C-17 PSE - Fuel Draining Kits

Closed Solicitation Posted

Solicitation number
FA852622Q0009
Agency
AFLCMC Robins AFB Lifecycle Management Center, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
333914 Measuring, Dispensing, and Other Pumping Equipment Manufacturing
PSC
4930 Lubrication And Fuel Dispensing Equipment

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

** The proposal due date for this requirement is extended to 6 May 2022 in accordance with Amendment 0001 ** 

This requirement is for a firm-fixed price contract for three (3) each NSN: 4930-01-618-2161BA, Fuel Draining Kits, P/N 17G460235-1, which includes one First Article and two production assets, one First Article Test Plan, one Marking Plan, and one First Article Test Report, plus three (3) Options for additional line item quantities of three (3) each. During performance of unscheduled maintenance, a ground refuel isolation valve may require repair or replacement. Prior to removing the valve, the fuel must be drained from the fuel tank. A means is required at the organization and depot levels of maintenance to interface between the fuel feed manifold and the fuel drain unit hose. Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFQ. All responsible small business sources may submit a proposal to be considered by the contracting agency. The Government will utilize the Past Performance Information Retrieval System (PPIRS), Excluded Parties List System (EPLS), and other Government databases to determine contractor status before evaluating proposals. Proposals will be evaluated based on the criteria stated in the RFQ. All data for this weapon system is considered EXPORT CONTROLLED. 

Update #1 ·

This requirement is for a firm-fixed price contract for three (3) each NSN: 4930-01-618-2161BA, Fuel Draining Kits, P/N 17G460235-1, which includes one First Article and two production assets, one First Article Test Plan, one Marking Plan, and one First Article Test Report, plus three (3) Options for additional line item quantities of three (3) each. During performance of unscheduled maintenance, a ground refuel isolation valve may require repair or replacement. Prior to removing the valve, the fuel must be drained from the fuel tank. A means is required at the organization and depot levels of maintenance to interface between the fuel feed manifold and the fuel drain unit hose. Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFQ. All responsible small business sources may submit a proposal to be considered by the contracting agency. The Government will utilize the Past Performance Information Retrieval System (PPIRS), Excluded Parties List System (EPLS), and other Government databases to determine contractor status before evaluating proposals. Proposals will be evaluated based on the criteria stated in the RFQ. All data for this weapon system is considered EXPORT CONTROLLED. 

Attachments

Files attached to this notice, newest first
File Type Posted
FA8526-22-Q-0009-0001 - 28Apr22.pdf PDF
CDRL_A003_IUID_Marking_Plan_17G460235-1.pdf PDF
FA8526-22-Q-0009 - 28Mar22.pdf PDF
Mandatory_Shipping_Docs.docx DOCX document
CDRL_A001_A002_Test_Inspection_17G460235-1.pdf PDF
Form_158.pdf PDF
DD1653_30387.pdf PDF
PSE_Solicitation_Template-RevB.xlsx XLSX spreadsheet
DD1653_30396.pdf PDF
Use_and_Non-Disclosure_Agreement.docx DOCX document
EDL.pdf PDF
DD1653_30220.pdf PDF
Show all 12

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity