CA ERFO NP PORE 2023-1(1) Storm Repairs, Palomarin Road
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF24B000002
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Bolinas, California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks offers for embankment slope repairs and stabilization on Palomarin Road within Point Reyes National Seashore, CA due to damage from heavy storms. The Department of Transportation Federal Highway Administration requires 400 cubic yards of special rock embankment, 80 tons of roadway aggregate, and debris removal at a culvert outlet. The total small business set-aside contract has an estimated price range between $250,000 and $500,000, with advertisement scheduled for November 2023 and construction anticipated from April to May 2024.
The opportunity is designated as a total small business set-aside. Key work items include 400 cubic yards of special rock embankment, 80 tons of roadway aggregate, and debris removal at a culvert outlet. The estimated price range is $250,000 to $500,000, with advertisement in November 2023 and construction scheduled from April to May 2024. Work will occur in environmentally sensitive areas and is subject to constraints that may impact construction schedules and operations.
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
This project includes embankment slope repairs and stabilization on Palomarin Road adjacent to the culvert crossing at Arroyo Hondo Creek within Point Reyes National Seashore, CA. The embankment slope failure occurred as a result of the heavy Atmospheric River storm and extreme runoff in December 2022 and January 2023.
The estimated price range is between $250,000 and $500,000. The anticipated advertisement date for the project is November 2023 with construction anticipated from April to May 2024.
Work is occurring in natural resource sensitive areas and there are environmental constraints that may affect the construction schedule and type of operations.
Principle work items include:
400 cubic yards of special rock embankment,
80 tons of roadway aggregate, method 2, and;
Debris removal at culvert outlet
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA ERFO NP PORE 2023-1(1) Storm Repairs, Palomarin Road | Award Notice | |
| CA ERFO NP PORE 2023-1(1) Storm Repairs, Palomarin Road | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| FY26 Clouter Creek Middle and Highway Cell Diking | ENDIST Charleston | Total Small Business | |
| CA-humboldt BAY NWR-tide gate repair | — | Total Small Business | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity