About this opportunity

The Department of the Army Corps of Engineers Engineering District Albuquerque awarded contract W912PP26PA027 to Colt Builders Inc. for $145,121 on September 10, 2026, for Building 463 Breakroom Renovation and Entry Repair at Kirtland AFB.

The award was made as an 8(a) sole-source set-aside. Scope includes demolition of existing flooring, casework, countertops, plumbing fixtures, concrete pads, and sidewalks; installation of new flooring, casework, solid surface countertops, plumbing fixtures, microwave, and refrigerators in Building 463 and a refrigerator in Building 442; new water line for refrigerator service; concrete pad and sidewalk replacement with steel mesh reinforcement; new sprinkler system with bubblers, piping, valve, and timer for courtyard irrigation; and reinstallation of salvaged picnic tables. Place of performance is Kirtland AFB.

Notice text

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 463 Breakroom Renovation and Entry Repair

  1. Demolition
    1. Contractor must remove existing flooring and rubber wall base.
    2. Contractor must remove existing casework and countertop.
    3. Contractor must remove existing plumbing fixtures and refrigerator.
    4. Contractor must remove existing picnic tables and salvage for reinstallation.
    5. Contractor must remove existing cracked and buckled concrete pads and sidewalks.
  1. Construction
    1. Contractor must provide and install new flooring and rubber wall base.
    2. Contractor must provide and install new plastic laminate casework.
    3. Contractor must provide and install new solid surface countertops.
    4. Contractor must provide and install new plumbing fixtures.
    5. Contractor must provide and install new microwave.
    6. Contractor must provide and install new refrigerator.
    7. Contractor must provide and install new refrigerator in Building 442 kitchen.
    8. Contractor must provide and install new water line for refrigerator.
    9. Contractor must provide and install new sprinkler system with bubblers, piping, sprinkler valve and timer to provide irrigation to four courtyard trees.
    10. Contractor must compact and prepare sub grade for new concrete pads and sidewalk.  Trim and cut back existing roots as needed.
    11. Contractor must provide and install new concrete pads and sidewalks.  Provide steel mesh concrete reinforcement and control joints.
    12. Contractor must reinstall picnic tables.

Awarded contract W912PP26PA027 to COLT BUILDERS INC for 145121.00 on 2026-09-10.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Request for information/sources sought NAICS 236220 ENDIST Albuquerque No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors