Ball-on-Cylinder Lubricity Evaluator

Closed Solicitation Posted

Solicitation number
FA860120Q0099
Agency
AFLCMC Wright Patterson AFB Lifecycle Management Center, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
334516 Analytical Laboratory Instrument Manufacturing
PSC
6695 Combination And Miscellaneous Instruments
Place of performance
Kadena Air Base, Okinawa 96368 JPN

Notice details come from SAM.gov. Updated .

Notice text

The procurement is for one Ball-on-Cylinder Lubricity Evaluator (BOCLE) instrument that will be used at AFPA laboratories.  Aerospace Fuels Laboratories perform quality control testing for JET A grade aviation fuel.

BOCLE instrument must at a minimum:

  1. Meet all the requirements in ASTM D5001, “Standard Test Method for Measurement of Lubricity of Aviation Turbine Fuels by the Ball-on-Cylinder Lubricity Evaluator (BOCLE)”.
    1. In accordance with T.O. 42B-1-1, “Quality Control Of Fuels and Lubricants”; MIL-DTL-83133K, “Detail Specification: Turbine fuel, Aviation, Kerosene Type, JP-8 (NATO F-34), NATO F-35, and JP-8+100 (NATO F-37)”; DEF STAN 91-091, “Turbine Fuel, Kerosene Type, Jet A- 1; NATO Code: F-35; Joint Service Designation: AVTUR” and ASTM D1655-15 “Standard Specification for Aviation fuels”.
  2. Generates a measurable wear scar by friction between a stationary ball and a rotating cylinder.
    1. Capable of cylinder rotational speed of 240 ± 1 rpm.
  3. The temperature of the fuel tank reservoir is controlled.
    1. Fluid temperature should be maintained at 25 ± 1℃.
  4. The relative humidity of the compressed air which is circulated into and above the test fluid, also including the air flow rate, is controlled.
    1. Conditioned air should be controlled at 10 ± 0.2% relative humidity at 25 ± 1℃.
    2. Air flow rate should be maintained at 3.8 L/min for duration of test.
  5. No microscope is needed, if sold separately.
    1. If attached, microscope should be capable of 100x magnification and suitable of measuring the wear scar to the nearest 0.01nm.
  6. No computer is needed, if sold separately.
  7. Typical power of 100-240V, 250W.
  8. Delivery within 4-8 week lead time after receipt of award.

Attachments

Files attached to this notice, newest first
File Type Posted
BOCLE REQUIREMENT.docx DOCX document
Synopsitation.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity