BUILDING 497 REPAIR RDF NW SUITE AND BREAKROOM at KIRTLAND AFB

Award Notice Posted

Solicitation number
W912PP-17-T-0040
Agency
Awarded
to QA Engineering LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W912PP-17-P-0026 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to
complete the work for Building 497 Repair RDF NW Suite and Breakroom.Demolition
1. Contractor shall remove existing flooring and wall base and prep for new
floorings as indicated on drawings.
2. Contractor shall remove exiting chair rail as indicated on drawings.
3. Contractor shall sand and prep existing window frames for new paint as
indicated on drawings.
4. Contractor shall remove exiting ceiling grid, tiles, lights and HVAC diffusers
as indicated on drawings.
5. Contractor shall remove exiting light switches as indicated on drawings.
6. Contractor shall remove exiting thermostat as indicated on drawings.
7. Contractor shall remove existing lights and salvage for relocation as indicated
on drawings.
b. Construction
1. Contractor shall provide and install new comm. rack and patch panel as
indicated on drawings.
2. Contractor shall provide and install new metal stud wall as indicated on
drawings.
3. Contractor shall provide and install new carpet tiles as indicated on drawings.
4. Contractor shall provide and install new Comm., LAN, and DREN as
indicated on drawings.
5. Contractor shall provide and install new duplex receptacles as indicated on
drawings.
6. Contractor shall provide and install new rubber wall base as indicated on
drawings.
7. Contractor shall paint new and existing walls as indicated on drawings.
8. Contractor shall patch existing walls as indicated on drawings.
9. Contractor shall provide and install new doors, frames and hardware as
indicated on drawings.
10. Contractor shall provide and install new room signs as indicated on drawings.
W912PP-17-P-0026
Page 5 of 51
11. Contractor shall provide and install new floor transition strips as indicated on
drawings.
12. Contractor shall provide and install new 4" aluminum store front systems as
indicated on drawings.
13. Contractor shall provide and install new power as indicated on drawings.
14. Contractor shall provide and install new plastic laminate upper and lower
cabinets as indicated on drawings.
15. Contractor shall provide and install new solid surface countertops with
integral backsplash as indicated on drawings.
16. Contractor shall provide and install new integral bowl sink and tie existing
plumbing and exhaust lines into existing as indicated on drawings.
17. Contractor shall install existing lights as indicated on drawings.
18. Contractor shall provide and install new ceiling plenum return air grill as
indicated on drawings.
19. Contractor shall provide and install new HVAC supply diffuser as indicated
on drawings.
20. Contractor shall provide and install new light switch as indicated on
drawings.
21. Contractor shall provide and install new 2'x2' ceiling grid and tiles as
indicated on drawings.
22. Contractor shall provide and install new bulk head above upper cabinets as
indicated on drawings.
23. Contractor shall install existing lighting as indicated on drawings.
24. Contractor shall provide and install existing thermostat as indicated on
drawings.