Building 51 Painting and Flooring Replacement
Closed Solicitation Posted
- Solicitation number
- 1333ND26RNB190008
- Agency
-
National Institute of Standards and Technology
Department of Commerce
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Boulder, Colorado 80305, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The National Institute of Standards and Technology (NIST) is soliciting proposals for interior painting and flooring replacement services in Building 51 at its Boulder, Colorado campus. The scope of work includes removal and replacement of approximately 1,500 square feet of carpet tile, vinyl composition tile (VCT) flooring, cove base, and transition strips, as well as preparation and painting of interior walls and door frames. The contractor must provide all labor, materials, equipment, and supervision necessary for project completion while adhering to federal construction standards, including Davis-Bacon Act wage requirements, OSHA safety standards, and Buy American construction materials requirements. Work must be performed on an active, secure federal campus with coordination of night and weekend work to minimize operational disruption, and a pre-proposal site visit was conducted on April 16, 2026. Critical deadlines include questions due by April 20, 2026, with the revised proposal due date of May 4, 2026, at 5:00 PM Mountain Time. The evaluation criteria and weighting methodology for proposal selection are detailed in the full solicitation package.
This solicitation is designated as a Total Small Business set-aside under NAICS code 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45.0 million. No incumbent contractor information is provided in the available solicitation documents, and the specific award value or budget range is not disclosed in the public notices. The anticipated period of performance is 120 days from the Notice to Proceed, with work performed at Building 51 on the NIST Boulder campus in Boulder, Colorado 80305. Contractors must submit a final project schedule, site-specific safety plan, and material specification approvals within 14 days of contract award, with the site-specific safety plan requiring acceptance before work commencement. Performance bonding is required per FAR 52.228-13, and proposals must be submitted to lauren.topez@nist.gov in accordance with all solicitation requirements outlined in the formal solicitation documents and three amendments issued between April 1 and April 30, 2026.
Notice text
3 versions
Update #3 · Latest ·
The National Institute of Standards and Technology (NIST), Boulder, CO, is seeking a qualified contractor to perform interior painting and flooring replacement in Building 51. The project includes removal and replacement of approximately 1,500 square feet of carpet tile, VCT flooring, cove base, and transition strips, as well as preparation and painting of interior walls and door frames. Work will be performed on an active, secure federal campus and will require coordination with NIST personnel, adherence to safety and security requirements, and accommodation of night and weekend work to minimize operational disruption.
The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the project in accordance with the Statement of Work. The period of performance is anticipated to be 120 days from Notice to Proceed.
Key Dates:
- List of Individuals for Site Visit Due: Tuesday, April 14, 2026
- Site Visit: Thursday, April 16, 2026
- Questions Due: Monday, April 20, 2026
- Proposals Due: Monday, May 4, 2026
A pre-proposal site visit is recommended. Additional details, requirements, and submission instructions are provided in the full solicitation package.
04.01.26 - Please see Amendment 0001 for further details regarding the pre-proposal site visit.
04.27.26 - Please see Amendment 0002 for Q&A. Proposal due date revised from 4/29/26 to 5/4/26.
Update #2 ·
The National Institute of Standards and Technology (NIST), Boulder, CO, is seeking a qualified contractor to perform interior painting and flooring replacement in Building 51. The project includes removal and replacement of approximately 1,500 square feet of carpet tile, VCT flooring, cove base, and transition strips, as well as preparation and painting of interior walls and door frames. Work will be performed on an active, secure federal campus and will require coordination with NIST personnel, adherence to safety and security requirements, and accommodation of night and weekend work to minimize operational disruption.
The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the project in accordance with the Statement of Work. The period of performance is anticipated to be 120 days from Notice to Proceed.
Key Dates:
- List of Individuals for Site Visit Due: Tuesday, April 14, 2026
- Site Visit: Thursday, April 16, 2026
- Questions Due: Monday, April 20, 2026
- Proposals Due: Wednesday, April 29, 2026
A pre-proposal site visit is recommended. Additional details, requirements, and submission instructions are provided in the full solicitation package.
04.01.26 - Please see Amendment 0001 for further details regarding the pre-proposal site visit.
Update #1 ·
The National Institute of Standards and Technology (NIST), Boulder, CO, is seeking a qualified contractor to perform interior painting and flooring replacement in Building 51. The project includes removal and replacement of approximately 1,500 square feet of carpet tile, VCT flooring, cove base, and transition strips, as well as preparation and painting of interior walls and door frames. Work will be performed on an active, secure federal campus and will require coordination with NIST personnel, adherence to safety and security requirements, and accommodation of night and weekend work to minimize operational disruption.
The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the project in accordance with the Statement of Work. The period of performance is anticipated to be 120 days from Notice to Proceed.
Key Dates:
- List of Individuals for Site Visit Due: Tuesday, April 14, 2026
- Site Visit: Thursday, April 16, 2026
- Questions Due: Monday, April 20, 2026
- Proposals Due: Wednesday, April 29, 2026
A pre-proposal site visit is recommended. Additional details, requirements, and submission instructions are provided in the full solicitation package.
Files
| File | Type | Posted |
|---|---|---|
| 1333ND26RNB1900080003.pdf | ||
| 1333ND26RNB1900080002.pdf | ||
| 1333ND26RNB1900080001.pdf | ||
| 1333ND26RNB190008.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Building 51 Painting and Flooring Replacement | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Administrative Parking Lot Repairs | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity