Advanced Notice: Maintenance Dredging of the Long Island Intracoastal Waterway Federal Navigation Project at Quogue Canal and Shinnecock Bay, Suffolk County, New York

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
W912DS24B0016
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Moriches, New York 11955, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers (USACE) New York District is seeking contractors to perform maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Quogue Canal and Shinnecock Bay in Suffolk County, New York. The proposed work involves the removal of approximately 50,000 cubic yards of sand, with placement along the shoreline of West of Shinnecock Inlet, the shoreline of Shinnecock Bay, and on a stockpile on the landward side and covering the riprap on the bay side of Tiana Beach, or at a contractor-furnished, state-permitted upland site. The dredging must be performed to a depth of -6 feet Mean Lower Low Water plus 2 feet allowable overdepth, and the contractor will be required to maintain a minimum production rate of 2,200 cubic yards per calendar day. The work is estimated to cost between $1,000,000 and $5,000,000 and is expected to take place between October 2024 and January 2025.

This is an unrestricted procurement, and the contract will be awarded at the end of August 2024. Liquidated damages of $2,870.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. There are no set-aside designations, and the agency has not named any potential incumbents or current contractors.

Notice text

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Long Island Intracoastal Waterway (LIIW) Federal Navigation Project at Quogue Canal and Shinnecock Bay. The proposed maintenance dredging would remove approximately 50,000 cubic yards (CY) of sand with placement along the shoreline of West of Shinnecock Inlet (WOSI), the shoreline of Shinnecock Bay, and on a stockpile on the landward side and covering the riprap on the bay side of Tiana Beach with the option of upland at a contractor furnished, state permitted site(s), subject to availability of funds. The placement areas are approximately 0.25 to 4 miles from the dredging area. Dredging would be required to a depth of -6 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand.


The purpose of the proposed work is to alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of LIIW by the U.S. Coast Guard and navigational boating interests while providing future beneficial use of the dredged material as shoreline stabilization for WOSI and the shoreline of Shinnecock Bay, and a stockpile on the landward side and covering the riprap on the bay side of Tiana Beach with the option of upland at a contractor furnished, state permitted site(s).


Based on past dredging cycles, it is anticipated that the proposed work will be performed by utilizing a hydraulic cutterhead dredge with the option of a mechanical dredge. Additionally, multiple barges, tugboats, pipeline and land based equipment such as bulldozers, will be needed to perform the work during the dredging or placement activities. The dredging and placement along the shoreline would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located.


Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and maintain an integrated production rate of at least 2,200 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact vessel traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.


The work is estimated to cost between $1,000,000 and $5,000,000. It is the intention of the government to award in end of August 2024 and the proposed work is anticipated to take place between October 2024 and January 2025.


Liquidated Damages of $2,870.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.


This is an unrestricted procurement.

Notice history

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors