Buckhorn Boat Ramp Reconstruction

Closed Pre-Solicitation Posted

Not the latest version. See the latest pre-solicitation from .

Solicitation number
W912QR24QBLBR
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
PSC
Not on record
Place of performance
Buckhorn, Kentucky, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers is seeking proposals for the renovation of the existing boat ramp, removal of an outcropping, improved drainage, and construction of a work platform at Buckhorn Lake in Kentucky. The project involves reconstructing the boat ramp to near winter pool and tying it into the existing ramp below winter pool, as well as creating a large, flat work platform near the ramp turnaround area. The government is conducting a market survey to determine if there are a reasonable number of interested small business concerns to set aside the future project. The estimated project cost range is $1,000,000 to $5,000,000, and the project duration is estimated at 365 calendar days. The NAICS code for this project is 237990.

The government is seeking responses from interested small businesses, certified HUBZone, 8A, woman-owned small businesses, or service-disabled veteran-owned businesses by September 16, 2024. Respondents should provide information on their company's small business status, Unique Entity Identifier and CAGE code, bonding capabilities, and relevant past experience on similar projects. There is no set-aside designation for this project, and the government has not named any potential incumbents or current contractors.

Notice text

Buckhorn Lake is located near Buckhorn Kentucky and the project location is just upstream of the main dam structure. This project involves renovation of the existing boat ramp, removal of an outcropping along the road to the boat ramp, improved
drainage along access road and boat ramp, and a work platform for handling of lake debris. The existing boat ramp was constructed in the dry with the dam construction and provides access to the water during winter pool. The new ramp will not be constructed to the same depth (elevation) as that would require a cofferdam and dewatering to accommodate construction. The ramp will be reconstructed to near winter pool and tie into the existing ramp below winter pool. A topographic survey has been acquired to ensure the new boat ramp grades are acceptable for trailer access and to ensure construction is completed to proper grade. Intent is to reconstruct the ramp to similar grades as the existing. It also includes the construction of a large rather flat work
platform near the ramp turnaround area that also has additional parking areas. This platform will require placing rock fill below the lake surface. Drainage improvements will be included along the access road, improved boat ramp, and additional parking area created. Also, curbs and flumes will be incorporated on the west side of the ramp access road to prevent erosion of the
embankment slope on the reservoir side of the ramp. The new storm system will correct deficiencies with the current system. 

Files

File Type Posted
Market Survey Document.pdf PDF

Notice history

Notice Type Posted
Buckhorn Boat Ramp Reconstruction Latest pre-solicitation Pre-Solicitation
This notice Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity