Bluegrass Army Depot (BGAD), KY D/B/B construction of a new Consolidated Shipping Center (CSC)

Award Notice Posted

Solicitation number
W912QR-16-R-0019
Agency
Awarded
to Orocon - Carothers JV3
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
W912QR-16-C-0017 Federal contract award
PSC
Not on record
Place of performance
Blue Grass Army Depot, 431 Battlefield Memorial Highway Richmond, Kentucky, United States

Notice details come from SAM.gov. Updated .

Notice text

***THIS IS AN 8(A) COMPETITIVE SET ASIDE FOR REGIONS IV AND V.***


The work includes the building of the new Consolidated Shipping Center (CSC) for the Blue Grass Army Depot (BGAD). The new facility will replace the tasks currently occurring in (Buildings 902, 904). The new building will be the third phase of a shipping receiving area master plan that includes multi-vehicular transport of munitions.

The new 25,156 GSF facility will be located within LP 92 - to the south of Route 8-17, to the north of Route 1 and the railroad tracks, and to the west of the Existing Block and Brace facility (building 30370). The majority of the proposed site is currently a graveled storage yard for containers and existing asphalt roadway. The remaining portions of the site are undeveloped and covered with grass, brush, and trees. Existing utilities within or immediately adjacent to the project limits include potable water, sanitary sewer, storm drains and culverts, gas lines, and electrical lines.

The new BGAD CSC site consists of a new consolidated shipping center, a large fenced concrete paved area for truck loading/unloading, staging, and parking, improvements and widening to the access roadway including a new truck scale, and a new gravel container storage area. The CSC Building will be a combination of truck dock level work bays and grade level support facilities. The facility will house compartmentalized bays for various grades and classes of munitions, covered exterior work areas, interior work areas for packing and re-packing of shipping pallets as well as an area for management of task orders, a truck driver's safe haven / lounge and restrooms.

The new BGAD CSC will be constructed using conventional cast concrete load bearing cavity walls and veneer for the dock level portion of the facility and concrete masonry cavity walls and veneer for the grade level portion of the facility. The roof is a mono-slope insulated low slope roof on metal deck. Exterior design elements conform to BGAD Installation Appearance design guidelines. Building systems include Domestic Plumbing, Fire Suppression, Fire Alarm and Mass Notification, HVAC, Electrical Power and Lighting, Communications, and Lightning protection.

Contractors wishing to attend the site visit scheduled on (Approximately 21 days after RFP Issuance) must complete the Blue Grass Army Depot Criminal Records Check form and submit to the Directorate of Emergency Services no later than (7 days after RFP Issuance). Failure to do so will prevent access to the proposed site of the Consolidated Shipping Center. Additionally, due to security requirements and escort limitations each Contractor and subcontractor may only bring two representatives. Once paperwork is submitted you will need to reserve a time slot for the site visit. You can request to reserve a spot for the site visit by contacting Gene Callebs, Master Planner at 859-779-6419.

Files

Notice history

Notice Type Posted
Bluegrass Army Depot (BGAD), KY D/B/B construction of a new Consolidated Shipping Center (CSC) Latest Award Notice
This notice Original Award Notice