Auger System Removal Cleanout
Closed Pre-Solicitation Posted
- Solicitation number
- A25-008
- Agency
- Air Force Sustainment Center Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- Not on record
- Place of performance
- Tinker AFB, Oklahoma 73145, United States
- Points of contact
-
- Shana Mandley shana.mandley@us.af.mil (405) 739-4148
- Sheridan Robison sheridan.robison@us.af.mil (405) 582-5686
Notice details come from SAM.gov. Updated .
About this opportunity
The AMXG (569th Squadron) of the Department of the Air Force Materiel Command Air Force Sustainment Center is requesting the remanufacturing of two custom ABS Blast Abrasive Floor Auger Systems. The key requirements include the removal, cleaning, and remanufacture of various parts such as lids, augers, shafts, bearings, and seals due to corrosion and damage. The work also involves correcting any concrete damage and reinstalling the refurbished components. While no specific evaluation criteria or award dates are provided, the Pre-Solicitation notice is posted with a response due date of September 24, 2024.
This opportunity does not have a set-aside designation, and no potential incumbents or current contractors are named. The total quantity is two auger systems, but no award value or budget range is specified. The performance period and other key numerical details are also not included in the Pre-Solicitation notice.
Notice text
The AMXG (569th Squadron) is requesting utilization of funds for the remanufacturing of our custom ABS Blast Abrasive Floor Auger System. The requested equipment item descriptions/specifications are outlined below:
• Remanufacture on Two (2) Abrasive Floor Auger System, Model Number: Custom / Serial # 804 OC #’s 20729/20730, to include the following:
o Removal of Lids, Grating, Shed Plates, Augers, and Throughs
o Clean & Clear Water and Debris from under Media Reclaim Trough including pressure wash (x2) separate reclaims that are approximately 39’ in length.
o Clean & Clear Water and Debris from under Media Reclaim Trough including pressure wash (x2) separate reclaims that are approximately 39’ in length.
o Remanufacture of the following parts needing repair due to corrosion/damage:
Four (4) each, ABS-BRG2000FB (BRG2000FB / 2" Flange Bearing, 4-bolt)
Four (4) each, ABS-SRP-2 (Seal Retainer Plate for 2" Flange Bearing, apprx. 6" x 6")
Sixteen (16) each, ABS-SPACER BAR-2FB (SPACER BAR-2FB / Spacer Bar for 2" Flange Bearing)
Four (4) ABS-SEALFE2 (Felt Seal for 2" Flange Bearing - (apprx. 6" x 4"),)
Two (2) each, ABS-BRG2000HB (2" Hanger Bearing)
Two (2) each, ABS-SEALFEHB (Felt Seal for 2" Hanger Bearing, Large Hole)
Two (2) each, ABS-SEALFEHBS (SEALFEHBS / Felt Seal for 2" Hanger Bearing, Small Hole)
One (1) each, ABS-HGRBRGCVRS-LH (Hanger Bearing Cover, Standard Style, Left Hand)
One (1) each, ABS- HGRBRGCVRS-RH (Hanger Bearing Cover, Standard Style, Right Hand)
Two (2) each, ABS-SH2X2434D4 (2" Dia x 24-3/4" Long Drive Shaft with 4" Keyway (shaft closest to elev.))
Two (2) each, ABS-SH2X2450QRC (2" Dia x 24-1/2" Long Coupling Shaft, Quick Release)
Two (2) each,ABS-SH2X1534E (2" Dia x 15-3/4" Long Free End Shaft)
Four (4) each, ABS-POLYBUSHING-0 (2" ID x 5" OD x 10" Long Polyurethane Bushing with 5/8" dia. Bolt Holes)
Twenty (20) each,ABS-BOLT-AUGER-7G8 ((1) 5/8-11 x 7" Grade 8 Hardened Bolt & (1) Nylock Nut for auger)
o Correct any concrete areas that are damaged, to include applying concrete sealant to exposed dry pits, and any damage that occurs during removal of troughs.
o Reinstallation of Troughs, Augers, Shed Plates, Grating, and Lids
Attachments
| File | Type | Posted |
|---|---|---|
| A25-008- SSJ_Redacted.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity