcrete facing of 8 Mechanically Stabilized Earth (MSE) walls, curb repairs at one location, and various guardrail repairs. Guardrail repairs include removal of damaged rail/blocks/posts, replacement of rail/blocks/posts, and installation of new guardrail and terminals.

PRINCIPAL WORK ITEMS:

  • 56603-0000 Reinforced Shotcrete: 2,210 SQYD (includes coloring)
  • 60101-0000 Concrete: 45 CUYD (concrete footing for shotcrete facing)
  • 61702-1500 Terminal Section, Type MGS Tangent: 5 EACH
  • 63501-0000 Temporary Traffic Control: LPSM

ESTIMATED COST RANGE: 

  • Schedule A estimated total cost is $700,000 - $2,000,000.

MISCELLANEOUS:

  • Sequoia and King’s Canyon National Park will have multiple construction projects active during the anticipated construction season. Temporary traffic control coordination between projects with the park will be crucial.
  • Reinforced shotcrete wall facing is the majority of the work of this project.
  • The sites are somewhat spread out along Generals Highway. Some work is in higher elevations that receive considerable snow (primarily guardrail and curb repairs), while other sites are at lower elevations and do not have seasonal weather concerns. Timing of work among these sites related to seasonal weather should be considered.
  • The wall work is all within 2 miles of each other (between mileposts 4 and 6). Guardrail work occurs between mileposts 3 and 39. The curb repair location is between mileposts 44 and 45.
  • The curb repair location includes, but is not limited to, debris removal, existing curb removal, installation of new curb, new riprap, and asphalt paved ditch.
  • The guardrail work is primarily replacing small quantities of damaged items, such as rail, posts, and blocks. Some terminal sections need replacing. There is one stretch of guardrail to be fully replaced. Guardrail is to be fixed/replaced in-kind.
  • Temporary traffic control will generally be single lane closures.

This is total small business set-aside.

Notice history

Notice Type Posted
CA ERFO NP SEKI 2021-1(1) Generals Highway Wall Repairs Award Award Notice
CA ERFO NP SEKI 2021-1(1) Generals Highway Wall Repairs Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 Coeur d Alene, Idaho, United States · NAICS 237310 Federal Highway Administration No set-aside
WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 Forks, Washington, United States · NAICS 237310 Federal Highway Administration No set-aside
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 Port Angeles, Washington, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors