AZ PFH 3-1(2), Clints Well
Awarded Award Notice Posted
- Solicitation number
- DTFH68-12-B-00005
- Agency
- Federal Highway Administration Department of Transportation
- Awarded
- to Fann Contracting, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH68-12-C-00019 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Lake Mary Road in Coconino County Flagstaff, Arizona 86001, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Apr 19, 2012 11:25 am
AZ PFH 3-1(2), Flagstaff - Clint Wells
The project site locations consist of conducting 3R Pavement Improvements, guardrail and signing.
•§ Schedule A - 9.51 miles of roadway paving and pullouts. Total of 40,206 tons of Superpave pavement. Approximately 187,952 square yards of Pulverization (8 inch depth). Approximately 78 tons of fog seal. This schedule also includes permanent signing and striping as well as approximately 1,713 linear feet of Guardrail Sytem G4.
•§ Option W - 4.5 miles of roadway paving and pullouts. Total of 19,408 tons of Superpave pavement. Approximately 90,695 square yards of Pulverization (8 inch depth). Approximately 38 tons of fog seal. This Option also includes permanent signing and striping as well as approximately 3,238 linear feet of Guardrail System G4.
•§ Option X - 3.1 miles of roadway paving and pullouts. Total of 13,775 tons of Superpave pavement. Approximately 64,341 square yards of Pulverization (8 inch depth). Approximately 27 tons of fog seal. This Option also includes permanent signing and striping as well as approximately 2,438 linear feet of Guardrail System G4.
Weather limitations for surface treatments - April 15, 2012 to October, 2012.
Significant quantities include 40,206 tons of paving for the section of Schedule A beginning at the north end of this route at MP 307.5 and ending at MP 298.0.
Estimated cost for the base schedule and two options option is $6 to $14 million.
It is anticipated that this project will be advertised in early May, 2012 with construction beginning in late June, 2012 and extending through October, 2012.
Attachments
| File | Type | Posted |
|---|---|---|
| FO IFB - AZ PFH 3-1_2_ Flagstaff-Clint's Well.pdf |