Building 570 Library Power & Data, Kirtland Air Force Base, Bernalillo County, New Mexico
Award Notice Posted
- Solicitation number
- W912PP25QA040
- Agency
-
ENDIST Albuquerque
US Army Corps of Engineers, Department of Defense
- Awarded
- to Evergreen Contractors LLC
- Set-aside
- 8(a) Sole Source
Opportunity facts
- Contract number
- W912PP25PA028 Federal contract award
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- Z1AA Maintenance Of Office Buildings
- Place of performance
- Kirtland AFB, New Mexico 87117, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Albuquerque awarded contract W912PP25PA028 worth $44,754.31 to Evergreen Contractors LLC on September 12, 2025, for power and data infrastructure work at Building 570 Library on Kirtland Air Force Base in New Mexico. The contract, awarded as an 8(a) sole source set-aside, requires the contractor to demolish existing electrical connections and install new power and data systems to support six new workstations, including hardwiring power circuits, installing phone and data cables with CAT 6 cabling in three different colors (green for LAN and phone, purple for DREN), and relocating fire safety equipment. The work involves coordination with UNICOR for workstation installation and includes requirements to complete waste summary documentation within three working days of the project's completion. Additional tasks include removing an existing ceiling projector and installing government-provided ceiling tiles at that location.
Notice text
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.
The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 570 Library Power and Data. The work shall include the following requirements listed in the specific requirements. The contractor shall assure the attached waste summary checklist and DD Form 1354 are completed within three (3) working days of “place in service date” and submitted to USACE and Kirtland AFB Real Property office to get it staffed to the BCE for signature, at the conclusion of the project.
a. Demolition
1. Contractor must prep power and data connections for new workstations.
2. Contractor must remove existing projector from B570 Library ceiling. Existing ceiling mount power outlet to remain.
b. Construction
1. Contractor will be required to coordinate with UNICOR as they will provide and install six (6) new workstations in B570 Library at south wall.
2. Contractor must hardwire one common ground circuit of UNICOR supplied power infeed to existing wall power outlet.
3. Contractor must provide & install all phone & data cable & data ports in workstations through cubicle panel raceways in B570 Library. Populate each data port with one (1) LAN, CAT 6 cable color green, one (1) DREN, CAT 6 cable color purple, and one (1) Phone, CAT 6 Cable color green.
4. Contractor must remove & salvage existing Horn & Strobe on B570 Library south wall and re-install above new workstation wall height, ensuring visibility from outside workstation.
5. Contractor must install Gov’t provided ceiling tile at removed projector location in B570 Library.
Awarded contract W912PP25PA028 to EVERGREEN CONTRACTORS LLC for 44754.31 on 2025-09-12.