AOC P-3 Engine HRD Overhaul Requisition NOAAP30209

Award Notice Posted

Solicitation number
1333MK24Q0049
Agency
Awarded
to HRD Aero Systems, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
1333MK24P0070 Federal contract award

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Department of Commerce's National Oceanic and Atmospheric Administration (NOAA) awarded a contract to HRD AERO SYSTEMS, INC. for the overhaul and hydro testing of four High Rate Discharge (HRD) bottles on NOAA's WP-3D Orion aircraft. The contract, valued at $28,572, requires the contractor to overhaul the HRD bottles, replace any necessary parts with factory new OEM or FAA-PMA equivalent components, and return the bottles to service in accordance with applicable maintenance manuals. The overhaul work is necessary to maintain the airworthiness of NOAA's aircraft in support of hurricane surveillance and scientific research operations.

Notice text

The U.S. Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA), Aircraft Operations Center (AOC) at Lakeland Linder International Airport (KLAL), Lakeland, FL operates two WP-3D Orions, a Gulfstream GIV-SP, four De Havilland DHC-6-300 Twin Otters, and two Beechcraft King Air 350CERs in support of hurricane surveillance and scientific research.

In an effort to keep NOAA’s WP-3D aircraft airworthy in accordance with the approved maintenance plan the aircraft Fire Extinguisher System requires periodic maintenance. Specifically, the High Rate Discharge (HRD) Bottle requires overhaul and hydro testing every five years. This requirement cannot be waived. Currently, all four of aircraft N42RF’s engine HRD bottles are due for overhaul or replacement. Since the cost of overhaul is much cheaper ($7.2K ea.) than replacing the bottles ($35K ea.) it is desirable to have them overhauled.

The overhaul must include hydro static testing, refilling the bottle and certifying the work performed. All work must be performed in accordance with applicable maintenance manuals. If the HRD bottle is overhauled the contractor shall replace all parts necessary to accomplish the overhaul with factory new OEM parts or FAA-PMA equivalent components and return the HRD bottle to service. The contractor shall provide all replacement parts, materials, and consumables.
The work performed shall be documented on an FAA 8130-3, Certificate of Conformance or equivalent. All work records and documents shall accompany each HRD bottle during shipment.

The cost of shipping the four HRD bottles to the selected contractor facility shall be the responsibility of the Government. Shipping to return the HRD bottles to AOC’s aircraft support vendor shall be the responsibility of the Government.
Awarded contract 1333MK24P0070 to HRD AERO SYSTEMS, INC. for 28572 on 2024-04-08.

Notice history

Notice Type Posted
This notice Award Award Notice
AOC P-3 Engine HRD Overhaul Requisition NOAAP30209 Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity