Building 66041 Repair Lab 103B and Dome, KAFB

Award Notice Posted

Solicitation number
W912PP22Q0007
Agency
Awarded
to Altima Construction Inc.
Set-aside
8(a) Sole Source

Opportunity facts

Contract number
W912PP22P0006 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z1AA Maintenance Of Office Buildings
Place of performance
Kirtland AFB, New Mexico, United States

Notice details come from SAM.gov. Updated .

Notice text

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 66041 Repair Lab 103B and Dome 102.  The work shall include the following requirements listed in the specific requirements.  The contractor shall assure the attached waste summary checklist and DD Form 1354 are completed within three (3) working days of “place in service date” and submitted to USACE and Kirtland AFB Real Property office to get it staffed to the BCE for signature, at the conclusion of the project.  

 

2. SPECIFIC REQUIREMENTS:

 

  1. Demolition
    1. Contractor must remove abandoned conduit and j-boxes, as indicated on the Not For Construction drawings.
    2. Contractor must remove abandoned A/C unit, as indicated on the Not For Construction drawings.
    3. Contractor must remove existing insulation, as indicated on the Not For Construction drawings.
    4. Contractor must remove existing door hardware, as indicated on the Not For Construction drawings.
    5. Contractor must remove existing motion sensor and ceiling tile, as indicated on the Not For Construction drawings.
    6. Contractor must remove existing badge reader, as indicated on the Not For Construction drawings.
       
  2. Construction
    1. Contractor must repair, float, texture and paint existing wall, as indicated on the Not For Construction drawings.
    2. Contractor must provide and install new door hardware, as indicated on the Not For Construction drawings.
    3. Contractor must provide and install new gyp. bd., as indicated on the Not For Construction drawings.
    4. Contractor must provide and install new man bars, viewport and dielectric break on existing duct work, as indicated on the Not For Construction drawings.
    5. Contractor must seal all penetrations and ground existing conduit, as indicated on the Not For Construction drawings.
    6. Contractor must secure existing hatches, as indicated on the Not For Construction drawings.
    7. Contractor must replace existing gutter, as indicated on the Not For Construction drawings.
    8. Contractor must provide and install new insulation, as indicated on the Not For Construction drawings.
    9. Contractor must patch existing wall, as indicated on the Not For Construction drawings.
       

Awarded contract W912PP22P0006 to ALTIMA CONSTRUCTION INC. for 201664.23 on 2022-02-01.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors