Asphalt Patching Poplar Bluff Ranger District
Awarded Award Notice Posted
- Solicitation number
- AG-64R4-S-17-0024
- Agency
- Forest Service Research Service Northern Research Station Forest Research Service, Department of Agriculture
- Awarded
- to ST Turman Contracting, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG64R4P170074 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Usda Forest Service Poplar Bluff Ranger District 1420 Maud Street Poplar Bluff, Missouri 63901, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: May 03, 2017 1:23 pm
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested.
Solicitation AG-64R4-S-17-0024 is issued as RFQ under FAR Part 13.
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-95
100% Small Business, NAICS 237310 small business size standard $36.50 Million.
Project Magnitude: Under $25,000.
Furnish all labor, equipment and materials to complete the following work:
The admin site asphalt patching area is approximately 552 SY. This area will be marked by the Forest Service. Contractor shall cut existing asphalt area as marked. Then area will be excavated 10 inches in depth and material disposed of off-site. Base rock shall be placed 6 inches in depth and in two lifts. Asphalt shall be placed 4 inches in depth and in two-lifts. Asphalt and Base rock finished elevations shall be constructed to provide drainage of surface to utilize existing drainage features. 48 hour notice must be given before constructions begins. Contractor shall provide all traffic control necessary to perform project. Care shall be taken not to damage existing pavement or structures.
Site Visit: A contractor evaluation of site is recommended. A pre-bid visit with Darren Morris; Transportation Engineer, can be scheduled.
FAR 52.212-1; 52.212-2; 52.212-3; 52.212-4, 52.212-5, and Sustainable Products and Services apply to this acquisition.
Quotes are due 5/17/17.
eMail submissions to dceaster@fs.fed.us
Attachments
| File | Type | Posted |
|---|---|---|
| AG-64R4-S-17-0024_SOLICITATION_R9_ORB_POPLAR_BLUFF.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity