Building 37000 Plant 1 Repair Restrooms
Award Notice Posted
- Solicitation number
- W912PP26QA029
- Agency
-
ENDIST Albuquerque
US Army Corps of Engineers, Department of Defense
- Awarded
- Set-aside
- 8(a) Sole Source
Opportunity facts
- Contract number
- W912PP26PA033
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Kirtland AFB, New Mexico 87117, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Albuquerque awarded an 8(a) sole source contract on September 18, 2026, for Building 37000 Plant 1 restroom repair and renovation.
The scope includes removal and disposal of existing flooring, fixtures, kitchenette, and a partition wall; salvage of three existing doors; capping of existing plumbing lines; installation of four water closets, four lavatories with faucets, and two urinals with screens; two toilet partitions (one meeting ANSI 117.1 accessibility requirements); new partition walls using 3-5/8" metal studs and gypsum board with acoustic batt insulation (6" metal studs where required for plumbing or fixture hangers); new and salvaged doors; new epoxy flooring with slab preparation per manufacturer specifications; new GFCI receptacles; new mop sink; paint application on indicated walls; and installation of government-provided trash cans, toilet paper, soap and paper towel dispensers. Preservation of existing wall tiles and ceiling grid/lighting is required. Abatement status was not specified at award.
Notice text
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.
The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 37000 Plant 1 Repair Restrooms.
- Contractor must remove and dispose of existing flooring. (Abatement TBD) Clean, degrease, and prep slab to received new epoxy flooring.
- Contractor must remove and dispose of existing fixtures. Preserve existing wall tiles and ceiling grid/lighting.
- Contractor must demolish existing partition wall. Salvage all three (3) existing doors in room P2.
- Contractor must remove and dispose of existing kitchenette. Existing plumbing lines must be capped.
- Construction
- Contractor must provide and install four (4) new water closets (WC-1) and associated plumbing.
- Contractor must provide and install four (4) new lavatories (SINK-1) and faucets (FC-1) and associated plumbing.
- Contractor must provide and install two (2) new urinals and associated plumbing. Provide and install new urinal screen (US-1) at each urinal.
- Contractor must provide and install two (2) new toilet partitions (TPART). One to be installed to meet requirements of ANSI 117.1
- Contractor must provide and install new partition walls utilizing 3-5/8” metal studs and gypsum wall board. Fill with acoustic batt insulation. Where required to facilitate plumbing utilities or fixture hangers, 6” metal studs may be used.
- Contractor must provide and install new doors and re-install salvaged doors. New doors to match characteristics of existing door.
- Contractor must provide and install new epoxy flooring (EP-1). Slab must be prepared to receive finish per manufacturer instructions.
- Contractor must install government provided trash cans, toilet paper, soap and paper towel dispensers.
- Contractor must provide and apply paint (PT-1) on indicated walls.
- Contractor must provide and install new GFCI receptacles.
- Contractor must provide and install new mop sink (SINK-2), mop sink faucet (FC-2) and associated plumbing. Provide and install mop hooks.
-
- Contractor must provide and install new mirrors.
- Contractor must provide and install new ADA grab bars.
- Contractor must provide and install new restroom signage for each restroom per KAFB standards.
- Existing ceiling to remain. Contractor must reconfigure lighting and HVAC to accommodate new space layout. Provide and install new lighting switches as required. Rebalance HVAC.
- Contractor must provide and install new grid mounted light fixture.
- Contractor must provide and install new exhaust fans, tie into existing building exhaust system.
Awarded contract W912PP26PA033 to EVERGREEN CONTRACTORS LLC for 188955.16 on 2026-09-18.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Gila National Forest Vault Toilet Decommissioning | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity