B-21 Renovate B7918 at Ellsworth AFB, SD

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9128F25RA052
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Ellsworth AFB, SD 57706

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Engineering District Omaha is soliciting proposals for the renovation of Building 7918 at Ellsworth Air Force Base in South Dakota, which houses the 28th Bomb Wing Command Post. The project involves comprehensive renovation of approximately 2,500 square feet of space, including installation of new communications and security features, wall, floor, ceiling, and finish construction. The scope includes potential installation of new Intrusion Detection Systems and Access Control Systems, replacement of utilities and infrastructure on perimeter walls with wall-mounted conduit and devices, replacement of receptacles and lighting, removal and replacement of area communications with new fiber runs, and upgrading the Command Post entrance to meet enhanced security and access control requirements. The solicitation has been amended three times, with the most recent amendment updating Davis Bacon wage rates and extending the proposal submission deadline to August 20, 2025, at 2:00 PM CST. Pricing must remain valid for 90 days from the proposal due date, and contractors must provide information required by specified sections including SF1442.

This opportunity is designated as a Total Small Business set-aside, restricting competition to qualified small businesses only. The project falls under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Y1AZ for Construction of Other Administrative Facilities and Service Buildings. Performance will take place at Ellsworth Air Force Base in South Dakota, supporting critical military command and control operations for the 28th Bomb Wing. The solicitation does not specify contract values or budget ranges, nor does it identify any incumbent contractors. Key personnel contacts include Contract Specialist Sarah Martin and Contracting Officer Brittany Gull, both from the U.S. Army Corps of Engineers. The amendments have included site visit rosters, revised drawings and specifications, updated wage rates, and multiple deadline extensions, indicating the complexity and security-sensitive nature of this command post renovation project.

Notice text

4 versions

Update #4 · Latest ·

Amendment 0003: THE PURPOSE OF THIS AMENDMENT IS AS FOLLOWS: 1. UPDATE THE DAVIS BACON WAGE RATE FROM SD20250027 DATED 01/24/2025 TO SD20250027 DATED 08/01/2025. (SEE SUMMARY OF CHANGES) 2. DATE FOR RECEIPT OF REVISED PROPOSALS IS 20 AUG 2025 AT 1400 CST. PRICING SHALL REMAIN VALID FOR 90 DAYS FROM 20 AUG 2025 POCs: Contract Specialist: Sarah Martin, sarah.a.martin@usace.army.mil, Contracting Officer: Brittany Gull, brittany.c.gull@usace.army.mil

Update #3 ·

Amendment 0002: The purpose of this amendment is as follows: 1. Updated specs and drawings. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. POCs: Contract Specialist: Sarah Martin, sarah.a.martin@usace.army.mil, Contracting Officer: Brittany Gull, brittany.c.gull@usace.army.mil

Update #2 ·

Amendment 0001: The purpose of this amendment is as follows: 1. Site Visit Roster 2. Revision of Drawings and Specifications 3. Updated Section 00 21 004. Proposal date extended from 05 August 2025 to 12 August 2025. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. POCs: Contract Specialist: Sarah Martin, sarah.a.martin@usace.army.mil, Contracting Officer: Brittany Gull, brittany.c.gull@usace.army.mil

Update #1 ·

Project will consist of renovating the 28 BW Command post residing in B7918. Renovation will include upgrading the space, approximately 2,500 SF, to include new communications and security features with associated wall, floor, ceiling, and finish construction. Installation of new Intrusion Detection Systems (IDS) and Access Control Systems (ACS) may be required. Utilities and infrastructure on facility perimeter walls may demolished and replaced with wall mounted conduit and devices. Receptacles and lighting will be replaced as needed for area changes. Area communications will be removed and new fiber runs will be required. Command Post entrance must be upgraded to meet upgraded security and access control requirements.RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00. THIS SOLICITATION IS A TOTAL BUSINESS SET-ASIDE. Contract Specialist: Sarah Martin, sarah.a.martin@usace.army.mil. Contracting Officer: Brittany Gull, brittany.c.gull@usace.army.mil

Notice history

Notice Type Posted
B-21 Renovate B7918 at Ellsworth AFB, SD Award Award Notice
This notice Latest solicitation Solicitation
B-21 B7918 Command Post Renovation - Ellsworth AFB, South Dakota Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Two Munitions Storage Igloos at Ellsworth AFB, South Dakota Ellsworth AFB, South Dakota · NAICS 236220 ENDIST Omaha Total Small Business
PKA Relocatable Facility FE Warren AFB, Wyoming 82005, United States · NAICS 332311 Global Strike Command Total Small Business
Sources Sought - Construction Repair Building 6413 Secure Space (511669 & 519580) Barksdale AFB Barksdale AFB, Louisiana 71110, United States · NAICS 236220 ENDIST Fort Worth No set-aside
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Request for information/sources sought NAICS 236220 ENDIST Albuquerque No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity