Appleton Marine OEM Long Lead Time Material (LLTM) for USNS LEWIS & CLARK (T-AKE 1)

Award Notice Posted

Solicitation number
N32205-18-Q-4851
Agency
Awarded
to Appleton Marine Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
N3220518P4859 Federal contract award
NAICS code
332312 Fabricated Structural Metal Manufacturing
PSC
Not on record
Place of performance
Norfolk, Virginia 23511, United States

Notice details come from SAM.gov. Updated .

Notice text

 

Military Sealift Command Synopsis


 


•1.     Action Code: Draft Award


•2.     Date: 05 Oct 2017


•3.     Year:  Fiscal Year 2018


•4.     Contracting Office Zip Code: 23511


•5.     Classification Code: FSC: J020; NAICS: 811310


•6.     Contracting Office Address: Military Sealift Command, SP-64 471 C Street, Norfolk, VA 23511


•7.     Subject: Pre-solicitation/Synopsis Purchase Appleton Marine OEM Long Lead Time Material (LLTM) for USNS LEWIS & CLARK (T-AKE 1) Regular Overhaul and Dry Docking Repair from 1 May to 02 August 2018.


•8.     Proposed Solicitation Number: N32205-18-Q-4851


•9.     Closing Response Date: 20 Oct 2015, 10:00 am, Eastern time, Norfolk, Virginia


•10.  Contact Point or Contracting Officer: Mrs. Alvinia R Jenkins, (757) 443-5881, Alvinia.jenkins@navy.mil


•11.  Contract Solicitation Number: N32205-18-Q-4851


•12.  Contract Award Dollar Amount: TBD


•13.  Contract Line Item Number: TBD


•14.  Contract Award Date: NLT 31 Oct 2017


•15.  Contractor: Appleton Marine, Inc.


•16.  Description: THIS IS A SYNOPSIS NOTICE ONLY. This is not a solicitation or request for quotes. Military Sealift Command intends to award a firm-fixed price contract on a sole source basis to Appleton Marine, Inc., to provide OEM long lead time material required for the overhaul of the Appleton Cargo Crane Booms during the Regular Overhaul and Dry Docking Repair onboard the USNS LEWIS & CLARK (T-AKE 1). 


 


•a.     This procurement is a FAR 12 acquisition being conducted under FAR Subpart 13.5.  Accordingly, simplified acquisitions procedures apply. 


•b.     Unit of Issue: Each


•c.     Place of Contract Performance: Norfolk, VA


•d.     Delivery schedule: 03/01/2018.


 


•17.  The solicitation will not be made available on the FBO website, www.FBO.gov. Contact the Contract Specialist Alvinia.murray@navy.mil, (757) 443-5881.


•18.  Set-aside Status: None


 