Building Demolition, Natural Resource Management Section Building, Pleasant Valley, IA.
Award Notice Posted
- Solicitation number
- W912EK10T0145
- Agency
-
ENDIST Rock Island
US Army Corps of Engineers, Department of Defense
- Awarded
- to Phoenix Corp Of The Quad Cities
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912EK-10-P-0362 Federal contract award
- NAICS code
- 238910 Site Preparation Contractors
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
The work shall include, but is not limited to the demolition of the parks building and surrounding area cleanup. The building shall be excavated one foot below the buildings footings. The material must be hauled to the landfill and disposal records of the material shall be accounted for with written documentation. The land where the park building has been removed shall be returned to its original elevation and backfilled with material that is not subject to deterioration. The soil shall be compacted in one foot lifts and the final six inches shall be compacted CA-6 gravel.
Update #2 ·
The work shall include, but is not limited to the demolition of the parks building and surrounding area cleanup. The building shall be excavated one foot below the buildings footings. The material must be hauled to the landfill and disposal records of the material shall be accounted for with written documentation. The land where the park building has been removed shall be returned to its original elevation and backfilled with material that is not subject to deterioration. The soil shall be compacted in one foot lifts and the final six inches shall be compacted CA-6 gravel.
Update #1 ·
The work shall include, but is not limited to the demolition of the parks building and surrounding area cleanup. The building shall be excavated one foot below the buildings footings. The material must be hauled to the landfill and disposal records of the material shall be accounted for with written documentation. The land where the park building has been removed shall be returned to its original elevation and backfilled with material that is not subject to deterioration. The soil shall be compacted in one foot lifts and the final six inches shall be compacted CA-6 gravel.
On GovTribe