Ball-on-Cylinder Lubricity Evaluator
Closed Solicitation Posted
- Solicitation number
- FA860120Q0099
- Agency
- AFLCMC Wright Patterson AFB Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 334516 Analytical Laboratory Instrument Manufacturing
- Place of performance
- Kadena Air Base, Okinawa 96368 JPN
Notice details come from SAM.gov. Updated .
Notice text
The procurement is for one Ball-on-Cylinder Lubricity Evaluator (BOCLE) instrument that will be used at AFPA laboratories. Aerospace Fuels Laboratories perform quality control testing for JET A grade aviation fuel.
BOCLE instrument must at a minimum:
- Meet all the requirements in ASTM D5001, “Standard Test Method for Measurement of Lubricity of Aviation Turbine Fuels by the Ball-on-Cylinder Lubricity Evaluator (BOCLE)”.
- In accordance with T.O. 42B-1-1, “Quality Control Of Fuels and Lubricants”; MIL-DTL-83133K, “Detail Specification: Turbine fuel, Aviation, Kerosene Type, JP-8 (NATO F-34), NATO F-35, and JP-8+100 (NATO F-37)”; DEF STAN 91-091, “Turbine Fuel, Kerosene Type, Jet A- 1; NATO Code: F-35; Joint Service Designation: AVTUR” and ASTM D1655-15 “Standard Specification for Aviation fuels”.
- Generates a measurable wear scar by friction between a stationary ball and a rotating cylinder.
- Capable of cylinder rotational speed of 240 ± 1 rpm.
- The temperature of the fuel tank reservoir is controlled.
- Fluid temperature should be maintained at 25 ± 1℃.
- The relative humidity of the compressed air which is circulated into and above the test fluid, also including the air flow rate, is controlled.
- Conditioned air should be controlled at 10 ± 0.2% relative humidity at 25 ± 1℃.
- Air flow rate should be maintained at 3.8 L/min for duration of test.
- No microscope is needed, if sold separately.
- If attached, microscope should be capable of 100x magnification and suitable of measuring the wear scar to the nearest 0.01nm.
- No computer is needed, if sold separately.
- Typical power of 100-240V, 250W.
- Delivery within 4-8 week lead time after receipt of award.
Attachments
| File | Type | Posted |
|---|---|---|
| BOCLE REQUIREMENT.docx | DOCX document | |
| Synopsitation.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity