Bonneville lock and DAM powerhouse 1 metering enhancement
Closed Solicitation Posted
- Solicitation number
- W9127N24R0008
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- Z1KA Maintenance Of Dams
- Place of performance
- Cascade Locks, Oregon 97014, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Portland District is seeking contractors to furnish all supervision, engineering, labor, materials, and equipment to install new current transformers (CTs) and replace potential transformers (PTs) at the Bonneville Lock and Dam Powerhouse 1 in Cascade Locks, Oregon. The project is intended to enable the Bonneville Power Administration (BPA) to enter the Energy Imbalance Market by providing additional high-accuracy metering equipment. The government will provide the metering-grade CTs and PTs as government-furnished equipment. Contractor responsibilities include fabricating and installing the new CT supporting structures, installing the CTs, replacing the PTs, and conducting field acceptance testing. Proposals are due by June 24, 2024.
This is a full and open competition procurement with an estimated construction value between $1,000,000 and $5,000,000 under NAICS code 238210 - Electrical Contractors and Other Wiring Installation Contractors. There are no set-aside designations. The place of performance is Cascade Locks, Oregon. The government has not identified any potential incumbents or current contractors for this work.
Notice text
3 versions
Update #3 · Latest ·
10 June 2024: The purpose of this Amendment is to update the Bidder Inquiry information. See Summary of Changes. All other terms and conditions remain unchanged.
06 June 2024: The purpose of this Amendment is to add draw ings/plans that w ere inadvertently left out of the Solicitation package. All other terms and conditions remain unchanged.
Project Scope: The scope of this project consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in accordance with the detailed requirements of this contract.
Background: Bonneville Power Administration (BPA) would like to enter the Energy Imbalance Market (EIM), to do so, BPA needs additional high accuracy class instrument transformers. The requirement for CTs (Current Transformers) to be installed approximately 26 feet above the existing roof elevation, above truss-beam. New mounting supports will also need to be installed for the CTs and pedestals on top of the existing roof. The structural and electrical design, provided by the Hydro Design Center (HDC), provides supports for the new CTs, station post insulators, and busses at locations that provide the required electrical clearances. The HDC designs also evaluates the requirements of supporting the new CTs, station post insulators and busses on legacy roof structural system. The Government will provide the metering-grade CTs and PTs (Potential Transformers), and three deflection insulators. PT’s will be replaced in existing location. The Contractor will maintain the maximum distances from ground for each phase to add the real time metering accuracy PT’s and CT’s as directed by the requirements.
Description of Requirement: The Bonneville Power Administration (BPA) has the required metering CTs and PTs in inventory and will provide these to The U.S. Army Corps of Engineers, Portland District, as Government-Furnished Equipment (GFE) for the metering enhancement installation contract. This eliminates the over one-year lead time for commercial procurement of the CTs and PTs after contract award, which would be an unacceptable delay. Bonneville Project O&M staff have committed to furnishing and installing the low-voltage conduit and wiring to the RTU room in the powerhouse. BPA will design and separately install the new control board in the RTU room and will complete the wiring connections. This reduces the installation contractor's scope to fabrication and installation of the new CT supporting structures as detailed in the Plans and Specifications, installing the CT's, replacing the PTs on their existing supporting structures, and field acceptance testing of the GFE instrument transformers.
The project is located at Bonneville Dam in Multnomah County, Oregon.
Magnitude of Construction: $1,000,000.00 to $5,000,000.00
Set Asides and Codes: Full and Open Competition. The North American Industrial Classification Code (NAICS) for this potential requirement would be 238210, “Electrical Contractors and Other Wiring Installation Contractors”. The related size standard is $19M. The Product Service Code (PSC) is Z1KA - Maintenance of Dams.
Update #2 ·
06 June 2024: The purpose of this Amendment is to add draw ings/plans that w ere inadvertently left out of the Solicitation package. All other terms and conditions remain unchanged.
Project Scope: The scope of this project consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in accordance with the detailed requirements of this contract.
Background: Bonneville Power Administration (BPA) would like to enter the Energy Imbalance Market (EIM), to do so, BPA needs additional high accuracy class instrument transformers. The requirement for CTs (Current Transformers) to be installed approximately 26 feet above the existing roof elevation, above truss-beam. New mounting supports will also need to be installed for the CTs and pedestals on top of the existing roof. The structural and electrical design, provided by the Hydro Design Center (HDC), provides supports for the new CTs, station post insulators, and busses at locations that provide the required electrical clearances. The HDC designs also evaluates the requirements of supporting the new CTs, station post insulators and busses on legacy roof structural system. The Government will provide the metering-grade CTs and PTs (Potential Transformers), and three deflection insulators. PT’s will be replaced in existing location. The Contractor will maintain the maximum distances from ground for each phase to add the real time metering accuracy PT’s and CT’s as directed by the requirements.
Description of Requirement: The Bonneville Power Administration (BPA) has the required metering CTs and PTs in inventory and will provide these to The U.S. Army Corps of Engineers, Portland District, as Government-Furnished Equipment (GFE) for the metering enhancement installation contract. This eliminates the over one-year lead time for commercial procurement of the CTs and PTs after contract award, which would be an unacceptable delay. Bonneville Project O&M staff have committed to furnishing and installing the low-voltage conduit and wiring to the RTU room in the powerhouse. BPA will design and separately install the new control board in the RTU room and will complete the wiring connections. This reduces the installation contractor's scope to fabrication and installation of the new CT supporting structures as detailed in the Plans and Specifications, installing the CT's, replacing the PTs on their existing supporting structures, and field acceptance testing of the GFE instrument transformers.
The project is located at Bonneville Dam in Multnomah County, Oregon.
Magnitude of Construction: $1,000,000.00 to $5,000,000.00
Set Asides and Codes: Full and Open Competition. The North American Industrial Classification Code (NAICS) for this potential requirement would be 238210, “Electrical Contractors and Other Wiring Installation Contractors”. The related size standard is $19M. The Product Service Code (PSC) is Z1KA - Maintenance of Dams.
Update #1 ·
Project Scope: The scope of this project consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in accordance with the detailed requirements of this contract.
Background: Bonneville Power Administration (BPA) would like to enter the Energy Imbalance Market (EIM), to do so, BPA needs additional high accuracy class instrument transformers. The requirement for CTs (Current Transformers) to be installed approximately 26 feet above the existing roof elevation, above truss-beam. New mounting supports will also need to be installed for the CTs and pedestals on top of the existing roof. The structural and electrical design, provided by the Hydro Design Center (HDC), provides supports for the new CTs, station post insulators, and busses at locations that provide the required electrical clearances. The HDC designs also evaluates the requirements of supporting the new CTs, station post insulators and busses on legacy roof structural system. The Government will provide the metering-grade CTs and PTs (Potential Transformers), and three deflection insulators. PT’s will be replaced in existing location. The Contractor will maintain the maximum distances from ground for each phase to add the real time metering accuracy PT’s and CT’s as directed by the requirements.
Description of Requirement: The Bonneville Power Administration (BPA) has the required metering CTs and PTs in inventory and will provide these to The U.S. Army Corps of Engineers, Portland District, as Government-Furnished Equipment (GFE) for the metering enhancement installation contract. This eliminates the over one-year lead time for commercial procurement of the CTs and PTs after contract award, which would be an unacceptable delay. Bonneville Project O&M staff have committed to furnishing and installing the low-voltage conduit and wiring to the RTU room in the powerhouse. BPA will design and separately install the new control board in the RTU room and will complete the wiring connections. This reduces the installation contractor's scope to fabrication and installation of the new CT supporting structures as detailed in the Plans and Specifications, installing the CT's, replacing the PTs on their existing supporting structures, and field acceptance testing of the GFE instrument transformers.
The project is located at Bonneville Dam in Multnomah County, Oregon.
Magnitude of Construction: $1,000,000.00 to $5,000,000.00
Set Asides and Codes: Full and Open Competition. The North American Industrial Classification Code (NAICS) for this potential requirement would be 238210, “Electrical Contractors and Other Wiring Installation Contractors”. The related size standard is $19M. The Product Service Code (PSC) is Z1KA - Maintenance of Dams.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Bonneville Dam Metering Enhancements | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Bonneville Powerhouse II Unwatering Pump Replacement | ENDIST Portland | Total Small Business | |
| John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 | ENDIST Portland | No set-aside | |
| Navigation lock tainter valve (TV) repair, TV1 | ENDIST Portland | No set-aside | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| LLA Navigation Lock Switchgear | ENDIST Walla Walla | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity