Building 277 Repair SW Corridor at Kirtland AFB, NM

Award Notice Posted

Solicitation number
W912PP-15-T-0125
Agency
Awarded
to Alms, LIMITED Company
Set-aside
No set-aside

Opportunity facts

Contract number
W912PP-15-P-0127 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award.

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 277 Repair SW Corridor SPECIFIC
REQUIREMENTS:
a.Demolition
1.Contractor shall remove existing light switch as indicated on drawings.
2.Contractor shall remove existing heat detector and salvage for relocation as indicated on drawings.
3.Contractor shall remove existing speaker and salvage for relocation as indicated on drawings.
4.Contractor shall remove existing lights, ceiling tiles and grid as indicated on drawings.
5.Contractor shall remove existing red strobe light and salvage for relocation as indicated on drawings.
6.Contractor shall remove existing camera and salvage for relocation as indicated on drawings.
b.Construction
1.Contractor shall provide and install new gyp. bd. as indicated on drawings.
2.Contractor shall provide and install new wall as indicated on drawings.
3.Contractor shall sound seal around all penetrations in ceiling as indicated on drawings.
4.Contractor shall provide and install new gyp. bd. on existing studs as indicated on drawings.
5.Contractor shall provide and install new light switch as indicated on drawings.
6.Contractor shall provide and install new led lighting as indicated on drawings.
7.Contractor shall provide and install new hard lid ceiling as indicated on drawings.
8.Contractor shall provide and install new BMS alarm system as indicated on drawings.
9.Contractor shall provide and install new access panel as indicated on drawings.
10.Contractor shall provide and install new rough-ins as indicated on drawings.
11.Contractor shall provide and install new chain link fence as indicated on drawings.
c.Option 1
1.Contractor shall demo remove existing concrete and prep to receive new concrete as indicated on drawings.
2.Contactor shall provide and install new concrete sidewalk as indicated on drawings.
3.Contractor shall provide drainage under new concrete sidewalk as indicated on drawings.
3.REQUIRED SUBMITTALS:
a.Submittals required for all items listed below:
i.Lighting
ii.Access Panel with Pull Down Ladder
iii.As-Builts
iv.Accident Prevention Plan
v.O&M Manuals
vi.Waste Summary Checklist if applicable