CA erfo klamath NF 18N31(1) upper west branch bridge

Special Notice Posted

Solicitation number
6982AF-22-SN-0002
Agency
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
California, United States

Notice details come from SAM.gov. Updated .

Notice text

THIS IS A SPECIAL NOTICE FOR SITE ACCESS (VISIT) TO THE PROJECT LOCATION- PLANS AND SPECIFICATIONS ARE NOT AVAILABLE

SITE ACCESS DATES:  November 1 through November 4, 2021 ONLY

VISIT: https://www.google.com/maps/41.930471,-123.4783758

or https://earth.google.com/web/@41.93119042,-123.47876412

Objective:  To provide interested bidders with project information and access to the project site prior to the winter weather conditions.

Questions and Answers:  No questions will be answered during the site-visits.   All questions arising from the contractor site-visits must be submitted in writing TO: CFLContracts@dot.gov and will be answered on the SAM.GOV website.  

Please note the project is still under development, so many questions will not be answered during this time and should be deferred until the formal solicitation phase of the project. PRELIMINARY drawings are provided for informational purposes only.  These are NOT the final plans.

Project Description: This project is located approximately 5 miles south of the Oregon border in Siskiyou County, California. Upper West Branch Creek Bridge is located approximately 12.5 miles Northwest of Happy Camp on Forest Route 18N31 and approximately 1/3 miles off Grayback Road.  Coordinates for the bridge are 41°55'49.7"N, 123°28'41.7"W

This project involves replacement of the Upper West Branch Creek Bridge which was damaged by fire in 2020 and will be replaced with a proposed concrete bridge.  As a green initiative and innovation, the concrete mix design will include the use of wood cellulose nano-fibers or crystals (CNF or CNC). The proposed bridge crossing is at the same location as the existing bridge.  Concrete abutments and a steel truss superstructure remain post-fire at the project site.  The existing superstructure will be removed and disposed of as part of the FHWA contract. However, all or portions of the existing concrete abutments will remain.  An asphalt overlay, bridge rail and guardrail are proposed on the bridge and bridge approaches.

Significant items and quantities:  Project will include, but is not limited to bridge construction, embankment construction, aggregate base, asphalt paving, survey, erosion control, permanent and temporary traffic control, and revegetation.  Major quantities include:

  • 1,000 +/- cuyd of earthwork
  • 1 lpsm of removal of structures and obstructions (includes existing bridge elements)
  • 1 lpsm of concrete bridge (includes foundations)
  • 500 +/- tons of aggregate base course
  • 300 +/- tons of asphalt concrete pavement
  • 300 +/- linear ft of guardrail

Anticipated Construction Amount: $1.0-4.0M

Construction Season:  Cold weather and snow are likely during late fall, winter, and early spring months. It is anticipated that on-site construction for this project is from May to November of 2022 and will only take one season.

Anticipated Permits:

  • California Construction General Permit for compliance with Section 402 of the Clean Water Act
  • Clean Water Act Section 404 and 401

Temporary Traffic Control: Forest Route 18N31 will remain closed during construction.

Anticipated Advertisement Date:  March 2022

Anticipated Award Date: April 2022

Other:

  • Construction access to both sides of the bridge is available by detour.
  • No stream crossings or fords will be allowed.
  • The adjacent sections of closed roadway may be used for staging and storage.

Please coordinate with the Klamath National Forest with any access issues during the preshow dates.  Contact information is below:  REFER PROJECT QUESTIONS THROUGH CFLContracts@dot.gov ONLY, Mr. Kellogg will not answer project questions.

Ken Kellogg, PE 

Forest Engineer, Klamath National Forest

p: 530-841-4535 / c: 530-433-3409

kenneth.kellogg@usda.gov

1711 South Main Street

Yreka, CA 96097

Files

File Type Posted
CA ERFO KLAMATH NF Upper West Branch Bridge_Plans.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors