Bonneville Spillway Rock Removal FY21
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9127N21B0005
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KA Maintenance Of Dams
- Place of performance
- Cascade Locks Or Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks rock removal services at the Bonneville Dam spillway located in Cascade Locks, Oregon. The U.S. Army Corps of Engineers, Portland District is procuring the removal of approximately 212.5 cubic yards of rock from the spillway stilling basin. The work must be completed by May 28, 2021. Bids will be evaluated based on technical qualifications and price, with the contract being awarded on a best value basis. The deadline for questions is December 18, 2020 and bids are due by January 4, 2021 at 3:00 PM Pacific Time, with bid opening taking place at that time.
This requirement has been set aside for total small business participation. The primary NAICS code is 237990 and PSC code is R499. The estimated value is between $500,000 to $1,000,000 to remove an identified 321 tons of rock from multiple spillbays according to inspection reports. The place of performance is the Bonneville Lock and Dam facility in Cascade Locks, Oregon.
Notice text
2 versions
Update #2 · Latest ·
The purpose of this Amendment is to post the additional attachment ADV_2020 BON Spillway ROV Rock Inspection Report.
Description
THIS IS A SOLICITATION FOR THE
"BONNEVILLE SPILLWAY ROCK REMOVAL FY21"
MAGNITUDE OF CONSTRUCTION: the estimated cost of the project is
between $500,000.00 and $1,000,000.00
Bid Period: The Solicitation was released 1 December 2020. The Bid Opening is
on 4 January 2021 at 3pm PST.
Point of Contact: The USACE-NWP Contracting Office will be the sole point
of contact for this action. Email responses to the Primary Point of Contact
Brian Roberts at Brian.S.Roberts@usace.army.mil
Update #1 ·
Description
THIS IS A SOLICITATION FOR THE
"BONNEVILLE SPILLWAY ROCK REMOVAL FY21"
MAGNITUDE OF CONSTRUCTION: the estimated cost of the project is
between $500,000.00 and $1,000,000.00
Bid Period: The Solicitation was released 1 December 2020. The Bid Opening is
on 4 January 2021 at 3pm PST.
Point of Contact: The USACE-NWP Contracting Office will be the sole point
of contact for this action. Email responses to the Primary Point of Contact
Brian Roberts at Brian.S.Roberts@usace.army.mil
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bonneville Spillway Rock Removal FY21 | Award Notice | |
| This notice | Solicitation | |
| Bonneville Spillway Rock Removal FY21 | Pre-Solicitation | |
| Bonneville 1 Spillway Rock Removal | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 | ENDIST Portland | No set-aside | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| Navigation lock tainter valve (TV) repair, TV1 | ENDIST Portland | No set-aside | |
| Yaquina River Clamshell Dredging 2027 | ENDIST Portland | No set-aside | |
| W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning | ENDIST Portland | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity