Bedrock Maintenance Excavation, Missouri River at Florence Bend Near Omaha, NE

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W9128F22B0001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Omaha, Nebraska 68112, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Omaha District plans to issue an invitation for bid to conduct bedrock maintenance excavation along the Missouri River near Omaha, Nebraska. The project aims to restore minimum navigation channel dimensions between river miles 626.4 to 625.0 by removing material that has accumulated due to river degradation. Bids are due on or around February 22, 2022 and the construction duration is 200 calendar days after notice to proceed. The solicitation documents will be posted to SAM.gov and the evaluation criteria will prioritize cost.

This opportunity is set aside for total small business and has an estimated value between $5-10 million. The NAICS code for heavy construction is 237990 and the predominate PSC code is R499 for dredging and excavation. This is a recurring maintenance project for the Omaha District to ensure navigability of this stretch of the Missouri River. The timeframe of 200 days for completion and magnitude of construction budget suggest this will be awarded to a regional contractor experienced in marine construction and dredging services.

Notice text

The U.S. Army Corps of Engineers (USACE) Omaha District plans to issue an invitation for bid (IFB) using the FAR Part 14 – Sealed Bidding method for the project titled: Bedrock Maintenance Excavation, Missouri River at Florence Bend Near Omaha, NE. The tentative date to issue the IFB is 18 January 2022, with bids due and bid opening on or around 22 February 2022. 

Downstream of the I-680 bridge, near Omaha, NE, the Missouri River navigation channel contacts a bedrock outcrop commonly referred to as the Florence Reef.  Missouri River degradation has resulted in insufficient navigation channel dimensions at several locations within the area between river mile (RM) 626.4 to 625.0. Material removal is necessary to restore the minimum navigation channel dimensions on the Missouri River in Nebraska and Iowa. 

Construction duration is 200 calendar days after issuance of the notice to proceed.

Estimated Magnitude of Construction is between $5,000,000 and $10,000,000.

USACE Omaha District will post all solicitation documents to SAM.gov.

Notice history

Notice Type Posted
Bedrock Maintenance Excavation, Missouri River at Florence Bend Near Omaha, NE Award Award Notice
Bedrock Maintenance Excavation, Missouri River at Florence Bend Near Omaha, NE Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025 New Orleans, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM25011) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Mississippi River, New Orleans Harbor Cutterhead Dredge No. 1-2025 New Orleans, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Atchafalaya river BAY, bar, and crewboat cut cutterhead dredge NOS. 4-2026,  OM26062 Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025 Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors