Award Notice - MOUTH OF THE COLUMBIA RIVER - NORTH JETTY MAJOR MAINTENANCE - PHASE II -

Award Notice Posted

Solicitation number
W9127N26CA033
Agency
Awarded
Set-aside
No set-aside

Opportunity facts

Contract number
W9127N26CA033
Place of performance
Ilwaco, Washington 98624, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Portland District awarded a contract for North Jetty Major Maintenance – Phase II at the Mouth of the Columbia River near Ilwaco, Washington, with the award made on September 11, 2026.

The project encompasses expedited repairs to approximately 900 feet of the North Jetty trunk, primarily on the ocean side, above –5 feet NAVD88 elevation. Work includes toe, side slope, and crest repair and reconstruction to a design crest width of 30 feet, side slopes of 1V:2H, and crest elevation of +24.5 feet NAVD88. The estimated stone volume required is approximately 11,100 cubic yards with minimum stone densities of 185 pounds per cubic foot. The award was made under unrestricted competition with no set-aside applied. Place of performance is Klickitat County, Washington.

Notice text

This award announcement is for the North Jetty Major Maintenance – Phase II, Klickitat County, Washington.

The MCR federal navigation project is situated at the border between Washington and Oregon, where the Columbia River meets the Pacific Ocean. Deep-draft navigation through the MCR is facilitated by three primary navigation structures-North Jetty, South Jetty, and Jetty A-with a combined authorized length of 10.2 miles. The North Jetty has an authorized length of 2.5 miles extending to Station 130+00; however, it has not been constructed to its full authorized length. The initial construction of the North Jetty concluded at approximately Station 122+00, resulting in a constructed length of approximately 2.3 miles. This jetty was the second of the three to be constructed and was completed in 1917. Subsequent repairs and rehabilitations along various sections of the North Jetty were carried out in 1939, 1965, 2005, 2015, and 2019. Both initial construction and repairs utilized stone with a minimum density ranging from 167 to 180 pounds per cubic foot (pd). The side slopes of the jetty vary between 1:1.25 and 1:2 (vertical: horizontal), with an average crest elevation of 25 ft msl. Since construction, a total of 3,569,030 tons of armor stone have been placed. 

The Mouth of the Columbia River (MCR) North Jetty is located at the southwest corner of Washington State near Ilwaco, WA. Access to the north jetty is from N Head Rd and Cape Disappointment State Park. Mandatory work for MCR North Jetty Expedited Repairs includes toe, side slope, and crest repair construction above -5 feet NAVD88 elevation along approximately 900 feet of the jetty trunk primarily on the ocean side. These sections will be repaired and reconstructed to a design crest width of 30 feet, side slopes of 1V:2H and a crest elevation of +24.5 feet NAVD88. The estimated stone volume required for the repairs is approximately 11,100 cubic yards with an approximate minimum stone densities of 185 pounds per cubic foot. Expected stone size is between 20-40 tons each. A jetty crest haul road on top of the jetty must be constructed and staging area developed to store the large quantity of jetty armor stone.

Awarded contract W9127N26CA033 to ORION GOVERNMENT SERVICES LLC for 26727470.00 on 2026-09-11.

Notice history

Notice Type Posted
This notice Award Award Notice
MOUTH OF THE COLUMBIA RIVER - NORTH JETTY MAJOR MAINTENANCE - PHASE II - Abstract Latest special notice Special Notice
Mouth of the columbia river - north jetty major maintenance - phase II Original Solicitation