Algorithms for Modular Remote Expendable Sensor Array

Closed Solicitation Posted

Solicitation number
A244-049
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

More information

Notice details come from DoD SBIR/STTR (DSIP). Updated .

About this opportunity

The Department of the Army is soliciting Phase I SBIR proposals under topic A244-049, "Algorithms for Modular Remote Expendable Sensor Array," with proposals due July 30, 2024, a deadline that has passed as of today. The set-aside is Total Small Business, and the topic is ITAR-controlled.

Offerors must disclose any proposed use of foreign nationals, including countries of origin, visa or work permit types, and the specific tasks those individuals would perform. Proposals must be submitted through the Defense SBIR/STTR Innovation Portal (DSIP). Firms must maintain active SAM registration and align with NAICS 541715 and PSC AC12. The technical volume is limited to five pages for Phase I, and the submission includes a cost volume and an eight-slide commercialization plan.

Phase I requires a conceptual analytical approach for multimodal detection of military threats using a remote wireless sensor network with seismic, magnetic, acoustic, electric field, and chemical sensors capable of detecting G-, V-, H-, L-, and A-series chemical warfare agents, running on constrained microcontrollers with no operating system. Phase I awards fund proposals up to $250,000 for up to six months, structured as firm-fixed-price contracts with payments tied to milestones or deliverables. Phase II covers a 24-month period to develop and demonstrate prototype algorithms, requiring at least six sensor platforms and a gateway, with one or more field trial events per year. Phase III focuses on ruggedization, integration into an Army network, and a target Technology Readiness Level of TRL6 or greater.

Evaluation begins with screening for responsiveness, timeliness, and eligibility, followed by technical peer or scientific review. Proposing firms must meet small business size and ownership requirements and show that the principal investigator is primarily employed by the firm.

Notice text

DoD SBIR topic A244-049

Component: ARMY

Command: CBC

Phase: SBIR Program Phase I Action

Technology Areas: Sensors

Focus Areas: Advanced Computing and Software; Integrated Network Systems-of-Systems; Integrated Sensing and Cyber

Keywords: Sensor Array; Signal Processing; Data Fusion; Magnetic; Acoustic; Seismic; Electro-optical; Electromagnetic; Chemical Hazard Detector

ITAR: Yes

Objective:

Develop and mature decision logic and signal processing approaches for modular, configurable, remotely deployable sensing capabilities surveillance, targeting, or chemical hazard sensing.

Description:

Maneuver elements require situational understanding of adversary actions and the threat conditions in their areas of operation. Friendly forces appreciate limited remote sensing capabilities for remote targeting of adversary assets and chemical hazard threats along routes, zones, and areas of interest throughout their battlespace. Army elements can leverage miniature, low-cost microelectronics-based sensing technology to afford prompt detection of adversary assets and hostile activities to include the possible use of chemical warfare agents to inform long-range fires, effect risk-based maneuver decisions, and avoid chemical hazards.

Advances in microelectronics technology has increasingly enabled functionality and performance in the detection of hazardous chemicals and adversary equipment and actions to include distinguishing between vehicle types and decoys/interferents. The Army Research Laboratory and the Chemical Biological Center have developed a modular system architecture that facilitates the demonstration of remote, air-dropped sensor arrays that incorporate interchangeable sensing modules, enabling the interchange of the sensing and analysis component of the deployable array system while managing the communications and networking functions as well as supplying a power source for each sensing node. The industry should focus the development effort on the decision logic at the sensor node (spoke) as well as at the sensor array fusion node (hub) to reduce raw data at the sensor array edge into actionable decision supportive information.

Phase I:

Develop a conceptual analytical approach for multimodal detection of military threats. The analytics would be hosted on a remote wireless sensor network consisting of multiple multi-modal sensor platforms connected wirelessly to a gateway node. This would allow sharing of data between sensor platforms and the gateway (i.e., a two-tiered hierarchical architecture is possible – though not mandatory). The sensor platforms are assumed to contain multi-modal sensing (e.g., seismic, magnetic field, acoustic, electric field, and chemical sensors able to detect chemical warfare agents including G-, V-, H-, L-, A- series). The sensor array is assumed to haul data via limited data rate wireless means, and signal processing may but does not necessarily be executed in two tiers (sensor edge vs. fusion hub). The sensor network should detect, track, classify and geolocate tactical military vehicles as well as chemical warfare agents. The combined use of geophysical and chemical sensors to improve probability of detection is highly desired. The sensor platforms are constrained, consisting of microcontrollers with no operating system (OS) and the gateway platform contains slightly more processing capacity (low-cost microprocessor with OS). Performers will be supplied with characterized sensor data for each of the mentioned sensing modalities in response to various environmental stimuli along with supporting ground truth/referee data. Constraints on the processor should be considered in the analysis, to include limitations on size, weight, and power consumption. The microsensor arrays should be assumed to operate on limited capacity embedded microcontrollers/application specific integrated circuits with no onboard operating system and minimal communications data rates.

Phase II:

Develop and demonstrate a prototype set of multi-modal algorithms on representative hardware platforms. The system will first be evaluated in a laboratory setting using government furnished data (i.e., recorded target data) and then outdoors against live threats (system need not be ruggedized). Standards for interoperability will also be furnished by the government along with technical assistance for implementation and integration. The government will also provide technical assistance and guidance with wireless communications. The government will also provide recommendations for selection of processing platforms and transducers. The prototype system should contain at least six sensor platforms and a gateway. The test range, targets, and CWA simulants will be provided by the government. Offerors should incorporate one or more field trial events in their proposed program of work per year over the 24-month Phase II period of performance. The government will identify one or more test opportunities per year over the course of the Phase II execution period. Offerors should afford flexibility in the specific time window over which a test event may be programmed.

Phase III:

Refine and ruggedize the system and integrate into a representative Army network. Establish a quality assurance procedure to demonstrate cyber and information assurance reliability of the Phase III performance will likely involve the development of non-recurring engineering (NRE) for the production of consistent and reliable software products. Support a program office with developmental and operational testing and engagement events as opportunities present. Demonstrate the "as published" sensitivity of the modular sensor array against representative adversary movements of personnel or equipment, vehicle types, chemical hazards including G-, V-, H-, L-, A- series threat agents, and objectively demonstrate warning response reliability and performance. The starting Technology Readiness Level (TRL) on completion of the SBIR Phase III execution Period of Performance should be TRL6 or greater. Develop additional commercial products based on the final integrated system and pursue appropriate demonstration and testing opportunities.

Files

File Type Posted
A244-049.pdf PDF
Army_244_R19.pdf PDF

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors