Barren River Bulkhead and Cylinder Painting

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912QR24Q0050
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Glasgow, Kentucky 42141, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Louisville is seeking contractors to provide labor, materials, supplies, tools, and equipment for the Barren River Lake Bulkhead and Cylinder Painting project. The contractor will be responsible for surface preparation, debris containment and disposal, and painting of various components at the Barren River Lake facility. The total estimated construction value is between $50,000 and $125,000. Contractors must be registered in the System for Award Management (SAM.gov) prior to submitting a proposal. Quotes are due on May 17, 2024 by 12:00 PM Eastern Time, and work must begin within 14 calendar days of award and be completed within 90 calendar days.

This solicitation is not set-aside for any specific business size or category. The NAICS code is 238320, with a $19M size standard. The place of performance is Glasgow, KY 42141, USA. Payment will be made via Electronic Funds Transfer, and contractors are highly encouraged to review the relevant FAR clause regarding this requirement.

Notice text

Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to  https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on “View FFP Contract Changes Playbook Here”. 

The contractor’s work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment
necessary to assure that all work is conducted in accordance with the contract requirements and all applicable
Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached
specifications and all other terms and conditions incorporated herein. Work will shall begin with in 14 calendar days
of award and must conclude 90 calendar days after date of award.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission of
proposal. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic
Funds Transfer – System for Award Management, which indicates “All payments by the Government under this
contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by
going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after
submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their
registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov.
Please begin the registration process immediately in order to avoid delay of the contract award should your firm be
selected.

Files

File Type Posted
W912QR24Q0050.pdf PDF

Notice history

Notice Type Posted
Barren River Bulkhead and Cylinder Painting Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) NAICS 237110 ENDIST Louisville No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors