Below Piggott Seepage Remediation & Below AR HWY 90 Channel Cleanout

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912EQ-19-SB-0005
Agency
Responses due
Set-aside
HUBZone

Opportunity facts

Place of performance
See Work Location Above Clay & Greene Counties Ar Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks capability statements from small businesses for the Below Piggott Seepage Remediation & Below AR HWY 90 Channel Cleanout project. The U.S. Army Corps of Engineers Memphis District will construct approximately 7 miles of berms along the levee and relocate 10 miles of field ditches. The scope also includes cleaning out 5 miles of the St. Francis River channel below AR Highway 90 and constructing two sediment traps. Firms must demonstrate experience with demolition, excavation, embankment work, culvert installation, and environmental compliance. Responses are due by 1:00 PM CST on June 4, 2019 and are limited to eight pages.

The opportunity is set aside for HUBZone small businesses. The primary NAICS code is 237990 for heavy construction and the estimated value ranges from $10-25 million. Work will take place in Clay and Greene Counties, Arkansas over three years, beginning in November 2019. Firms must show past experience on similar projects valued over $10 million and provide references, bonding information, and resumes of key personnel.

Notice text

Sources Sought - Market Capability Survey

Title of Work: Below Piggott Seepage Remediation & Below AR HWY 90 Channel Cleanout

The US Army Corps of Engineers, Memphis District, is seeking capability statements from all Small Business sources with the capabilities and experience to perform the following work:

Project Description: The project involves the construction of approximately 7 miles of berm addition to the landside of the levee. The berms will be approximately 5 ft high and 150 ft wide. The construction also includes the relocation of approximately 10 miles of field ditches, approx. 3-4 ft deep and 10-15 ft wide in order to account for ditches that are filled in to accommodate berm construction.
In addition, the project scope includes a channel cleanout of approximately 5 miles of the main channel of the St. Francis River below AR Highway 90 and (2) associated sediment traps. In addition to the cleanout, all existing spoil banks from prior channel work will be removed from the floodway. All material from existing spoil banks and from the channel cleanout will be used for borrow material to construct the levee berms.

North American Industry Classification System: 237990 Small Business Size Standard: $36.5M

Acquisition Strategy: The Government intends to set-aside project for HUBZone contractors. The final acquisition strategy to be determined after analysis of responses. Pricing is Firm Fixed Price.

Work Location: The project is located in Clay and Greene Counties, Arkansas, approximately 5 miles west of Kennett, MO. The levee segment extends approx. 5 miles north and 5 miles south of AR Highway 90 (approx. 10 miles total). The channel portion of the project extends approx. 5 miles downstream of the AR Highway 90 bridge.

Requirement: Firms responding to this announcement are requested to demonstrate in writing its capability to perform the work for this project by addressing the following items:
(1) Provide the Firms name, address, DUNS #, firm business size and socio-economic status.

(2) Provide examples (minimum of two) of projects similar in nature to the work in the above project description your firm has performed in the past 8 years. Each example should include a detailed project description, location, the dollar value of the project, the beginning and end date of the project. These projects should be relevant in terms of size, scope, and complexity. Experience in demolition, culvert layout and construction, cofferdam layout and construction, clearing/grubbing, excavation, embankment placement and compaction, access and haul road layout and construction, gravel resurfacing, environmental protection, and storm water pollution prevention, culvert replacements; single, double and triple barrel reinforced concrete box culverts.

(3) For the relevant example projects requested in item (2), indicate whether your firm was the prime or subcontractor. If the prime, indicated what percentage of the work you performed. If the firm was a subcontractor, identify your role in the contract and explain the relevancy of the role. Also provide copies of performance rating for projects submitted and resume of key personnel.

(4) Provide a list of the firm's current on-going projects, the bonding amount and the expected completion dates. Also include the name, point of contact, and phone number of the prime contractor's bonding company.

Magnitude of Work: Between $10,000,000 and $25,000,000

Contract Duration: 3 years

Estimated Start Date: November 2019 (Exact date TBD)

Site Visit Time & Date: N/A

Response Time & Date: 1 PM CST, 4 June 2019

All interested parties should submit qualifying documentation not later than the response time and date to the below address. Electronic submissions are acceptable. Send via email (PDF format) to thomas.e.mercer@usace.army.mil  Interested firms shall provide one copy of the above documentation. Responses shall be limited to eight (8) pages. The Government will not pay for any material provided in response to this market survey; nor return the data provided.

USACE, Memphis District
Small Business Program Office
ATTN: Thomas E Mercer
167 N. Main St.
Memphis, TN 38103

Notice history

Notice Type Posted
Below Piggott Seepage Remediation Award Award Notice
Below Piggott Seepage Remediation Amendment 0001 Latest solicitation Solicitation
Below Piggott Seepage Remediation Solicitation
Below Piggott Seepage Remediation Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
St Francis Town Levee Renovation Saint Francis, Arkansas, United States · NAICS 237990 ENDIST Memphis No set-aside
Mill Creek Section 205 Flood Risk Management Improvements Mill Creek Flood Control ChannelWalla Walla, WA 99362Walla Walla County 99362 · NAICS 237990 ENDIST Walla Walla No set-aside
Upper mississippi river restoration (UMRR) pool 12 floodplain forest stage one (1) - habitat rehabilitation and enhancement project (HREP) Mississippi River Basin Pool 12, from Lock and Dam 12 near Bellevue, Iowa, to Lock and Dam 11 in Dubuque, Iowa and Jo Davies County, Illinois 52001 · NAICS 237990 ENDIST Rock Island No set-aside
Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
FY26 Harlingen Placement Area (PA)13 and 10 Improvements Harlingen, Texas 78550, United States · NAICS 237990 ENDIST Galveston No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors