Bldg. 4309a Target Flip Area and 593 at Kirtland AFB
Award Notice Posted
- Solicitation number
- W912PP23Q0051
- Agency
-
ENDIST Albuquerque
US Army Corps of Engineers, Department of Defense
- Awarded
- to Altima Construction Inc.
- Set-aside
- 8(a) Sole Source
Opportunity facts
- Contract number
- W912PP23P0032 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Z1AA Maintenance Of Office Buildings
- Place of performance
- Kirtland AFB, New Mexico 87117, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The contract was awarded to Altima Construction Inc. for $111,536.52 on August 22, 2023, for the repair and renovation of Building 430A and Building 593. The contractor is responsible for demolition work, including removal of existing flooring, lighting, and doors, as well as the installation of new flooring, walls, doors, lighting, and workbenches. The contractor is also tasked with salvaging and reinstalling data and phone jacks, and connecting new furniture to power.
- Demolition of existing structures including flooring, lighting, and doors.
- Installation of new rubber flooring, carpet tiles, and metal stud wall.
- Installation of new doors, frames, and associated hardware.
- Installation of new lighting and emergency lights.
- Salvaging and reinstalling data and phone jacks, and connecting new furniture to power.
Notice text
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.
The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 430A Repair Target Prep Area and Building 593.
- Demolition
- Contractor must remove existing flooring and wall base in its entirety.
- Contractor must demolish indicated portion of wall and prep for installation of door frame.
- Contractor must remove existing door.
- Contractor must remove existing lighting in its entirety.
- Contractor must remove and salvage data drop.
- Contractor must remove existing emergency lights and wire mold in their entirety.
- Contractor must remove light switch and cover plate. Contractor must reuse circuit.
- Existing HVAC supply and return diffusers to remain. Contractor to clean and comfort balance.
- Contractor must remove existing light switch and circuit in their entirety. Replace with blank cover plate to match existing.
- Contractor must remove and salvage indicated wall mounted data jacks in Room 2 in B593. Patch and paint to match existing wall.
- Contractor must remove and salvage indicated wall mounted phone jacks in Room 2 in B593. Patch and paint to match existing wall.
- Construction
- Contractor must provide and install new rubber flooring (FL-1) and wall base (RB-1).
- Contractor must provide and install carpet tiles (FL-2) and wall base (RB-1).
- Contractor must construct new 3-5/8" 20-gauge metal stud wall with 3" sound insulation and one-layer pf 5/8" gyp. board on each side. Tape, float, texture and paint to match existing adjacent walls, install rubber wall base (RB-1). Refer to material schedule on sheet A-201. Construct wall to ceiling, as indicated on drawings.
- Contractor must install salvaged data drop and conduit.
- Contractor must patch and paint walls to match existing, as indicated on drawings.
- Contractor must provide and install new doors, frames, and associated hardware, refer to door schedule on sheet A-201, as indicated on drawings.
- Contractor must provide and install new light switch with cover plate to match existing. Tie into existing circuit.
- Contractor must provide and install nine (9) new surface- mounted lights (L-1). Refer to lighting schedule on sheet A-201.
- Contractor must provide and install new light switch with cover plate to match existing. Contractor must run and tie into new circuit, as indicated on drawings.
- Contractor must provide and install new emergency light (L-2). Refer to lighting schedule on sheet A-201, as indicated on drawings.
- Contractor must provide and install new emergency exit lights (L-3). Refer to lighting schedule on sheet A-201, as indicated on drawings.
- Contractor must patch and paint ceiling to match existing walls, as indicated on drawings.
- Contractor must provide and install new workbenches and shelves, as indicated on drawings.
- Contractor must install one (1) new surface mounted drop for NIPR, cable to be cat 6 green. Terminate per comm notes on sheet G-000, as indicated on drawings.
- Contractor must replace door and associated hardware with new door with tempered glass and closer, refer to elevation 3 on drawings for B593.
- Contractor must install new trilogy cipher lock and associated hardware on new door in B593.
- Contractor to install salvaged wall mounted data jacks and conduit on indicated wall in Room 2 in B593. Contractor to hook up data to new furniture (NIC).
- Contractor must install salvaged wall mounted phone jacks and conduit on indicated wall in Room 2 in B593. Contractor to hook up phone ports to new furniture (NIC).
- Contractor to connect new furniture to indicated power in Room 2 in B593.
Awarded contract W912PP23P0032 to ALTIMA CONSTRUCTION INC for 111536.52 on 2023-08-22.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity