Amendment 0006: update, section H clause 52. 211-11, liquidated damages***

Award Notice Posted

Solicitation number
W91CRB-15-R-0019
Agency
Awarded
to N2 Imaging Systems, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W91CRB16D0013 Federal IDV award
NAICS code
333314 Optical Instrument and Lens Manufacturing
PSC
Not on record
Place of performance
ACC-APG - Aberdeen Division D Attn: Amssb-ACC-A, 4118 Susquehanna Avenue Aberdeen Proving Ground MD 21005 US
More information

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

***AMENDMENT 0006: UPDATES, SECTION H CLAUSE 52.211-11, LIQUIDATED DAMAGES***

Amendment 0006 updates the Solicitation, Section H Clause 52.211-11: Liquidated Damages, to clarify the cap on consideration for delinquent deliveries and to modify the fielding factor table (see summary of changes, Solicitation Amendment 0006)

***END AMENDMENT 0006***

***AMENDMENT 0005: QUESTIONS AND ANSWERS THROUGH 4 AUGUST 2015, UPDATES***

Amendment 0005 updates Solicitation documents, changes the date for Offeror Oral Presentations to 19 August 2015, provides Government responses to industry questions recieved as of 4 August 2015, and extends the proposal due date to 17 August 2015 (see summary of changes, SF 33). Questions received after 4 August 2015 shall be addressed in a subsequent amendment.

Solicitation Documentation Changes:

Standard Form 33 (SF33), Section 9 response time and date changed to 12:00PM (noon) Eastern Standard, 17 August 2015.

Section J, Attachment #1- FWS-S Purchase Description (PD), Table 4.6-1 Inspection Matrix, has been revised to clarify responsibility for verification of the Weapon/ FWS-S Accuracy requirement (see response to Question #56 for details). An answer to question #56 was deferred in the previous amendment, so is answered via Amendment 0005.

NOTE: The revised Attachment #1- FWS-S PD dated 4 August 2015 is a restricted distribution attachment. The revised FWS-S PD shall be provided to offerors via AMRDEC SAFE distribution. To request the updated FWS-S PD, contact administrative POC Mr. Steven Lopez: email Steen.E.Lopez3ctr@mail.mil and CC Contract Specialist Mr. Andrew Mitchell: email Andrew.C.Mitchell1.civ@mail.mil.

Offeror Oral Presentations (see Section L, Paragraph 1.1.3) will be held 19 August 2015 at Fort Belvoir, VA. Once proposals have been received on 17 August 2015, the Contracting Office will contact each offeror and provide the specific time and location for their oral presentation.

***END AMENDMENT 0005***

***AMENDMENT 0004: QUESTIONS AND ANSWERS THROUGH 28 JULY 2015, UPDATES***

Amendment 0004 updates solicitation documentation and provides Government responses to questions received as of 28 July 2015. Questions received after 28 July 2015 date shall be addressed in a subsequent amendment.

Solicitation Documentation Changes:

Section H, Clause 52.211-11 LIQUIDATED DAMAGES has been updated for clarification (see response to Question #51 for details).

Section J, Attachment #1, FWS-S Purchase Description has been revised to remove Para 3.7.9.3 Blowing Rain (Objective) from the body of the Purchase Description and from Table 4.6-1 to eliminate redundancy. The test methodology for paragraph 3.7.9.1 Rain, is governed by MIL-STD-810G with Change 1, Method 506.6, Procedure I, which calls out both wind and rain conditions for the testing. A separate blowing rain test would be redundant.

Section J, Attachment #1, FWS-S Purchase Description, Table 4.6-2 has been revised to include Display Brightness row, which was inadvertently left out of the table.

Section J, Attachment #1, FWS-S Purchase Description, Para 3.7.17 and Tables 3.7.17-1, 4.6-1 and 4.6-3 have been modified to clarify live fire testing requirements (see responses to Question #42 and #43 for details).

Section J, Attachment #1, FWS-S Purchase Description has been revised to delete Paragraph 3.10.25 Stand-Alone Mode (see response to Question #54 for details).

NOTE: The revised Attachment #1 - FWS Product Description dated 29 July 2015 is a restricted distribution attachment. The revised FWS-S PD shall be provided to offerors via AMDREC SAFE distribution. Contact admin POC at steven.e.lopez3.ctr@mail.mil and cc contracting specialist at andrew.c.mitchell1.civ@mail.mil to request the updated FWS-S Product Description.

Section J, Attachment #7, Total Evaluated Price (TEP) Matrix, has been updated to correct a formula error (see response to Question #50 for details). The updated

Attachment#7 will be posted to ASFI.

Section L, Paragraph 1.1.1.1.2 is amended to add the following:

quote mark All Offerors are advised that ASSIST2Industry has been updated and it is now the responsibility of PRIME Contractors to establish accounts for their SUBCONTRACTORS to respond to Government ENs. A separate area within ASSIST2Industry has been created to allow authorized Subcontractor POCs to upload proposal files only. Subcontractors will not be able to access any other information on the ASSIST2Industry website (e.g. Questions/Evaluation Notices, Responses, etc.). Once a Subcontractor has been added, they will receive a user ID (e.g. subcontractor0001) and password (an initial password) that will be sent via two separate system generated e-mails. A Subcontractor will have one user ID for all PRIMES and solicitation responses, i.e. if you are a Subcontractor to multiple Prime Contractors and multiple solicitation responses, you will only have one user ID. Once an account has been established for the Subcontractor, go to https://ASSIST2Industry.army.mil access the account. Prime Contractors will only be able to see the number of files submitted by their Subcontractors; but, will be UNABLE TO VIEW the Subcontractor's files.

NOTE: Both Prime Contractors and Subcontractors are instructed to review the ASSIST2Industry User's Guide, located under the quote mark Getting Started quote mark tab on the website. The guide has been updated and provides step by step instructions on how to perform functions and navigate the website.

Offerors can contact the ASSIST2Industry Helpdesk via e-mail at usarmy.jbmdl.acc.list.vce-helpdesk@mail.mil or by telephone at (609) 562-5988 or (609) 562-7050 for any technical assistance that may be needed. quote mark

Section M, Para 1.3.3.1.1.1 has been corrected to clarify that the objective for FWS-S Target Recognition (Range) is 2,200 meters, as stated in Table M-1 (see response to Question #45 for details)

***END AMENDMENT 0004***

***AMENDMENT 0003: QUESTIONS AND ANSWERS THROUGH 21 JULY 2015, UPDATES***

Amendment 0003 updates Solicitation Documentation (Section L paragraph 1.1.2.3, Purchase Description) and clarifies that the proposal due date is 10 August 2015; the Solicitation is the controlling document with regard to proposal due date(s). In addition, Amendment 0003 provides Government responses to industry questions received before 21 July 2015; questions received after 21 July 2015 shall be answered in a subsequent Amendment.

***END AMENDMENT 0003***

***AMENDMENT 0002: QUESTIONS AND ANSWERS THROUGH 14 JULY 2015, UPDATES***

Amendment 0002 provides an updated proposal due date (12:00PM NOON Eastern Standard, 10 August 2015), updates solicitation documentation (Sections C, L and M), and answers questions submitted/ received prior to 14 July 2015. Questions receive after 14 July 2015 shall be answered in a subsequent amendment.

***END AMENDMENT 0002***

***AMENDMENT 0001: ADD SOLICITATION DOCUMENT VIA ATTACHMENT***

Amendment 0001 uploads Solicitation W91CRB-15-R-0019 via attachment

***END AMENDMENT 0001***

ORIGINAL
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

This is a combined Synopsis/ Solicitation, prepared in accordance with Federal Acquisition Regulations, publicizing of contract actions (Part 5). This announcement constitutes the only solicitation; proposals are requested, and a written solicitation shall not be issued.

Solicitation W91CRB-15-R-0019 is for the procurement of Family of Weapon Sights- Sniper (FWS-S). This is NOT a commercial-item solicitation.

The Army Contracting Center- Aberdeen Proving Ground (ACC APG) has a requirement for the Family of Weapon Sights- Sniper (FWS-S). The FWS-S shall be mounted in-line with the Sniper's day sight, enhancing the Sniper's ability to engage targets accurately, in all light levels, and limited visibility scenarios. The FWS-S will be a critical enabler that will allow the Sniper to detect, observe, and engage targets with minimal or no interruption or impact on the Sniper's normal daylight tactics. The FWS-S will be the first clip-on thermal sight specifically developed and fielded for the Sniper Community by the U.S. Army.

This procurement shall be a single award, five (5) year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract, to be executed in three (3) phases.

Phase 1 is the initial award contract, to design, build, and test Engineering and Manufacturing Development (EMD) test articles. Phase 1 shall be a Cost-Plus Fixed-Fee (CPFF) contract type.

Phase 2 consists of delivery orders to design, build, and test Low Rate Initial Production (LRIP) systems. Phase 2 shall be a Firm-Fixed Price (FFP) Contract Type.

Phase 3 consists of delivery orders to build and deliver Full Rate Production (RFP) systems. Phase 3 shall be a Firm-Fixed Price (FFP) Contract Type.

The minimum guarantee under this contract is $2M. The total maximum quantity under this potential contract award shall be 5,375 systems, to include all orders.

The following Attachments (Section J in the attached Solicitation Document) have restricted distribution and shall not be attached to this ASFI release.

Attachment 1- FWS-S Product Description
Attachment 3- FWS-S Sample Hardware Offeror Measured Data Matrix
Attachment 6- FWS-S Security Classification Guide
Attachment 10- Mount Assembly, Drawing A3301511, Rev.B
Attachment 19- NV Image J Instructions
Attachment 20- NV ImageJ-win32-1.47a (zip file)
Attachment 21- NV ImageJ-wind64-1.47a (zip file)
Attachment 24- Interface Control Document (ICD) for the Small Tactical Optical Rifle
Mounted micro Laser Range Finder (STORM mLRF)

All requests for the restricted distribution of Section J attachment listed above shall be made to the administrative Point of Contact (POC), Mr. Steven Lopez: e-mail Steven.E.Lopez3.ctr@mail.mil and carbon copy (CC) the Contract Specialist, Mr. Andrew Mitchell: e-mail Andrew.C.Mitchell1.civ@mail.mil.

Interested vendors shall include their company name, CAGE Code, business unit(s) and address(es), primary POC phone number, and primary POC e-mail address in this request for the restricted Section J Documents.

The Government shall provide all restricted documents via the Army Missile Research, Development, and Engineering Command Safe Access File Exchange (AMRDEC SAFE).

Recipients shall:

1. Read and comply with distribution markings
2. Direct all requests for distribution to other parties to the Contract Specialist:

e-mail Andrew.C.Mitchell1.civ@mail.mil and cc Contracting Officer Victoria
Watkins at Victoria.M.Watkins.civ@mail.mil

3. Destroy the documents once they are no longer required to support this
solicitation.

Recipients shall NOT:

1. Redistribute the documentation outside their company/organization, to include
other subsidiaries within the corporate structure.

All questions in response to this solicitation, including questions on technical documents, attachments and exhibits, shall be directed to the Contract Specialist via the e-mail address Andrew.C.Mitchell1.civ@mail.mil; cc the Contracting Officer, email victoria.m.watkins.civ@mail.mil.

Update #6 ·

***AMENDMENT 0005: QUESTIONS AND ANSWERS THROUGH 4 AUGUST 2015, UPDATES***

Amendment 0005 updates Solicitation documents, changes the date for Offeror Oral Presentations to 19 August 2015, provides Government responses to industry questions recieved as of 4 August 2015, and extends the proposal due date to 17 August 2015 (see summary of changes, SF 33). Questions received after 4 August 2015 shall be addressed in a subsequent amendment.

Solicitation Documentation Changes:

Standard Form 33 (SF33), Section 9 response time and date changed to 12:00PM (noon) Eastern Standard, 17 August 2015.

Section J, Attachment #1- FWS-S Purchase Description (PD), Table 4.6-1 Inspection Matrix, has been revised to clarify responsibility for verification of the Weapon/ FWS-S Accuracy requirement (see response to Question #56 for details). An answer to question #56 was deferred in the previous amendment, so is answered via Amendment 0005.

NOTE: The revised Attachment #1- FWS-S PD dated 4 August 2015 is a restricted distribution attachment. The revised FWS-S PD shall be provided to offerors via AMRDEC SAFE distribution. To request the updated FWS-S PD, contact administrative POC Mr. Steven Lopez: email Steen.E.Lopez3ctr@mail.mil and CC Contract Specialist Mr. Andrew Mitchell: email Andrew.C.Mitchell1.civ@mail.mil.

Offeror Oral Presentations (see Section L, Paragraph 1.1.3) will be held 19 August 2015 at Fort Belvoir, VA. Once proposals have been received on 17 August 2015, the Contracting Office will contact each offeror and provide the specific time and location for their oral presentation.

***END AMENDMENT 0005***

***AMENDMENT 0004: QUESTIONS AND ANSWERS THROUGH 28 JULY 2015, UPDATES***

Amendment 0004 updates solicitation documentation and provides Government responses to questions received as of 28 July 2015. Questions received after 28 July 2015 date shall be addressed in a subsequent amendment.

Solicitation Documentation Changes:

Section H, Clause 52.211-11 LIQUIDATED DAMAGES has been updated for clarification (see response to Question #51 for details).

Section J, Attachment #1, FWS-S Purchase Description has been revised to remove Para 3.7.9.3 Blowing Rain (Objective) from the body of the Purchase Description and from Table 4.6-1 to eliminate redundancy. The test methodology for paragraph 3.7.9.1 Rain, is governed by MIL-STD-810G with Change 1, Method 506.6, Procedure I, which calls out both wind and rain conditions for the testing. A separate blowing rain test would be redundant.

Section J, Attachment #1, FWS-S Purchase Description, Table 4.6-2 has been revised to include Display Brightness row, which was inadvertently left out of the table.

Section J, Attachment #1, FWS-S Purchase Description, Para 3.7.17 and Tables 3.7.17-1, 4.6-1 and 4.6-3 have been modified to clarify live fire testing requirements (see responses to Question #42 and #43 for details).

Section J, Attachment #1, FWS-S Purchase Description has been revised to delete Paragraph 3.10.25 Stand-Alone Mode (see response to Question #54 for details).

NOTE: The revised Attachment #1 - FWS Product Description dated 29 July 2015 is a restricted distribution attachment. The revised FWS-S PD shall be provided to offerors via AMDREC SAFE distribution. Contact admin POC at steven.e.lopez3.ctr@mail.mil and cc contracting specialist at andrew.c.mitchell1.civ@mail.mil to request the updated FWS-S Product Description.

Section J, Attachment #7, Total Evaluated Price (TEP) Matrix, has been updated to correct a formula error (see response to Question #50 for details). The updated

Attachment#7 will be posted to ASFI.

Section L, Paragraph 1.1.1.1.2 is amended to add the following:

quote mark All Offerors are advised that ASSIST2Industry has been updated and it is now the responsibility of PRIME Contractors to establish accounts for their SUBCONTRACTORS to respond to Government ENs. A separate area within ASSIST2Industry has been created to allow authorized Subcontractor POCs to upload proposal files only. Subcontractors will not be able to access any other information on the ASSIST2Industry website (e.g. Questions/Evaluation Notices, Responses, etc.). Once a Subcontractor has been added, they will receive a user ID (e.g. subcontractor0001) and password (an initial password) that will be sent via two separate system generated e-mails. A Subcontractor will have one user ID for all PRIMES and solicitation responses, i.e. if you are a Subcontractor to multiple Prime Contractors and multiple solicitation responses, you will only have one user ID. Once an account has been established for the Subcontractor, go to https://ASSIST2Industry.army.mil access the account. Prime Contractors will only be able to see the number of files submitted by their Subcontractors; but, will be UNABLE TO VIEW the Subcontractor's files.

NOTE: Both Prime Contractors and Subcontractors are instructed to review the ASSIST2Industry User's Guide, located under the quote mark Getting Started quote mark tab on the website. The guide has been updated and provides step by step instructions on how to perform functions and navigate the website.

Offerors can contact the ASSIST2Industry Helpdesk via e-mail at usarmy.jbmdl.acc.list.vce-helpdesk@mail.mil or by telephone at (609) 562-5988 or (609) 562-7050 for any technical assistance that may be needed. quote mark

Section M, Para 1.3.3.1.1.1 has been corrected to clarify that the objective for FWS-S Target Recognition (Range) is 2,200 meters, as stated in Table M-1 (see response to Question #45 for details)

***END AMENDMENT 0004***

***AMENDMENT 0003: QUESTIONS AND ANSWERS THROUGH 21 JULY 2015, UPDATES***

Amendment 0003 updates Solicitation Documentation (Section L paragraph 1.1.2.3, Purchase Description) and clarifies that the proposal due date is 10 August 2015; the Solicitation is the controlling document with regard to proposal due date(s). In addition, Amendment 0003 provides Government responses to industry questions received before 21 July 2015; questions received after 21 July 2015 shall be answered in a subsequent Amendment.

***END AMENDMENT 0003***

***AMENDMENT 0002: QUESTIONS AND ANSWERS THROUGH 14 JULY 2015, UPDATES***

Amendment 0002 provides an updated proposal due date (12:00PM NOON Eastern Standard, 10 August 2015), updates solicitation documentation (Sections C, L and M), and answers questions submitted/ received prior to 14 July 2015. Questions receive after 14 July 2015 shall be answered in a subsequent amendment.

***END AMENDMENT 0002***

***AMENDMENT 0001: ADD SOLICITATION DOCUMENT VIA ATTACHMENT***

Amendment 0001 uploads Solicitation W91CRB-15-R-0019 via attachment

***END AMENDMENT 0001***

ORIGINAL
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

This is a combined Synopsis/ Solicitation, prepared in accordance with Federal Acquisition Regulations, publicizing of contract actions (Part 5). This announcement constitutes the only solicitation; proposals are requested, and a written solicitation shall not be issued.

Solicitation W91CRB-15-R-0019 is for the procurement of Family of Weapon Sights- Sniper (FWS-S). This is NOT a commercial-item solicitation.

The Army Contracting Center- Aberdeen Proving Ground (ACC APG) has a requirement for the Family of Weapon Sights- Sniper (FWS-S). The FWS-S shall be mounted in-line with the Sniper's day sight, enhancing the Sniper's ability to engage targets accurately, in all light levels, and limited visibility scenarios. The FWS-S will be a critical enabler that will allow the Sniper to detect, observe, and engage targets with minimal or no interruption or impact on the Sniper's normal daylight tactics. The FWS-S will be the first clip-on thermal sight specifically developed and fielded for the Sniper Community by the U.S. Army.

This procurement shall be a single award, five (5) year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract, to be executed in three (3) phases.

Phase 1 is the initial award contract, to design, build, and test Engineering and Manufacturing Development (EMD) test articles. Phase 1 shall be a Cost-Plus Fixed-Fee (CPFF) contract type.

Phase 2 consists of delivery orders to design, build, and test Low Rate Initial Production (LRIP) systems. Phase 2 shall be a Firm-Fixed Price (FFP) Contract Type.

Phase 3 consists of delivery orders to build and deliver Full Rate Production (RFP) systems. Phase 3 shall be a Firm-Fixed Price (FFP) Contract Type.

The minimum guarantee under this contract is $2M. The total maximum quantity under this potential contract award shall be 5,375 systems, to include all orders.

The following Attachments (Section J in the attached Solicitation Document) have restricted distribution and shall not be attached to this ASFI release.

Attachment 1- FWS-S Product Description
Attachment 3- FWS-S Sample Hardware Offeror Measured Data Matrix
Attachment 6- FWS-S Security Classification Guide
Attachment 10- Mount Assembly, Drawing A3301511, Rev.B
Attachment 19- NV Image J Instructions
Attachment 20- NV ImageJ-win32-1.47a (zip file)
Attachment 21- NV ImageJ-wind64-1.47a (zip file)
Attachment 24- Interface Control Document (ICD) for the Small Tactical Optical Rifle
Mounted micro Laser Range Finder (STORM mLRF)

All requests for the restricted distribution of Section J attachment listed above shall be made to the administrative Point of Contact (POC), Mr. Steven Lopez: e-mail Steven.E.Lopez3.ctr@mail.mil and carbon copy (CC) the Contract Specialist, Mr. Andrew Mitchell: e-mail Andrew.C.Mitchell1.civ@mail.mil.

Interested vendors shall include their company name, CAGE Code, business unit(s) and address(es), primary POC phone number, and primary POC e-mail address in this request for the restricted Section J Documents.

The Government shall provide all restricted documents via the Army Missile Research, Development, and Engineering Command Safe Access File Exchange (AMRDEC SAFE).

Recipients shall:

1. Read and comply with distribution markings
2. Direct all requests for distribution to other parties to the Contract Specialist:

e-mail Andrew.C.Mitchell1.civ@mail.mil and cc Contracting Officer Victoria
Watkins at Victoria.M.Watkins.civ@mail.mil

3. Destroy the documents once they are no longer required to support this
solicitation.

Recipients shall NOT:

1. Redistribute the documentation outside their company/organization, to include
other subsidiaries within the corporate structure.

All questions in response to this solicitation, including questions on technical documents, attachments and exhibits, shall be directed to the Contract Specialist via the e-mail address Andrew.C.Mitchell1.civ@mail.mil; cc the Contracting Officer, email victoria.m.watkins.civ@mail.mil.

Update #5 ·

***AMENDMENT 0004: QUESTIONS AND ANSWERS THROUGH 28 JULY 2015, UPDATES***

Amendment 0004 updates solicitation documentation and provides Government responses to questions received as of 28 July 2015. Questions received after 28 July 2015 date shall be addressed in a subsequent amendment.

Solicitation Documentation Changes:

Section H, Clause 52.211-11 LIQUIDATED DAMAGES has been updated for clarification (see response to Question #51 for details).

Section J, Attachment #1, FWS-S Purchase Description has been revised to remove Para 3.7.9.3 Blowing Rain (Objective) from the body of the Purchase Description and from Table 4.6-1 to eliminate redundancy. The test methodology for paragraph 3.7.9.1 Rain, is governed by MIL-STD-810G with Change 1, Method 506.6, Procedure I, which calls out both wind and rain conditions for the testing. A separate blowing rain test would be redundant.

Section J, Attachment #1, FWS-S Purchase Description, Table 4.6-2 has been revised to include Display Brightness row, which was inadvertently left out of the table.

Section J, Attachment #1, FWS-S Purchase Description, Para 3.7.17 and Tables 3.7.17-1, 4.6-1 and 4.6-3 have been modified to clarify live fire testing requirements (see responses to Question #42 and #43 for details).

Section J, Attachment #1, FWS-S Purchase Description has been revised to delete Paragraph 3.10.25 Stand-Alone Mode (see response to Question #54 for details).

NOTE: The revised Attachment #1 - FWS Product Description dated 29 July 2015 is a restricted distribution attachment. The revised FWS-S PD shall be provided to offerors via AMDREC SAFE distribution. Contact admin POC at steven.e.lopez3.ctr@mail.mil and cc contracting specialist at andrew.c.mitchell1.civ@mail.mil to request the updated FWS-S Product Description.

Section J, Attachment #7, Total Evaluated Price (TEP) Matrix, has been updated to correct a formula error (see response to Question #50 for details). The updated

Attachment#7 will be posted to ASFI.

Section L, Paragraph 1.1.1.1.2 is amended to add the following:

quote mark All Offerors are advised that ASSIST2Industry has been updated and it is now the responsibility of PRIME Contractors to establish accounts for their SUBCONTRACTORS to respond to Government ENs. A separate area within ASSIST2Industry has been created to allow authorized Subcontractor POCs to upload proposal files only. Subcontractors will not be able to access any other information on the ASSIST2Industry website (e.g. Questions/Evaluation Notices, Responses, etc.). Once a Subcontractor has been added, they will receive a user ID (e.g. subcontractor0001) and password (an initial password) that will be sent via two separate system generated e-mails. A Subcontractor will have one user ID for all PRIMES and solicitation responses, i.e. if you are a Subcontractor to multiple Prime Contractors and multiple solicitation responses, you will only have one user ID. Once an account has been established for the Subcontractor, go to https://ASSIST2Industry.army.mil access the account. Prime Contractors will only be able to see the number of files submitted by their Subcontractors; but, will be UNABLE TO VIEW the Subcontractor's files.

NOTE: Both Prime Contractors and Subcontractors are instructed to review the ASSIST2Industry User's Guide, located under the quote mark Getting Started quote mark tab on the website. The guide has been updated and provides step by step instructions on how to perform functions and navigate the website.

Offerors can contact the ASSIST2Industry Helpdesk via e-mail at usarmy.jbmdl.acc.list.vce-helpdesk@mail.mil or by telephone at (609) 562-5988 or (609) 562-7050 for any technical assistance that may be needed. quote mark

Section M, Para 1.3.3.1.1.1 has been corrected to clarify that the objective for FWS-S Target Recognition (Range) is 2,200 meters, as stated in Table M-1 (see response to Question #45 for details)

***END AMENDMENT 0004***

***AMENDMENT 0003: QUESTIONS AND ANSWERS THROUGH 21 JULY 2015, UPDATES***

Amendment 0003 updates Solicitation Documentation (Section L paragraph 1.1.2.3, Purchase Description) and clarifies that the proposal due date is 10 August 2015; the Solicitation is the controlling document with regard to proposal due date(s). In addition, Amendment 0003 provides Government responses to industry questions received before 21 July 2015; questions received after 21 July 2015 shall be answered in a subsequent Amendment.

***END AMENDMENT 0003***

***AMENDMENT 0002: QUESTIONS AND ANSWERS THROUGH 14 JULY 2015, UPDATES***

Amendment 0002 provides an updated proposal due date (12:00PM NOON Eastern Standard, 10 August 2015), updates solicitation documentation (Sections C, L and M), and answers questions submitted/ received prior to 14 July 2015. Questions receive after 14 July 2015 shall be answered in a subsequent amendment.

***END AMENDMENT 0002***

***AMENDMENT 0001: ADD SOLICITATION DOCUMENT VIA ATTACHMENT***

Amendment 0001 uploads Solicitation W91CRB-15-R-0019 via attachment

***END AMENDMENT 0001***

ORIGINAL
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

This is a combined Synopsis/ Solicitation, prepared in accordance with Federal Acquisition Regulations, publicizing of contract actions (Part 5). This announcement constitutes the only solicitation; proposals are requested, and a written solicitation shall not be issued.

Solicitation W91CRB-15-R-0019 is for the procurement of Family of Weapon Sights- Sniper (FWS-S). This is NOT a commercial-item solicitation.

The Army Contracting Center- Aberdeen Proving Ground (ACC APG) has a requirement for the Family of Weapon Sights- Sniper (FWS-S). The FWS-S shall be mounted in-line with the Sniper's day sight, enhancing the Sniper's ability to engage targets accurately, in all light levels, and limited visibility scenarios. The FWS-S will be a critical enabler that will allow the Sniper to detect, observe, and engage targets with minimal or no interruption or impact on the Sniper's normal daylight tactics. The FWS-S will be the first clip-on thermal sight specifically developed and fielded for the Sniper Community by the U.S. Army.

This procurement shall be a single award, five (5) year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract, to be executed in three (3) phases.

Phase 1 is the initial award contract, to design, build, and test Engineering and Manufacturing Development (EMD) test articles. Phase 1 shall be a Cost-Plus Fixed-Fee (CPFF) contract type.

Phase 2 consists of delivery orders to design, build, and test Low Rate Initial Production (LRIP) systems. Phase 2 shall be a Firm-Fixed Price (FFP) Contract Type.

Phase 3 consists of delivery orders to build and deliver Full Rate Production (RFP) systems. Phase 3 shall be a Firm-Fixed Price (FFP) Contract Type.

The minimum guarantee under this contract is $2M. The total maximum quantity under this potential contract award shall be 5,375 systems, to include all orders.

The following Attachments (Section J in the attached Solicitation Document) have restricted distribution and shall not be attached to this ASFI release.

Attachment 1- FWS-S Product Description
Attachment 3- FWS-S Sample Hardware Offeror Measured Data Matrix
Attachment 6- FWS-S Security Classification Guide
Attachment 10- Mount Assembly, Drawing A3301511, Rev.B
Attachment 19- NV Image J Instructions
Attachment 20- NV ImageJ-win32-1.47a (zip file)
Attachment 21- NV ImageJ-wind64-1.47a (zip file)
Attachment 24- Interface Control Document (ICD) for the Small Tactical Optical Rifle
Mounted micro Laser Range Finder (STORM mLRF)

All requests for the restricted distribution of Section J attachment listed above shall be made to the administrative Point of Contact (POC), Mr. Steven Lopez: e-mail Steven.E.Lopez3.ctr@mail.mil and carbon copy (CC) the Contract Specialist, Mr. Andrew Mitchell: e-mail Andrew.C.Mitchell1.civ@mail.mil.

Interested vendors shall include their company name, CAGE Code, business unit(s) and address(es), primary POC phone number, and primary POC e-mail address in this request for the restricted Section J Documents.

The Government shall provide all restricted documents via the Army Missile Research, Development, and Engineering Command Safe Access File Exchange (AMRDEC SAFE).

Recipients shall:

1. Read and comply with distribution markings
2. Direct all requests for distribution to other parties to the Contract Specialist:

e-mail Andrew.C.Mitchell1.civ@mail.mil and cc Contracting Officer Victoria
Watkins at Victoria.M.Watkins.civ@mail.mil

3. Destroy the documents once they are no longer required to support this
solicitation.

Recipients shall NOT:

1. Redistribute the documentation outside their company/organization, to include
other subsidiaries within the corporate structure.

All questions in response to this solicitation, including questions on technical documents, attachments and exhibits, shall be directed to the Contract Specialist via the e-mail address Andrew.C.Mitchell1.civ@mail.mil; cc the Contracting Officer, email victoria.m.watkins.civ@mail.mil.

Update #4 ·

***AMENDMENT 0003: QUESTIONS AND ANSWERS THROUGH 21 JULY 2015, UPDATES***

Amendment 0003 updates Solicitation Documentation (Section L paragraph 1.1.2.3, Purchase Description) and clarifies that the proposal due date is 10 August 2015; the Solicitation is the controlling document with regard to proposal due date(s). In addition, Amendment 0003 provides Government responses to industry questions received before 21 July 2015; questions received after 21 July 2015 shall be answered in a subsequent Amendment.

***END AMENDMENT 0003***

***AMENDMENT 0002: QUESTIONS AND ANSWERS THROUGH 14 JULY 2015, UPDATES***

Amendment 0002 provides an updated proposal due date (12:00PM NOON Eastern Standard, 10 August 2015), updates solicitation documentation (Sections C, L and M), and answers questions submitted/ received prior to 14 July 2015. Questions receive after 14 July 2015 shall be answered in a subsequent amendment.

***END AMENDMENT 0002***

***AMENDMENT 0001: ADD SOLICITATION DOCUMENT VIA ATTACHMENT***

Amendment 0001 uploads Solicitation W91CRB-15-R-0019 via attachment

***END AMENDMENT 0001***

ORIGINAL
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

This is a combined Synopsis/ Solicitation, prepared in accordance with Federal Acquisition Regulations, publicizing of contract actions (Part 5). This announcement constitutes the only solicitation; proposals are requested, and a written solicitation shall not be issued.

Solicitation W91CRB-15-R-0019 is for the procurement of Family of Weapon Sights- Sniper (FWS-S). This is NOT a commercial-item solicitation.

The Army Contracting Center- Aberdeen Proving Ground (ACC APG) has a requirement for the Family of Weapon Sights- Sniper (FWS-S). The FWS-S shall be mounted in-line with the Sniper's day sight, enhancing the Sniper's ability to engage targets accurately, in all light levels, and limited visibility scenarios. The FWS-S will be a critical enabler that will allow the Sniper to detect, observe, and engage targets with minimal or no interruption or impact on the Sniper's normal daylight tactics. The FWS-S will be the first clip-on thermal sight specifically developed and fielded for the Sniper Community by the U.S. Army.

This procurement shall be a single award, five (5) year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract, to be executed in three (3) phases.

Phase 1 is the initial award contract, to design, build, and test Engineering and Manufacturing Development (EMD) test articles. Phase 1 shall be a Cost-Plus Fixed-Fee (CPFF) contract type.

Phase 2 consists of delivery orders to design, build, and test Low Rate Initial Production (LRIP) systems. Phase 2 shall be a Firm-Fixed Price (FFP) Contract Type.

Phase 3 consists of delivery orders to build and deliver Full Rate Production (RFP) systems. Phase 3 shall be a Firm-Fixed Price (FFP) Contract Type.

The minimum guarantee under this contract is $2M. The total maximum quantity under this potential contract award shall be 5,375 systems, to include all orders.

The following Attachments (Section J in the attached Solicitation Document) have restricted distribution and shall not be attached to this ASFI release.

Attachment 1- FWS-S Product Description
Attachment 3- FWS-S Sample Hardware Offeror Measured Data Matrix
Attachment 6- FWS-S Security Classification Guide
Attachment 10- Mount Assembly, Drawing A3301511, Rev.B
Attachment 19- NV Image J Instructions
Attachment 20- NV ImageJ-win32-1.47a (zip file)
Attachment 21- NV ImageJ-wind64-1.47a (zip file)
Attachment 24- Interface Control Document (ICD) for the Small Tactical Optical Rifle
Mounted micro Laser Range Finder (STORM mLRF)

All requests for the restricted distribution of Section J attachment listed above shall be made to the administrative Point of Contact (POC), Mr. Steven Lopez: e-mail Steven.E.Lopez3.ctr@mail.mil and carbon copy (CC) the Contract Specialist, Mr. Andrew Mitchell: e-mail Andrew.C.Mitchell1.civ@mail.mil.

Interested vendors shall include their company name, CAGE Code, business unit(s) and address(es), primary POC phone number, and primary POC e-mail address in this request for the restricted Section J Documents.

The Government shall provide all restricted documents via the Army Missile Research, Development, and Engineering Command Safe Access File Exchange (AMRDEC SAFE).

Recipients shall:

1. Read and comply with distribution markings
2. Direct all requests for distribution to other parties to the Contract Specialist:

e-mail Andrew.C.Mitchell1.civ@mail.mil and cc Contracting Officer Victoria
Watkins at Victoria.M.Watkins.civ@mail.mil

3. Destroy the documents once they are no longer required to support this
solicitation.

Recipients shall NOT:

1. Redistribute the documentation outside their company/organization, to include
other subsidiaries within the corporate structure.

All questions in response to this solicitation, including questions on technical documents, attachments and exhibits, shall be directed to the Contract Specialist via the e-mail address Andrew.C.Mitchell1.civ@mail.mil; cc the Contracting Officer, email victoria.m.watkins.civ@mail.mil.

Update #3 ·

***AMENDMENT 0002: QUESTIONS AND ANSWERS THROUGH 14 JULY 2015, UPDATES***

Amendment 0002 provides an updated proposal due date (12:00PM NOON Eastern Standard, 14 August 2015), updates solicitation documentation (Sections C, L and M), and answers questions submitted/ received prior to 14 July 2015. Questions receive after 14 July 2015 shall be answered in a subsequent amendment.

***END AMENDMENT 0002***

***AMENDMENT 0001: ADD SOLICITATION DOCUMENT VIA ATTACHMENT***

Amendment 0001 uploads Solicitation W91CRB-15-R-0019 via attachment

***END AMENDMENT 0001***

ORIGINAL
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

This is a combined Synopsis/ Solicitation, prepared in accordance with Federal Acquisition Regulations, publicizing of contract actions (Part 5). This announcement constitutes the only solicitation; proposals are requested, and a written solicitation shall not be issued.

Solicitation W91CRB-15-R-0019 is for the procurement of Family of Weapon Sights- Sniper (FWS-S). This is NOT a commercial-item solicitation.

The Army Contracting Center- Aberdeen Proving Ground (ACC APG) has a requirement for the Family of Weapon Sights- Sniper (FWS-S). The FWS-S shall be mounted in-line with the Sniper's day sight, enhancing the Sniper's ability to engage targets accurately, in all light levels, and limited visibility scenarios. The FWS-S will be a critical enabler that will allow the Sniper to detect, observe, and engage targets with minimal or no interruption or impact on the Sniper's normal daylight tactics. The FWS-S will be the first clip-on thermal sight specifically developed and fielded for the Sniper Community by the U.S. Army.

This procurement shall be a single award, five (5) year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract, to be executed in three (3) phases.

Phase 1 is the initial award contract, to design, build, and test Engineering and Manufacturing Development (EMD) test articles. Phase 1 shall be a Cost-Plus Fixed-Fee (CPFF) contract type.

Phase 2 consists of delivery orders to design, build, and test Low Rate Initial Production (LRIP) systems. Phase 2 shall be a Firm-Fixed Price (FFP) Contract Type.

Phase 3 consists of delivery orders to build and deliver Full Rate Production (RFP) systems. Phase 3 shall be a Firm-Fixed Price (FFP) Contract Type.

The minimum guarantee under this contract is $2M. The total maximum quantity under this potential contract award shall be 5,375 systems, to include all orders.

The following Attachments (Section J in the attached Solicitation Document) have restricted distribution and shall not be attached to this ASFI release.

Attachment 1- FWS-S Product Description
Attachment 3- FWS-S Sample Hardware Offeror Measured Data Matrix
Attachment 6- FWS-S Security Classification Guide
Attachment 10- Mount Assembly, Drawing A3301511, Rev.B
Attachment 19- NV Image J Instructions
Attachment 20- NV ImageJ-win32-1.47a (zip file)
Attachment 21- NV ImageJ-wind64-1.47a (zip file)
Attachment 24- Interface Control Document (ICD) for the Small Tactical Optical Rifle
Mounted micro Laser Range Finder (STORM mLRF)

All requests for the restricted distribution of Section J attachment listed above shall be made to the administrative Point of Contact (POC), Mr. Steven Lopez: e-mail Steven.E.Lopez3.ctr@mail.mil and carbon copy (CC) the Contract Specialist, Mr. Andrew Mitchell: e-mail Andrew.C.Mitchell1.civ@mail.mil.

Interested vendors shall include their company name, CAGE Code, business unit(s) and address(es), primary POC phone number, and primary POC e-mail address in this request for the restricted Section J Documents.

The Government shall provide all restricted documents via the Army Missile Research, Development, and Engineering Command Safe Access File Exchange (AMRDEC SAFE).

Recipients shall:

1. Read and comply with distribution markings
2. Direct all requests for distribution to other parties to the Contract Specialist:

e-mail Andrew.C.Mitchell1.civ@mail.mil and cc Contracting Officer Victoria
Watkins at Victoria.M.Watkins.civ@mail.mil

3. Destroy the documents once they are no longer required to support this
solicitation.

Recipients shall NOT:

1. Redistribute the documentation outside their company/organization, to include
other subsidiaries within the corporate structure.

All questions in response to this solicitation, including questions on technical documents, attachments and exhibits, shall be directed to the Contract Specialist via the e-mail address Andrew.C.Mitchell1.civ@mail.mil; cc the Contracting Officer, email victoria.m.watkins.civ@mail.mil.

Update #2 ·

***AMENDMENT 0001: ADD SOLICITATION DOCUMENT VIA ATTACHMENT***

Amendment 0001 uploads Solicitation W91CRB-15-R-0019 via attachment

***END AMENDMENT 0001***

ORIGINAL
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

This is a combined Synopsis/ Solicitation, prepared in accordance with Federal Acquisition Regulations, publicizing of contract actions (Part 5). This announcement constitutes the only solicitation; proposals are requested, and a written solicitation shall not be issued.

Solicitation W91CRB-15-R-0019 is for the procurement of Family of Weapon Sights- Sniper (FWS-S). This is NOT a commercial-item solicitation.

The Army Contracting Center- Aberdeen Proving Ground (ACC APG) has a requirement for the Family of Weapon Sights- Sniper (FWS-S). The FWS-S shall be mounted in-line with the Sniper's day sight, enhancing the Sniper's ability to engage targets accurately, in all light levels, and limited visibility scenarios. The FWS-S will be a critical enabler that will allow the Sniper to detect, observe, and engage targets with minimal or no interruption or impact on the Sniper's normal daylight tactics. The FWS-S will be the first clip-on thermal sight specifically developed and fielded for the Sniper Community by the U.S. Army.

This procurement shall be a single award, five (5) year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract, to be executed in three (3) phases.

Phase 1 is the initial award contract, to design, build, and test Engineering and Manufacturing Development (EMD) test articles. Phase 1 shall be a Cost-Plus Fixed-Fee (CPFF) contract type.

Phase 2 consists of delivery orders to design, build, and test Low Rate Initial Production (LRIP) systems. Phase 2 shall be a Firm-Fixed Price (FFP) Contract Type.

Phase 3 consists of delivery orders to build and deliver Full Rate Production (RFP) systems. Phase 3 shall be a Firm-Fixed Price (FFP) Contract Type.

The minimum guarantee under this contract is $2M. The total maximum quantity under this potential contract award shall be 5,375 systems, to include all orders.

The following Attachments (Section J in the attached Solicitation Document) have restricted distribution and shall not be attached to this ASFI release.

Attachment 1- FWS-S Product Description
Attachment 3- FWS-S Sample Hardware Offeror Measured Data Matrix
Attachment 6- FWS-S Security Classification Guide
Attachment 10- Mount Assembly, Drawing A3301511, Rev.B
Attachment 19- NV Image J Instructions
Attachment 20- NV ImageJ-win32-1.47a (zip file)
Attachment 21- NV ImageJ-wind64-1.47a (zip file)
Attachment 24- Interface Control Document (ICD) for the Small Tactical Optical Rifle
Mounted micro Laser Range Finder (STORM mLRF)

All requests for the restricted distribution of Section J attachment listed above shall be made to the administrative Point of Contact (POC), Mr. Steven Lopez: e-mail Steven.E.Lopez3.ctr@mail.mil and carbon copy (CC) the Contract Specialist, Mr. Andrew Mitchell: e-mail Andrew.C.Mitchell1.civ@mail.mil.

Interested vendors shall include their company name, CAGE Code, business unit(s) and address(es), primary POC phone number, and primary POC e-mail address in this request for the restricted Section J Documents.

The Government shall provide all restricted documents via the Army Missile Research, Development, and Engineering Command Safe Access File Exchange (AMRDEC SAFE).

Recipients shall:

1. Read and comply with distribution markings
2. Direct all requests for distribution to other parties to the Contract Specialist:

e-mail Andrew.C.Mitchell1.civ@mail.mil and cc Contracting Officer Victoria
Watkins at Victoria.M.Watkins.civ@mail.mil

3. Destroy the documents once they are no longer required to support this
solicitation.

Recipients shall NOT:

1. Redistribute the documentation outside their company/organization, to include
other subsidiaries within the corporate structure.

All questions in response to this solicitation, including questions on technical documents, attachments and exhibits, shall be directed to the Contract Specialist via the e-mail address Andrew.C.Mitchell1.civ@mail.mil; cc the Contracting Officer, email victoria.m.watkins.civ@mail.mil.

Update #1 ·

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

This is a combined Synopsis/ Solicitation, prepared in accordance with Federal Acquisition Regulations, publicizing of contract actions (Part 5). This announcement constitutes the only solicitation; proposals are requested, and a written solicitation shall not be issued.

Solicitation W91CRB-15-R-0019 is for the procurement of Family of Weapon Sights- Sniper (FWS-S). This is NOT a commercial-item solicitation.

The Army Contracting Center- Aberdeen Proving Ground (ACC APG) has a requirement for the Family of Weapon Sights- Sniper (FWS-S). The FWS-S shall be mounted in-line with the Sniper's day sight, enhancing the Sniper's ability to engage targets accurately, in all light levels, and limited visibility scenarios. The FWS-S will be a critical enabler that will allow the Sniper to detect, observe, and engage targets with minimal or no interruption or impact on the Sniper's normal daylight tactics. The FWS-S will be the first clip-on thermal sight specifically developed and fielded for the Sniper Community by the U.S. Army.

This procurement shall be a single award, five (5) year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract, to be executed in three (3) phases.

Phase 1 is the initial award contract, to design, build, and test Engineering and Manufacturing Development (EMD) test articles. Phase 1 shall be a Cost-Plus Fixed-Fee (CPFF) contract type.

Phase 2 consists of delivery orders to design, build, and test Low Rate Initial Production (LRIP) systems. Phase 2 shall be a Firm-Fixed Price (FFP) Contract Type.

Phase 3 consists of delivery orders to build and deliver Full Rate Production (RFP) systems. Phase 3 shall be a Firm-Fixed Price (FFP) Contract Type.

The minimum guarantee under this contract is $2M. The total maximum quantity under this potential contract award shall be 5,375 systems, to include all orders.

The following Attachments (Section J in the attached Solicitation Document) have restricted distribution and shall not be attached to this ASFI release.

Attachment 1- FWS-S Product Description
Attachment 3- FWS-S Sample Hardware Offeror Measured Data Matrix
Attachment 6- FWS-S Security Classification Guide
Attachment 10- Mount Assembly, Drawing A3301511, Rev.B
Attachment 19- NV Image J Instructions
Attachment 20- NV ImageJ-win32-1.47a (zip file)
Attachment 21- NV ImageJ-wind64-1.47a (zip file)
Attachment 24- Interface Control Document (ICD) for the Small Tactical Optical Rifle
Mounted micro Laser Range Finder (STORM mLRF)

All requests for the restricted distribution of Section J attachment listed above shall be made to the administrative Point of Contact (POC), Mr. Steven Lopez: e-mail Steven.E.Lopez3.ctr@mail.mil and carbon copy (CC) the Contract Specialist, Mr. Andrew Mitchell: e-mail Andrew.C.Mitchell1.civ@mail.mil.

Interested vendors shall include their company name, CAGE Code, business unit(s) and address(es), primary POC phone number, and primary POC e-mail address in this request for the restricted Section J Documents.

The Government shall provide all restricted documents via the Army Missile Research, Development, and Engineering Command Safe Access File Exchange (AMRDEC SAFE).

Recipients shall:

1. Read and comply with distribution markings
2. Direct all requests for distribution to other parties to the Contract Specialist:

e-mail Andrew.C.Mitchell1.civ@mail.mil and cc Contracting Officer Victoria
Watkins at Victoria.M.Watkins.civ@mail.mil

3. Destroy the documents once they are no longer required to support this
solicitation.

Recipients shall NOT:

1. Redistribute the documentation outside their company/organization, to include
other subsidiaries within the corporate structure.

All questions in response to this solicitation, including questions on technical documents, attachments and exhibits, shall be directed to the Contract Specialist via the e-mail address Andrew.C.Mitchell1.civ@mail.mil; cc the Contracting Officer, email victoria.m.watkins.civ@mail.mil.

Notice history

Notice Type Posted
This notice Latest Award Notice
Family of Weapons Sights - Sniper - Special Notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors