Armed Forces Reserve Center Houston Phase 2 and BRAC Armed Forces Reserve Center East Houston, Houston, Texas

Award Notice Posted

Solicitation number
W912QR-08-R-0066
Agency
Awarded
to Spaw Glass Construction Corp
Set-aside
No set-aside

Opportunity facts

Contract number
W912QR-08-C-0052 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

Amendments 0003 and 0004 have been issued on 25 August 2008.

Update #6 ·

Amendment 0002 has been issued on 31 July 2008.

Update #5 ·

Amendment 0001 has been issued on 29 July 2008. The size standard of $31M is hereby changed to $33.5M.

Update #4 ·

Pre-proposal meeting is planned for August 13, 2008 at 8:30am Local Time. Participants are to meet in the Training Room of the Base Civil Engineering Building, Bldg #1256, Ellington Field Joint Reserve Base, Texas.

Update #3 ·

The options included in this solicitation have been revised. Phase 2: Option #1-OMAR Funded Items; Option #2-Landscaping on Entry Control Site; Option #3-Vehicle Holding Shed Building I, Associated Sitework and Design Fees; Option #4-Unheated Storage Building J, Associated Sitework and Design Fees; Option #5-Military Equipment Parking Asphalt Pavement (6,358 square yards) and Option #6-Two Coiling Doors and Translucent Window Panels on Entry Control Facility Building E. East Houston: Option #1-OMAR Funded Items; Option #2-Landscaping on Training Center Site and Option #3-Military Equipment Parking Asphalt Pavement (36,480 square yards).

Update #2 ·

Procurement will combine the Houston Phase 2 project and the BRAC East Houston, Houston, Texas into one project. Phase 2: Construct Phase 2 of a multi-phased Armed Forces Reserve Center. The total project entails the construction of a Battle Projection Center (BPC), Vehicle Maintenance Facility (VMF), Entry Control Point (ECP), unheated storage building, and organizational parking. Phase 2 consists primarily of the BPC and VMF requirement. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, HVAC systems, plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Air Conditioning (Estimated 723 Tons). The following options will be included: Option #1-Landscaping; Option #2-USAR Unheated Storage; Option #3-USNR Vehicle Holding Shed; Option #4-Pave MEP with Asphalt; and Option #5-OVHD Door for Truck Inspection. East Houston: Construct an Armed Forces Reserve Center (AFRC). Primary facilities include a Multi-use Classroom, Organizational Maintenance Shop (OMS), unheated storage building. Buildings will be of permanent construction with HVAC systems, plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Force protection measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Air Conditioning (Estimated 524 Tons). The following option will be included: Option #1-Pave MEP with Asphalt. This project is design/build. This solicitation will be awarded using the Best Value Tradeoff Process. The estimated award date is September 2008. Proposals will be evaluated based on the following technical factors: Experience, Past Performance, Technical Proposal Information, Management Plan and Subcontracting Narrative. All evaluation factors, other than cost or price, when combined, are equal to cost or price. The estimated price range is between $25,000,000 and $100,000,000. NAICS is 236220. Contract duration is 730 calendar days. Approximate issue date is July 25, 2008 and approximate closing date is September 4, 2008. Pre-proposal meeting is planned for August 13, 2008. Exact time and location will be noted in the solicitation. This announcement serves as the advance notice for this project. Solicitation and amendments will be available from the FedBizOpps website by download only. Note: This is a Full and Open Procurement; however, in accordance with Federal Acquisition Regulation 19.1307(b), this project requires the HUBZone 10% price evaluation preference.

Update #1 ·

Procurement will combine the Houston Phase 2 project and the BRAC East Houston into one project. Phase 2: Construct Phase 2 of a multi-phased Armed Forces Reserve Center. The total project entails the construction of a Battle Projection Center (BPC), Vehicle Maintenance Facility (VMF), Entry Control Point (ECP), unheated storage building, and organizational parking. Phase 2 consists primarily of the BPC and VMF requirement. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, HVAC systems, plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Air Conditioning (Estimated 723 Tons). The following options will be included: Option #1-Landscaping; Option #2-USAR Unheated Storage; Option #3-USNR Vehicle Holding Shed; Option #4-Pave MEP with Asphalt; and Option #5-OVHD Door for Truck Inspection. East Houston: Construct an Armed Forces Reserve Center (AFRC). Primary facilities include a Multi-use Classroom, Organizational Maintenance Shop (OMS), unheated storage building. Buildings will be of permanent construction with HVAC systems, plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Force protection measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Air Conditioning (Estimated 524 Tons). The following option will be included: Option #1-Pave MEP with Asphalt. This project is design/build. This solicitation will be awarded using the Best Value Tradeoff Process. The estimated award date is September 2008. Proposals will be evaluated based on the following technical factors: Experience, Past Performance, Technical Proposal Information, Management Plan and Subcontracting Narrative. All evaluation factors, other than cost or price, when combined, are equal to cost or price. The estimated price range is between $25,000,000 and $100,000,000. NAICS is 236220. Contract duration is 730 calendar days. Approximate issue date is July 25, 2008 and approximate closing date is September 4, 2008. Pre-proposal meeting is planned for August 13, 2008. Exact time and location will be noted in the solicitation. This announcement serves as the advance notice for this project. Solicitation and amendments will be available from the FedBizOpps website by download only. Note: This is a Full and Open Procurement; however, in accordance with Federal Acquisition Regulation 19.1307(b), this project requires the HUBZone 10% price evaluation preference.